Index

References are by chapter and section number.

  • "How is everything?" — 23.7
  • "It was fine" — 23.7, the indifferent guest — 23.1
  • "Yes, chef" as a confirmation protocol — 21.2
  • "You cannot sign for what you did not check" — 34.7
  • 1.40 turns, defense and revision — 22.5, Business Plan
  • 13-period calendar — 31.7
  • 13-week cash forecast — 33.5, 33.7, 33.9
  • 2018 federal tip provisions — 20.3
  • 2020 restaurant bankruptcy wave — 39.6
  • 4-4-5 calendar — 31.7
  • 86 board — 14.6
  • 86 list synchronization across channels — 28.6
  • 86 plan, decided in rehearsal — 9.4
  • 86ing — 14.6
  • 86ing, as a purchasing decision — 13.3, 13.8

A

  • Abatement burn rate per week — 9.2
  • Abatement, rent — 33.5, 33.6
  • ABC test — 20.9
  • Above-unit overhead — 35.3
  • Absence audit — 35.1
  • Absence test, the fourteen-day — 35.1, 35.5
  • Abusive kitchens, cost of — 21.2
  • Acceleration clause — 39.9
  • Accessibility survey and barrier-removal plan — 8.6
  • Accessible parking and exterior route — 8.6
  • Accessible route and accessible dining surfaces — 7.2
  • Accessible seating and the accessible bar — 8.6
  • Accounting periods — 31.7
  • Accounting software and the daily sales report journal entry — 26.4
  • Accounts-payable terms — 33.2, 33.4
  • Accrual vs. cash accounting — 31.9
  • Accrued paid time off at separation — 39.8
  • Acoustic treatment, cost and payback — 3.3, 3.7
  • Acquisition cost framing of commission — 28.4
  • Across-the-board raise, limits of — 21.7
  • Active managerial control — 25.5
  • Actual cash value vs. replacement cost — 8.5
  • ADA and accessible seating (preview) — 3.6
  • ADA compliance — 8.6
  • ADA demand letters — 8.6
  • ADA in design (compliance owned by Ch. 8) — 7.2
  • Adding a salaried position, cost in covers — 32.7
  • Adding a service, pricing the decision — 32.7
  • Adjacent foodservice (hotels, healthcare, contract, campus) — 40.6
  • Adjective trap (concepts made of adjectives) — 2.1
  • Advertising fund — 36.5, 36.6
  • Air balance and building pressure — 7.6
  • Air-chilled vs. immersion-chilled poultry — 13.2, 13.4
  • Alcohol server certification and recertification — 8.4
  • Alcohol server training — 40.3
  • Alcohol service without a license — 9.5
  • Alcohol to go and alcohol delivery — 28.7
  • Alert fatigue — 37.7
  • all day — 14.4, 14.6
  • All-reservation, all-walk-in, hybrid postures — 22.4
  • Allergen information without a server — 30.6
  • Allergen labeling on off-premise orders — 28.7
  • Allergen line on a menu — 10.6
  • Allergen matrix — 18.5
  • Allergen matrix, decay and version control — 25.6
  • Allergen protocol, order to plate — 25.6
  • Allergen protocol, six steps — 18.5
  • Allergens after a re-cost — 12.6
  • Allergens, and specification changes — 11.8
  • Allergens, the nine major — 18.5
  • Allergens, the nine major U.S. — 25.6
  • Allowable plate cost (inverted target) — 11.5
  • Allowance (construction) — 6.6
  • Allowance reconciliation (from Ch. 6) — 7.6
  • Alterations trigger (accessibility) — 7.2
  • Amortization — 5.4
  • Amortization schedule, ten-year — 5.4
  • Anaphylaxis response and stock epinephrine — 25.6
  • Anchor item — 10.7
  • Anchoring, price, on a wine list — 16.4, 16.8
  • Announced versus unannounced visits — 37.3, 37.7
  • Annual employment-attorney review — 20.6, 20.9, Business Plan
  • Annual re-price pass — 10.8
  • Annualized vs. realized-in-ninety-days — 39.3
  • Anti-levers (parties, employee of the month, swag) — 21.7
  • Anti-SLAPP statutes — 23.6
  • Apple Business Connect, Bing Places — 27.2
  • Application package contents — 5.3
  • Approved suppliers and required purchases — 36.2, 36.5
  • Area development agreement — 36.9
  • Argon and inert-gas preservation — 16.5, 16.6
  • Arrival curve, reshaping — 24.3, 24.8
  • Arrival shape — 22.3
  • arrival shape, capacity and — 14.3, 14.4
  • As-purchased (AP) cost — 11.3
  • Ash disposal and fire risk — 25.9
  • Assessments and network dues — 26.7
  • Assignment and subletting — 6.5
  • Assignment for the benefit of creditors (ABC) — 39.6
  • Assignment of contracts on sale — 8.7
  • Assumptions register — 4.4, 4.5, 4.6, 4.7
  • Assumptions register, how to build — 4.4
  • At-will employment — 17.7
  • At-will employment, handbook risk — 21.6
  • Atmosphere (servicescape) — 3.3, 3.7
  • Atmosphere capital cost — 3.7
  • Atmosphere carrying cost — 3.7
  • Atmosphere cost per cover — 3.7
  • Attachment rate — 2.5, 10.7
  • Attribution — 27.9
  • Attrition rate, modeling — 23.4
  • Audit gaming and countermeasures — 37.3, 37.7
  • Audit types: self, peer, leadership, third-party — 37.3
  • Audit weighting and critical items — 37.3
  • Auto-deducted meal breaks — 20.6, Business Plan
  • Auto-renewal (evergreen) clauses and notice windows — 8.7
  • Automatic stay — 39.6
  • Average check (per-person average) — 1.7
  • Average check, as a forecast assumption — 4.3, 4.6
  • Average check, as a RevPASH lever — 24.2, 24.5, 24.6
  • Average order value as a lever — 30.5
  • Average vs. median in an Item 19 — 36.4
  • Avoidable vs. allocated fixed cost — 32.4, 32.7

B

  • Bacillus cereus — 25.1
  • Back bar, tiering and layout — 15.5
  • Back of house (BOH) — 7.1, 7.3
  • Back-of-house inclusion in a tip pool — 20.3
  • Backfill from a waitlist — 35.4
  • Backfilling the original unit — 37.8
  • Background check — 17.6
  • Background checks and source-of-funds disclosure — 8.3
  • Backlog, minutes per cover over capacity — 22.3, 22.6
  • Backward planning from a committed opening day — 9.2
  • Balance sheet, in brief — 31.9
  • Ban-the-box and fair-chance laws — 17.6
  • Bank (drawer starting cash) — 34.2
  • Banquet event order (BEO) — 29.4
  • Banquette 40-top — 29.2, 29.3, 29.7
  • Banquette run, combining to a 40-top — 22.2, 22.4
  • Bar as a station (workflow, service well, speed rail) — 15.3, 15.5
  • Bar as unreservable inventory — 22.4
  • Bar as waitlist holding pen — 22.4
  • Bar geometry: guest side vs. working side — 7.2
  • Bar hand sink, ice scoop, glass washer — 22.7
  • Bar inventory, capital tied up in — 15.6
  • Bar seats as overflow inventory — 24.4, 24.8
  • Bar seats, revenue behavior of — 15.1
  • Bar tabs vs. single-drink transactions — 26.7
  • Bar-driven concepts — 1.6
  • Bare-hand contact with ready-to-eat food — 25.1, 25.4
  • Bartender to beverage director — 40.1
  • Base rates in variance investigation — 34.6
  • Base rent — 6.4
  • Baseline test (dine-in covers before and after) — 28.3
  • Basis points, what one is worth — 26.7, 26.9
  • batch cooking — 14.7
  • Batch recipe costing — 11.2
  • Batch settlement discipline — 26.7
  • Batch size and waste — 38.3
  • batch size, labor vs. waste tradeoff — 14.7
  • Batch yield, measuring — 11.2, 11.4
  • Becoming a franchisor as a regulated act — 36.7
  • Beer, package (bottles and cans) — 15.4
  • Beer-clean glassware — 15.4, 15.5
  • Behavioral signals of dissatisfaction — 23.7
  • Behavioral vs. hypothetical questions — 17.4
  • Bellwether burger — 12.1, 12.5, 12.6
  • Bellwether dinner menu (Figure 10.2) — 10.2
  • Bellwether off-premise decision — Business Plan checkpoint 28
  • Bellwether under a franchise agreement — 36.6
  • Bellwether, kitchen operations section — 14.3, 14.4, 14.7
  • Bellwether: opening inventory — 13.7, Business Plan
  • Bellwether: order guide (54 lines, 8 programs) — 13.3, Business Plan
  • Bellwether: poultry par (24 / 28 birds) — 13.3
  • Bench, the two empty rungs — 21.8
  • Benchmarking prices vs. benchmarking positions — 2.4
  • BEO, beverage authorization and notify threshold — 29.4
  • Beverage attachment — 12.7
  • Beverage attachment as a satisfaction signal — 23.7
  • Beverage attachment points on a food menu — 10.7
  • Beverage attachment, absence in off-premise — 28.2
  • Beverage attachment, arithmetic of — 18.3
  • Beverage attachment, in behavior — 18.3
  • Beverage contribution, annual and weekly — 15.1, 15.7
  • Beverage mix, effect on the CM ratio — 32.2
  • Beverage order to drinks on the table — 22.1
  • Beverage plate-up: cocktails and by-the-glass — 9.4
  • Beverage share of revenue (28% mix) — 15.1, Business Plan
  • Beverage transfer to the kitchen — 15.2, 15.7
  • Bidding and bid leveling — 6.6
  • Big Six pathogens — 25.1
  • Bill Emerson Good Samaritan Food Donation Act — 38.4
  • Bin-end feature, as an exit for dead inventory — 16.8
  • Binding constraint, identifying by service — 24.5
  • Bitters, costing — 15.3
  • Blackout experiment — 28.3, 28.8
  • Blast chiller, payback analysis — 25.2
  • Blend and extend — 39.5
  • Blended average check — 4.3
  • Blended check average — 23.2, 23.6
  • Blended cost of goods sold — 15.1, 15.7
  • Blended hourly rate — 19.4, 19.8
  • Blind records / blind count — 34.1, 34.8
  • Boil-water advisory as a closure trigger — 25.7
  • Bonus design, single-metric risk — 37.7
  • Bonus gates (sales floor, quality, retention) — 40.4
  • Boomerang hires (returning alumni) — 17.3
  • Borrowing on a track record — 35.6
  • Bottle conversions (750 mL, 1 L, 1.75 L) — 15.3
  • Bottle-price laddering — 16.4, 16.8
  • Bottom-up labor build vs. percentage-of-sales model — 19.4, 19.8
  • Bottom-up sales forecast — 4.3
  • Bounded versus unbounded loss — 35.6
  • Brand — 3.1, 3.6
  • Brand consistency — 37.3, 37.8
  • Brand drift — 3.6
  • Brand identity — 3.1, 3.6
  • Brand vs. concept vs. marketing — 3.1
  • Bread dough, one dough many uses — 10.3
  • Bread service, cost of — 11.2
  • Break-even by daypart — 32.4
  • Break-even cannibalization rate — 28.3
  • Break-even chart — 32.3
  • Break-even check lift — 3.7
  • Break-even covers — 32.3
  • Break-even covers per night — 32.3, 32.4, 32.8
  • Break-even hurdle for a second unit — 35.3
  • Break-even ladder, dinner covers — 39.1
  • Break-even point — 32.3
  • Break-even reasoning under unmeasurable returns — 23.4, 23.6, Conclusion
  • Break-even sales — 32.3, 32.6, 32.7
  • Break-even sales (preview) — 4.6
  • Break-even sales lift on a royalty — 36.6
  • Break-even summary (66 / 77 / 81 / 95 / ~132) — 40.7, 40.9
  • Break-even volume multiplier — 15.8
  • Breakage, glassware — 16.6
  • Bridge financing — 33.8
  • brigade de cuisine — 14.3
  • Brigade de cuisine — 21.2
  • Broadline distributor — 13.1
  • Broker representation and commission — 6.3
  • Brunch economics — 32.4, 32.7
  • Brunch menu (Figure 10.9) — 10.8
  • BTG yield — 16.5
  • Budget boundary: hood in construction vs. equipment — 7.5, 7.6
  • Buffet vs. plated — 29.7
  • Build-out — 6.6
  • Building plan review as a gate — 9.2
  • Bundled processing, the "free POS" — 26.2
  • Burnout, ICD-11 definition — 21.4
  • Burnout, restaurant-specific mechanics — 21.4
  • Burnout, warning signs — 21.4
  • Burns, hearth and fryer — 25.9
  • Business case, sustainability — 38.8
  • Business entity, choosing — 8.1
  • Business interruption and extra expense — 8.5
  • Business license and business tax registration — 8.2
  • Business plan — 4.1, 4.2, 4.7
  • Business plan, anatomy of — 4.2
  • Business plan, appendix contents — 4.2
  • Business plan, length of — 4.2
  • Business plan, menu-engineering appendix — 12.3, 12.6
  • Business plan, readers of — 4.1
  • Business plan, what a lender actually reads — 40.7
  • Business-interruption insurance — 33.3
  • Butcher test — 11.4
  • Butchery labor and the food-cost/labor trade — 10.3
  • Buy-sell provision — 40.4
  • Buyout — 29.2, 29.3
  • Buyout, \$1 vs. fair market value — 5.6
  • Buyout, pricing against displacement — 29.2, 29.7
  • By-product credits — 11.4
  • By-the-glass (BTG) program — 16.2, 16.5, 16.7
  • By-the-glass concentration as a symptom — 18.3

C

  • C corporation — 8.1
  • Calibration, ice-point method — 25.2
  • California SB 1383 — 38.4
  • Call brands — 15.5
  • calling (a ticket) — 14.4
  • Calling in staff, arithmetic of — 19.6
  • Callout rotation and premium — 21.4
  • CAM and the annual reconciliation / true-up — 6.4
  • CAM caps, exclusions, and audit rights — 6.4
  • CAN-SPAM Act — 27.5
  • Cancellation terms — 29.5
  • Cancellation vs. no-show, why the distinction matters — 24.7
  • Candidate bench — 17.4, 17.8
  • Candle program economics — 3.7
  • Cannibalization — 35.4, 37.6
  • Cannibalization, break-even adjustment for — 32.7
  • Cannibalization, of a promotion — 15.8
  • Capacity math: seats × turns × check × services — 7.1
  • Capacity statement (business-plan artifact) — 7.1
  • Capacity utilization — 24.2, 24.3, 24.5
  • Capacity, standing, and information — 23.8
  • Capacity-constrained vs. demand-constrained nights — 3.3, 3.7
  • Capital contributions vs. allocations vs. distributions — 8.1
  • Capital replacement reserve — 32.8
  • Capital stack — 5.1
  • Capital stack, Bellwether — 40.5, 40.7
  • Capital stack, order of repayment — 5.1
  • Capital tied up in inventory — 16.6, 16.8
  • Capital vs. revenue ceiling vs. personal exposure — 30.1
  • Capture rate — 2.3
  • Card data handling, front of house — 22.7
  • Card minimums — 26.7
  • Card processing, effective rate — 34.4
  • Card settlement against the processor batch (tie three) — 34.4
  • Card settlement timing — 33.2, 33.7
  • Card volume, building it from net sales — 26.7
  • Card-not-present interchange premium — 26.6, 26.7
  • Career ladder, back of house — 40.1, 40.2
  • Career ladder, front of house — 40.1, 40.2
  • Carrying cost of inventory — 16.6
  • Cash as a share of tender — 34.2
  • Cash break-even — 32.8
  • Cash break-even (from Ch. 32) — 33.1, 33.6
  • Cash conversion cycle — 33.2
  • Cash discounting — 26.7
  • Cash drop — 34.2
  • Cash expected against cash counted (tie two) — 34.4
  • Cash flow vs. profit — 33.1, 33.6
  • Cash handling procedures — 34.2
  • Cash on delivery (COD), cash impact of — 39.5
  • Cash policy, written — 33.9
  • Cash timing — 1.4
  • Cash trough, depth vs. burn — 39.2
  • Cash-and-carry, as a system defect — 13.1, 13.3
  • Casualty and restoration — 6.5
  • Catch-weight billing — 13.2, 13.4
  • Catering ceiling set by the building — 35.7
  • Catering, real margins of — 35.7
  • Central production, four conditions — 37.5
  • Centralized risk and traceability — 37.5
  • Cents per dollar borrowed (debt constant) — 5.1, 5.6
  • Certificate of insurance — 8.7
  • Certificate of occupancy — 8.2
  • Certificate of occupancy (preview) — 6.7
  • Certificate of occupancy as a gate — 9.2, 9.5
  • Certificate of occupancy, and rent commencement — 33.5
  • Certification checklist / card — 18.6
  • Certification gate — 18.6
  • Certification schedule — 18.5, 18.6
  • Certification, sommelier and wine — 16.7
  • Certified Development Company (CDC) — 5.3
  • Certified food protection manager — 18.5, 40.3
  • Certified food protection manager (CFPM) — 25.7, 25.8
  • Change order and the five categories — 6.6
  • Change-order log — 6.6
  • Channel cost as a third pole of analysis — 30.5
  • Channel math, worked order — 28.2
  • Chapter 1's open questions, answered — 40.7
  • Chapter 11 bankruptcy — 39.6
  • Chapter 7 bankruptcy — 39.6
  • Charged tips as money owed to staff — 34.4
  • Charging the balance on the night — 29.5
  • Cheap concept tests (pop-up, residency, counting covers) — 2.7
  • Check average, building from attachment rates — 2.5
  • Check build reconciliation — 10.7
  • Check drop, the second decline — 22.7
  • Check settle, the eight recoverable minutes — 22.5, 22.7
  • Chipotle 2015 outbreaks — case study 2
  • Chlorine sanitizer — 25.4
  • Choice overload — 10.6
  • Chronic waste, distinguishing — 34.5
  • Citrus, yield and costing — 15.3
  • Civil vs. administrative exposure — 8.4
  • Cleaning vs. sanitizing — 25.4
  • Clopen / turnaround time — 21.4
  • Clopening / rest-period rules — 20.7, Business Plan
  • Closed questions vs. "how was everything?" — 9.5
  • Closing a section, the forty-five-minute rule — 22.2, 22.8
  • Closing decision, forward-looking — 39.7
  • closing log — 14.8
  • Closing manager's sequence at close — 34.2
  • closing procedures — 14.8
  • Closing sequence, T−30 to T+90 — 39.8
  • Closing the loop — 23.7
  • Clostridium perfringens — 25.1, 25.2
  • Closure floor — 39.7, Business Plan
  • Co-packer minimum run, as a risk — 35.7
  • Co-tenancy — 6.5
  • COBRA and state continuation — 39.8
  • Cocktail cost card — 15.3
  • Cocktail list size and cross-utilization — 15.5
  • Cocktail training for servers — 18.3
  • COD terms — 33.2, 33.4
  • Coinsurance penalty — 8.5
  • Cold holding — 25.2
  • cold holding, plating ahead and — 14.4, 14.7
  • Cold rail, failure modes — 25.2
  • Collateral — 5.1, 5.3
  • Collateral gap in restaurants — 5.1, 5.3
  • Collections vs. sales — 33.7
  • Collision months — 33.5, 33.6
  • Combinable two-tops, specification at build-out — 24.4
  • Combined downside case — 4.6
  • Combining two-tops into a four-top — 22.2
  • Commercial umbrella and scheduled underlying policies — 8.5
  • Commissary / central production — 37.5
  • Commissary agreement — 30.2, 30.7
  • Commissary and temporary permits — 29.8
  • Commissary break-even arithmetic — 37.5
  • Commissary kitchen — 30.2, 30.7
  • Commission and food cost, the interaction — 28.2
  • Commission caps, 2020 ordinances — 28.9
  • Commission rate, range and structure — 28.1, 28.2
  • Commitment fee, unused-line — 33.8
  • Commodity price shocks, responding to — 11.8
  • Common-law trademark rights — 3.2
  • Community claims vs. supply-chain claims — 38.7
  • Comp — 34.3
  • Comp / void / discount authorization — 34.3
  • Comp and discount abuse — 34.6
  • Comp and influencer policy — 27.6
  • Comp and spill tracking — 15.7
  • Comp arithmetic: menu price vs. plate cost — 23.4
  • Comp authority for servers — 18.4
  • Comp base and exclusion of new units — 37.6
  • Comp break-even probability — 23.4
  • Comp budget as a percentage of sales — 23.4, Business Plan
  • Comp codes — 27.9
  • Comp cost vs. lifetime value — 18.4
  • Comp reason codes — 34.3, 34.4
  • Comp reason codes (SVC-1 … SVC-5, MKT-1) — 23.4, Business Plan
  • Comp report as a culture document — 21.1
  • Comparability problem (count date, item list, category map, labor classification, period calendar, accruals) — 37.6
  • Comparable-store (comp) sales — 37.6
  • Compensation structure — 40.4
  • Competitive set — 2.4
  • Complaint economics — 23.4, 23.7
  • Compliance calendar — 8.2, 8.7, 20.6, Business Plan
  • Compliance tracker, expiry dates — 18.6
  • Compostable packaging — 38.6
  • Composting, commercial — 38.4
  • Comps — 31.8
  • Comps and buybacks — 15.7
  • Comps and voids, effect on mix — 12.2
  • Comps as a distortion of food cost percentage — 23.4
  • Comps as contra-revenue — 31.8
  • Comps by daypart — 34.3
  • Comps misrecorded as marketing expense — 31.8
  • Comps, costing against usage — 11.7
  • Concept as a chain of dependent decisions — 2.1
  • Concept fit — 10.2
  • Concept pivot — 39.4
  • Concept problem vs. execution problem vs. math problem — 39.1
  • Concept scorecard — 2.7
  • Concept stress test — 2.7
  • Concept test, cheapest available — 30.4
  • Concept-market fit — 2.7, Business Plan checkpoint
  • Conditional-use / special-use permits and hearings — 8.3
  • Conditional-use permits and hours restrictions — 2.3
  • Conduct complaint vs. conflict — 21.5
  • Confidence levels in a register — 4.4
  • Confidentiality clauses, disclosure of — 36.3
  • Connected gas load — 7.5, 7.6
  • Consecutive days off — 21.4, 21.7
  • Consistency and the cost of drift — 3.6
  • Consistency test in discipline — 21.6
  • Consolidated versus per-unit reporting — 37.6
  • Constrained station, converting items to covers — 22.3
  • Constraint test — 28.3, 28.6
  • Construction contingency — 1.4, 6.6
  • Construction contingency vs. reserve — 5.1, 5.2
  • Construction contingency, held not spent — 7.6
  • Construction cost per square foot — 6.6
  • Constructive dismissal, cutting hours as — 34.9
  • Consulting — 40.6
  • Consumer advisory, raw or undercooked items — 25.7
  • Consumer Review Fairness Act — 23.6, 27.3
  • Contamination of an investigation — 34.6
  • Content cadence — 27.4
  • Contingency, why it must not be banked — Business Plan checkpoint
  • Continuous-operation covenant — 6.5
  • Contribution by channel, indexed to dine-in — 28.2
  • Contribution margin (CM) — 12.1, 12.3, 12.5, 12.6
  • Contribution margin per cover — 32.2, 32.4, 32.7
  • Contribution margin per station-hour — 12.7
  • Contribution margin ratio — 32.2, 32.3, 32.4
  • Contribution margin, per item (preview) — 11.2, 11.4, 11.5
  • Contribution margin, weighted — 12.3, 12.6
  • Contribution per constrained unit — 28.6
  • Contribution per cover — 23.2, 23.3, 23.4
  • Contribution per cover, as a marketing ceiling — 27.1
  • Contribution per crew hour — 30.3
  • Contribution per marginal revenue dollar — 4.6
  • Contribution vs. percentage, in daypart decisions — 19.2
  • Control environment, what it is for — 34.1
  • Control functions (authorize, record, custody, reconcile) — 34.1
  • Control jurisdictions — 8.3
  • Control program, pricing a — 34.6
  • Control states — 16.3
  • Controllable income — 31.4
  • Controllable vs. non-controllable cost — 31.4
  • Controls protect the innocent — 34.8
  • Convenience products, evaluating — 11.3
  • Conversion card / bag insert — 28.4, 28.9
  • Conversion franchising — 36.9
  • Cook's pivot / station triangle — 7.4
  • Cooking at home as a competitor — 2.4
  • Cooking temperatures, minimum internal — 25.2
  • Cooking yield vs. trim yield — 11.3
  • Cooling as a geometry problem — 25.2
  • cooling log — 14.7, 14.8
  • Cooling, two-stage — 25.2, 25.5
  • Coordination time, fixed per event — 29.7
  • Copyability of a differentiator — 2.6
  • Core (C) items — 25.7
  • Cork taint (TCA) — 16.6
  • Corkage — 16.8
  • Corporate foodservice roles — 40.6
  • Corrective action, HACCP principle five — 25.5, 25.8
  • Cost behavior, sorting a P&L by — 32.1
  • Cost card, what it excludes (labor, fuel) — 11.2
  • Cost drift — 1.4
  • Cost drift from owner absence — 21.4, 21.8
  • Cost drift, quantified on one item — 11.6
  • Cost of a bad hire retained — 17.1
  • Cost of a checked claim — 38.8
  • Cost of a license delay and of a denial — 8.3
  • Cost of a schedule slip after hiring — 9.2
  • Cost of capital, applied to inventory — 16.6
  • Cost of capital, by layer — 5.1
  • Cost of capital, three ways (rate, guaranty, control) — 35.6
  • Cost of construction delay — 6.7
  • Cost of goods sold (COGS) — 1.2, 31.3
  • Cost of permission per cover — 8.5
  • Cost of training one new hire — 18.2
  • Cost of vacancy — 17.1
  • Cost of waiting — 39.7
  • Cost per cover acquired — 27.1, 27.9
  • Cost per cover acquired, numerator and denominator rules — 27.1
  • Cost per cover, blunt vs. acquired — 27.1
  • Cost per new guest acquired — 23.2
  • Cost-plus pricing — 13.1
  • Costed menu (Business Plan) — 11.2, 11.5, Business Plan checkpoint
  • Cottage-food operations, graduating from — 30.7
  • Count route, fixed — 13.5, 13.6
  • Count sheet, in shelf order — 13.5, 13.6
  • Counting cadence (weekly, monthly, keg log) — 15.6
  • Counting rotation and who counts what — 34.8
  • counts (as alternative to an 86) — 14.6
  • Coursing and the FOH/BOH handshake — 24.5
  • Coursing, fire against cook time — 22.6
  • Covenant threshold arithmetic — 40.8
  • Covenants (affirmative, negative, financial) — 5.4
  • Cover — 1.7
  • Cover bands — 19.4
  • Cover cap per quarter hour, eight covers — 22.3, 22.8
  • cover ceiling, derivation of — 14.3
  • Cover count, mandatory entry — 26.1, Business Plan checkpoint
  • Cover-count undercount, effect on PPA and covers per labor hour — 26.1
  • Covers by daypart, Bellwether — Business Plan checkpoint
  • Covers per labor hour (CPLH) — 19.4, 19.8
  • Covers, annual — 4.3
  • Covers, limits of as a metric — 24.2, 24.3
  • COVID-19 shutdowns, effect on off-premise — 28.1
  • Credit CARD Act of 2009 — 27.7
  • Credit memo — 13.4
  • Credit memorandum — 40.8
  • Credit memorandum Finding 1 (labor) — 40.8, 40.10
  • Credit memorandum Finding 2 (pre-opening) — 40.8, 40.10
  • Credit terms on alcohol purchases — 16.3
  • Credit-card processing as a variable cost — 32.1, 32.2
  • Credits tracked to closure — 34.7
  • Critical path and schedule slippage — 6.7
  • Cross-checking a forecast top-down — 4.3
  • Cross-contact — 25.6
  • Cross-contamination — 25.3
  • Cross-review between partners — 34.1
  • Cross-training — 18.7
  • Cross-training and retention — 18.7
  • Cross-training, four limits of — 18.7
  • Cross-unit employment as a culture metric — 37.8
  • Cross-utilization — 10.3
  • Cross-utilization as source reduction — 38.3
  • Cross-utilization at small volume — 10.3
  • Cross-utilization map — 10.3
  • Cross-utilization, as a costing technique — 11.4
  • Cross-utilization, effect on cutting items — 12.7
  • Cross-utilization, effect on safety stock — 13.3, 13.8
  • Crossings between BOH and FOH ladders — 40.1
  • Culinary and hospitality education as a career — 40.6
  • Culinary school, economics of — 40.3
  • Culinary schools as a pipeline — 17.3
  • Culture & Retention plan section — Business Plan checkpoint 21
  • Culture audit, four documents — 21.1
  • Culture measurement proxies — 37.8
  • Culture transfer by people — 37.8
  • Currency symbols and menu prices — 10.6, 10.7
  • Cushion versus headroom, in covers — 35.4, 35.8
  • Cut order — 19.5, 19.6
  • Cut-resistant gloves and the mandoline — 25.9
  • Cuts and lacerations — 25.9
  • Cutting cost in a downturn, limits of — 32.5
  • Cutting the floor — 19.5, 19.6

D

  • Daily holdback — 33.8
  • Daily sales report (DSR) — 34.4
  • Danger zone, temperature — 25.2
  • Dark day (Monday) uses — 7.7
  • Dark daypart, converting — 30.4
  • Dark days, selling capacity on — 24.8
  • Data ownership and export clauses — 26.8, Business Plan checkpoint
  • Data retention at the vendor — 26.1, 26.8
  • Date change vs. cancellation — 29.5
  • Date marking and labeling — 13.5
  • Date marking, seven-day limit — 25.2
  • Day-one preparation — 17.7, 17.8
  • Daypart — 2.3
  • Daypart capping a virtual brand — 30.6
  • Daypart contribution statement — 32.4
  • Daypart fit and site selection — 6.1
  • Daypart pivot, lunch arithmetic — 39.4
  • Daypart price differences — 10.8
  • Daypart-shape test — 28.3
  • Days inventory outstanding (DIO) — 33.2
  • Days of cover — 16.6, 16.8, 40.8
  • Days of inventory on hand — 13.7
  • Days payable outstanding (DPO) — 33.2, 33.4, 33.9
  • Days sales outstanding (DSO) — 33.2
  • Daytime vs. residential population — 2.3
  • Dead section — 22.2
  • Deadlock and buy-sell provisions — 8.1
  • Debt principal, invisible on the P&L — 33.1, 33.6
  • Debt service coverage ratio (DSCR) — 5.4
  • Debt service in a break-even calculation — 32.8
  • Debt service, Bellwether (\$69,500) — 40.5, 40.8
  • Debt service, principal vs. interest — 31.9
  • Debt vs. equity from family — 5.7
  • Debtor-in-possession — 39.6
  • December premium — 29.3, 29.9
  • Decision rights, undefined — 21.5
  • Decision-rights map — 21.5
  • Decomposing an annual prime-cost target into a ramp — 9.7
  • Dedicated packer, break-even volume — 28.6
  • Deductions from tips or wages, prohibited — 20.2, 20.3
  • Defending an assumption — 40.9
  • Deferred revenue — 33.7, 33.9
  • Defined workweek — 19.7
  • Degree of operating leverage (DOL) — 32.5, 32.6
  • Delegation ladder, levels 0–5 — 21.8
  • Delegation, the hardest transition — 30.8
  • Delegation-of-authority table — 37.4
  • Delinquency lists, alcohol — 16.3
  • deliveries, effect on prep — 14.1
  • Delivery commission, blended rate — 30.5
  • Delivery condition — 6.2, 6.3
  • Delivery minimums and freight thresholds — 12.7
  • Delivery price parity and off-premise uplift — 28.5
  • Delivery window, negotiating — 13.1, 13.4
  • Delivery-only second brand from an existing kitchen — 30.8
  • Demand-based pricing — 24.6
  • Demand-constrained nights, selling — 29.1, 29.9
  • Demand-control ventilation (DCV) — 38.5
  • Demographic data sheet, reading a — 2.3
  • Denominator, choice of (base week vs. average week vs. mature week) — 19.1, 19.8
  • Departed franchisees, calling them — 36.3, 36.4
  • Deposit policy design — 24.7
  • Deposit preparation and transport — 34.2
  • Describing food without a script — 18.3
  • Descriptive menu language, evidence status — 10.6
  • Design language — 3.6
  • Designing for each daypart — 7.7
  • Designing for future revenue lines — 7.7
  • Deviation and communication rule — 18.4
  • Deviation versus improvement — 37.1, 37.2
  • Diagnostic procedure, five steps — 39.1
  • Differentiation that does not matter — 2.6
  • Differentiation, three-part test — 2.6
  • Dilution, shake and stir — 15.3
  • Dine time, anatomy of — 24.5
  • Dipper well — 38.5
  • Direct booking channel — 24.7
  • Direct booking channels — 26.5
  • Direct delivery and delivery-as-a-service — 28.4
  • Direct purchasing (farm, producer) — 13.1
  • Direct vs. indirect competitors — 2.4
  • Discard, undocumented temperature abuse — 25.3, 25.7
  • Discharge, entity vs. individual — 39.6
  • Disclosure and the honesty problem — 30.6
  • Discount break-even (d ÷ c rule) — 23.2
  • Discount depth vs. contribution margin ratio — 23.2
  • Discount terms (2/10 net 30) — 33.4
  • Discount, arithmetic of — 15.8
  • Discounting future guest value — 23.2
  • Discounting, cost of — 12.5
  • Discounts — 31.8
  • Dish machine, final rinse verification — 25.4
  • Dish pit design — 7.3
  • Dish return path and crossings — 7.4
  • Disher (scoop) numbering — 11.6
  • Displacement — 29.7
  • Dispute resolution, arbitration, venue, choice of law — 36.5
  • Dispute window in a supply agreement — 34.7
  • Distance restrictions and how they are measured — 8.3
  • Distribution out of the honeymoon quarter — 9.6
  • Distributor relationships, managing — 16.3, 16.6
  • District manager, failure modes — 37.4
  • District-manager model — 37.4, 37.7
  • Diversion — 38.4
  • Docking a salaried manager — 20.5
  • Document abuse — 17.7, 20.9
  • Documentation as a by-product of measurement — Business Plan
  • Documentation test — 36.7
  • Documentation, behavior vs. character — 21.6
  • Documented standards as legal exposure — 37.2
  • Documenting before acting — 34.9
  • Dog (quadrant) — 12.4, 12.5, 12.7
  • Dollars at risk vs. minutes of attention — 34.6
  • Domain and social handle claiming — 3.2
  • Donation, food-safety constraints on — 38.4
  • Double-seat, the four-minute rule — 22.1, 22.2, 22.3
  • Downgrade — 26.7
  • Downside case (Bellwether) — 39.1, Business Plan
  • Draft beer pricing ladder — 15.4
  • Draft system: temperature, pressure, balance — 15.4
  • Draft yield and foam loss — 15.4
  • Dram shop liability — 8.4
  • Dram shop liability (bar-level practice) — 15.7
  • Dram shop liability (preview) — 1.6
  • Dram shop liability, and wine service — 16.7
  • Dram-shop liability, training against — 18.5
  • Draws and draw schedule — 5.3, 5.5
  • Drink counting and the bar-to-table handoff — 8.4
  • Drive time vs. concentric rings — 2.3
  • Driver classification — 28.9
  • Driver flow and the guest path — 28.6
  • dry-aged ribeye, throughput cost of — 14.4
  • DSCR covenant — 40.8
  • DSCR, computing and stressing — 5.4
  • DSCR, limits of — 5.4
  • DSR, the three reconciliations inside — 34.4
  • Due-diligence period and right of entry — 6.3
  • Duration management — 24.5
  • Duties test / primary duty — 20.5, 20.9
  • dwell time — 14.3
  • Dwell time on the fire — 10.4
  • Dwell versus cycle — 22.5

E

  • E-Verify — 20.9
  • Early bumping, the metric as target — 26.3
  • Early prix fixe, fenced three ways — 24.8
  • Early punches vs. unrecorded work — 20.1, 20.6
  • Early seating, staging the room for — 24.8
  • Early warning signs — 33.9
  • Early-termination and liquidated-damages formulas — 8.7
  • Earned media — 27.6
  • EBITDA — 31.9
  • Economic repeatability test — 36.7
  • Economic-reality test — 20.9
  • Edible-portion (EP) cost — 11.3
  • Effective rate, two denominators — 26.7, 26.9
  • Effective take rate — 28.2, 28.8, 28.9
  • Efficient versus rushed, the line — 22.5
  • Egress, exit count and width — 7.2
  • Eight-second description — 18.3
  • EIN (Employer Identification Number) — 8.1
  • Electrical service and panel capacity — 7.6
  • Email and SMS lists — 27.5
  • Email list capture at the window — 30.3, 30.8
  • Ember trout (anchor item) — 12.1, 12.3, 12.5, 12.7
  • Emergency relief programs (PPP, RRF) — 33.8
  • Emotional labor — 21.4
  • Employee attestation of hours — 20.6
  • Employee health policy, exclusion and restriction — 25.1
  • Employee health reporting and sick pay — 18.5
  • Employee meals at cost — 31.3
  • Employer payroll burden (FICA, unemployment, workers' compensation) — 9.1, 9.3
  • Employer payroll taxes (FICA, FUTA, SUTA) — 19.1, 19.7
  • Employer withholding and unemployment accounts — 8.1
  • Employment practices liability insurance (EPLI) — 20.8, Business Plan
  • EMV liability shift — 26.7
  • Energy intensity — 38.5
  • Engagement benchmarks, refusal of — 27.4
  • Entity holding the liquor license; ownership change as transfer — 8.1, 8.3
  • Entity name vs. DBA vs. trademark — 3.2
  • Entry and vestibule — 7.2
  • Entrée attachment rate — 12.2, 12.7
  • EPLI — 8.5
  • Equipment breakdown and spoilage coverage — 8.5
  • Equipment finance agreement, non-cancellable — 26.2
  • Equipment fit — 10.2
  • Equipment lease — 5.6
  • Equipment lease and used-asset financing — 7.5
  • Equipment lease, as a cash obligation — 33.1, 33.5
  • Equipment line displacement and declared deferral — 7.6
  • Equipment liquidation and liens — 39.8
  • Equipment schedule — 7.5
  • Equipment tags and utility requirements — 7.5
  • Error and refund allowances by channel — 28.8
  • Escalation clause — 6.4
  • Escalation ladder and the bypass — 37.7
  • Escoffier, Georges Auguste — 21.2
  • Establishing a pattern, not an incident — 34.9
  • Event calendar strategy — 29.9
  • Event costing — 29.7
  • Event deposit — 29.5
  • Event deposits, as working capital — 33.7, 33.9
  • Event deposits, return of — 39.8
  • Events as guest acquisition — 29.9
  • Events coordinator, costing the time — 35.7
  • Events, certainty vs. margin — 29.1, 29.7
  • Events, measurement against a baseline night — 27.8
  • Events, why margin differs — 29.1
  • Evergreen and automatic renewal clauses — 5.6
  • Evidentiary cost and quality — 34.6
  • Exception report — 34.3
  • Exception reports, shape vs. event — 34.3
  • Exception thresholds, three components of — 37.7
  • Exclusivity and minimum-volume commitments — 8.7
  • Exclusivity clause — 6.5
  • Exclusivity, distributor — 16.3
  • Executive exemption — 20.5
  • Executive summary — 4.2, 4.7
  • Executive summary, risk disclosure in — 4.7
  • Executive summary, the nine moves — 4.7
  • Exempt vs. non-exempt — 20.5, 20.9
  • Exempt vs. non-exempt, effect on the fixed base — 32.1, 32.3
  • Exempt vs. non-exempt, revisited — 40.4
  • Exhaust duct, shaft enclosure, roof penetration — 7.6
  • Exit interview — 21.7
  • Exit plan for slow inventory — 16.8
  • Exit rate vs. quarter result — 9.7
  • expediting — 14.4
  • Experience modification factor (workers' comp mod) — 25.9
  • Expo as a shared station — 40.1
  • Exposure ladder; guaranty vs. insurable loss — 8.5
  • Exposure per point, in dollars — 4.4, 4.6

F

  • Failure rate, closing the loop — 40.10
  • Failure rate, the 90% myth — 1.1
  • Fair Credit Reporting Act (FCRA) — 17.6
  • Fair Labor Standards Act (FLSA) — 20.1, 20.2, 20.5, 20.6, 20.9
  • Fairness problem in restaurant pricing — 24.6
  • Falsifiability of concept claims — 2.1, 2.7
  • family meal — 14.1
  • Family meal beginning on day one of training — 9.3
  • Family meal, costed — 21.7
  • Fast casual — 1.6
  • FASTER Act and sesame — 25.6
  • FDA Food Code as a model code — throughout, Overview
  • FDD Item 11, franchisor's assistance — 36.3, 36.5
  • FDD Item 12, territory — 36.3, 36.5
  • FDD Item 17, renewal / termination / transfer / disputes — 36.3, 36.5
  • FDD Item 19, financial performance representations — 36.3, 36.4
  • FDD Item 20, outlets and franchisee information — 36.3, 36.4
  • FDD Item 21, financial statements — 36.3, 36.8
  • FDD Item 3, litigation — 36.3
  • FDD Item 6, other fees — 36.3
  • FDD Item 7, estimated initial investment — 36.3
  • FDD Item 8, sources of products and services — 36.3, 36.5
  • FDD, the twenty-three items — 36.3
  • February problem — 33.5, 33.6
  • Fee and surcharge disclosure — 24.6
  • Fee load as a share of pre-fee operating profit — 36.6
  • Fee-shifting clauses and security interests — 8.7
  • Feedback-sample bias during the honeymoon — 9.6
  • Fencing (time, day, product) — 24.6, 24.8
  • Festivals and street fairs, fee structures — 30.3
  • Festivals as lead generation — 30.3
  • FICA tip credit — 20.3, 20.4
  • Fictitious-name / DBA registration — 30.6
  • Field business consultant / field support visit — 36.2, 36.8
  • FIFO (first in, first out) — 13.5
  • FIFO and the walk-in reset — 38.3
  • Filling the soft nights — 35.8
  • Final payroll obligations — 39.8
  • Fine dining — 1.6
  • Fire load, lag behind seating — 22.3
  • Fire marshal and solid-fuel cooking requirements — 6.7
  • Fire on call versus fire on send — 22.6
  • Fire operational permits; hood suppression; solid-fuel cooking — 8.2
  • fire slot — 14.3, 14.4
  • Fire suppression over the line — 7.6
  • Fire time, measured — 9.4
  • Fire window, five hours — 22.3
  • Fire-suppression certification (mobile) — 30.2
  • firing (a ticket) — 14.4
  • Firing entrées, the server's judgment — 22.1, 22.6
  • Firing to the driver's ETA — 28.6
  • First ninety days, cost structure of the — 32.6
  • First-party ordering, all-in channel cost — 26.6
  • First-party ordering, definition — 28.4
  • First-three-plates check — 11.6
  • Fit first, balance second, log the skip — 22.2
  • Five C's of credit — 5.3
  • Fixed and variable cost split (preview) — 4.6
  • Fixed and variable split of the technology budget — 26.9, Business Plan checkpoint
  • Fixed block per order — 30.5
  • Fixed cost — 32.1, 32.5, 32.7
  • Fixed labor and the salaried floor — 19.2
  • Fixed labor floor — 1.4, 4.6, 32.1, 32.3, 32.6
  • Fixed labor floor, revenue-side implications — 24.1, 24.3
  • Fixed monthly obligations — 33.1, 33.3
  • Fixed vs. variable channel cost structure — 26.6, 26.9
  • Fixed-cost absorption argument, and where it fails — 28.1, 28.6
  • Fixed-cost multiplier (1 ÷ CM ratio) — 32.5, 32.7
  • Fixed/variable split, handed to Chapter 32 — 31.4
  • Fixing in tiers; what to leave alone — 9.7
  • Flash report as seven DSRs — 34.4
  • Flash report, ramped target — 31.6
  • Flat-demand ceiling, 144 covers — 22.3, 22.5
  • flatbread, as a throughput risk — 14.3, 14.4, 14.6
  • Flavor repetition, cross-utilization limit — 10.3
  • Floor plan in motion, seventeen tables — 22.2
  • Flow and step counting — 7.4
  • FOH/BOH conflict — 21.5
  • FOH/BOH handshake, three scheduled moments — 22.6
  • FOH/BOH square-footage split — 7.1
  • Food and beverage minimum — 29.3
  • Food cost benchmark, full service (28–32%) — 11.1
  • Food cost percentage — 11.1, 11.5, 11.7
  • Food cost percentage, failure modes of — 11.1
  • Food cost percentage, limits of — 12.1, 12.7
  • Food cost, the usage-based formula — 11.1
  • Food donation — 38.4
  • Food per cover — 10.7
  • Food recovery hierarchy (EPA) — 38.4
  • Food safety in transit; delivery radius as a control — 28.7
  • Food service establishment permit — 8.2
  • Food truck annual P&L — 30.2
  • Food truck economics — 30.2, 30.3
  • Food truck project budget — 30.2
  • Food waste — 38.1, 38.2, 38.3
  • Food-handler and manager certification lead times — 9.3, 9.5
  • Food-handler card — 18.5, 25.8, 40.3
  • Food-percentage conditions on a restaurant license — 8.3
  • Food/beverage mix — 2.5
  • Foodborne illness risk factors, the five — 25.1
  • Foodservice Management Professional (FMP) — 40.3
  • Footprint of a restaurant (five categories) — 38.1
  • Foraged and wild mushrooms, approved source — 25.1
  • Forbearance — 39.5
  • Force majeure — 6.5
  • Forecast accuracy, service-level vs. week-level — 19.3
  • Forecast trough — 33.3, 33.7, 33.8
  • Forfeiture waivers, budgeting for — 24.7
  • Form I-9 — 17.7
  • Form I-9 and employment eligibility — 20.9
  • Form I-9 during an opening — 9.3
  • Fortified wine, by the glass — 16.5
  • Forty-top, seats removed from à la carte — 22.4
  • Forward contracting (preview) — 11.8
  • Four jobs of a single-unit owner (set, teach, detect, correct) — 37.1
  • Four-star review as a downgrade — 27.3
  • Four-star reviews as downgrades — 23.6
  • Four-top seated with two guests, cost of — 24.4
  • Four-week period accounting — 37.6
  • Fourteen-day disclosure window — 36.3, 36.4
  • Franchise agreement — 36.5
  • Franchise disclosure document (FDD) — 36.3
  • Franchise, what it gives you — 36.2
  • Franchise-relationship statutes — 36.3, 36.5
  • Franchisee — 36.1, 36.2, 36.6
  • Franchisee associations — 36.3
  • Franchisee P&L, fully costed — 36.6
  • Franchising your own concept — 36.7
  • Franchising, the two businesses — 36.1, 36.7
  • Franchisor — 36.1, 36.8
  • Franchisor obligations — 36.8
  • Franchisor P&L at scale — 36.8
  • Franchisor revenue sources — 36.8
  • Franchisor undercapitalization — 36.8
  • Fraudulent transfer — 39.5
  • Free pour vs. jigger — 15.7
  • Free rent / abatement — 6.3, 6.4, 6.7
  • Free rent, valuing — 5.5
  • Frequency vs. reach — 2.3, 23.2, 27.1, 27.7
  • Friends-and-family round — 5.7
  • Friends-and-family service — 9.5
  • Front of house (FOH) — 7.1, 7.2
  • Front-of-house inspection surfaces — 22.7
  • FTC Franchise Rule (16 C.F.R. Part 436) — 36.3, 36.9
  • FTC Franchise Rule, classification by function — 35.7
  • FTC Green Guides — 38.7
  • FTC rules on consumer reviews — 23.6
  • FTC rules on fake reviews and endorsements — 27.3, 27.6
  • Fuel surcharge and off-invoice charges — 13.1, 13.4
  • Full service — 1.6
  • Fully-allocated daypart profitability — 32.4
  • Funding squeeze, effect on the dining room — 5.7
  • Funding time and weekend batches — 26.7

G

  • garde manger — 14.3, 14.4
  • Garnish, costing and waste — 15.3
  • Gates vs. activities on a timeline — 9.2
  • General and administrative cost — 1.2
  • General liability insurance — 8.5
  • Generator, sizing and noise — 30.2, 30.3
  • Gentrification and the competitive set — 27.8
  • Geography test (delivery addresses) — 28.3
  • Ghost kitchen (dark kitchen) — 30.5
  • Ghost-kitchen fee schedule — 30.5
  • Ghost-kitchen license, assignment and termination — 30.5
  • Ghost-kitchen sector expansion and contraction — 30.5
  • Giblets, and what a silent spec costs — 13.2
  • Gift cards and unclaimed property — 39.8
  • Gift cards, economics — 27.7
  • Gift cards, liability and escheat — 27.7
  • Gift certificates as a liability — 34.4
  • Gift letters — 5.2
  • Gift-card and voucher abuse — 34.6
  • Gift-card liability — 33.2, 33.9
  • Glassware, shapes and cost — 16.6
  • Glasswasher, bar — 38.5
  • Glasswasher, deferral and consequences — 15.5, Business Plan
  • Gloves, limits of — 25.4
  • Good-faith estimate of hours — 20.7
  • Good-guy clause — 6.5, 39.9
  • Good-guy clause, value of — 40.5
  • Google Business Profile — 27.2
  • Google Business Profile, menu and hours accuracy — 26.6
  • Google Business Profile, performance report — 27.2
  • Graduating from a small format — 30.8
  • Graduation decision framework — 30.8
  • Grandfathering and code vintage — 6.2, 6.7
  • Gratuity — 20.4
  • Grease interceptor sizing by local authority — 7.6
  • Grease trap / grease interceptor — 7.6
  • Grease trap and drain service as closure insurance — 25.7
  • Grease-hauler manifests and backflow testing — 8.2
  • Greater-of rule (category thresholds) — 34.5
  • Greenwashing — 38.7, 38.8
  • Greet at the table, two-minute standard — 22.1
  • Greet, the thirty-second standard — 22.1
  • Griddle and the brunch daypart — 7.5, 7.7
  • Grocery prepared foods as a competitor — 2.4
  • Gross and modified gross leases — 6.4
  • Gross profit dollars vs. cost percentage — 16.4, 16.8
  • Gross sales, definition clause in the agreement — 36.5
  • Gross vs. net settlement — 26.7
  • Ground beef vs. whole-muscle obligations — 10.5
  • Group exception dashboard — 37.7
  • Group operating profit versus unit operating profit — 35.3
  • Growth as a dollars strategy, not a margin strategy — 37.4, 37.8
  • Growth capital — 35.6
  • Growth instruments ranked — 36.9
  • Growth ladder, by new personal guaranty — 35.3
  • Growth options, ranked — 35.3
  • Guarantee register — 8.7
  • Guaranteed count — 29.5
  • Guaranty fee and closing costs — 5.3
  • Guaranty stacking — 35.6
  • Guest counts vs. item counts — 12.7
  • Guest data and privacy obligations — 23.5
  • Guest data ownership in a residency — 30.4
  • Guest identity, loss of on marketplace orders — 28.1, 28.4
  • Guest journey — 3.4
  • Guest lifetime value (GLV) — 23.2, 23.3, 23.4, 23.8
  • Guest lifetime value, assumptions and limits of — 23.2
  • Guest lifetime value, spending against — 27.1, 27.7
  • Guest persona — 2.2
  • Guest profile notes — 23.5
  • Guest record and guest notes — 26.5
  • Guest Wi-Fi on a separate network — 26.7, 26.9
  • Guest-loss tolerance on a price increase — 32.7
  • Guest-overlap test — 28.3

H

  • Habit as the structural change (not technology) — 28.1
  • HACCP plan, Hearth Chicken — 25.5
  • HACCP, seven principles — 25.5
  • Hand sink, accessibility and temperature — 25.4, 25.7
  • Hand sinks set by plan review — 7.5
  • Hand-count honest error — 34.5
  • Handing over the decision, not the task — 35.5
  • hands (call for) — 14.4
  • Handwashing as the primary control — 25.1, 25.4
  • Handwashing training — 18.5
  • Happy hour, design and failure modes — 15.8
  • Happy hour, regulation and jurisdictional variation — 15.8
  • Happy hour, regulation of — 24.6
  • Harassment prevention program — 20.8, Business Plan
  • Harassment prevention, practice vs. law — 21.2, 21.5, 21.6
  • Harassment, structural risk factors in restaurants — 20.8
  • Harassment-prevention training and the reporting path — 18.5
  • Hard costs vs. soft costs — 6.6
  • Hardware as capital vs. the replacement reserve — 26.9
  • Hazard Communication Standard and Safety Data Sheets — 25.9
  • Health department pre-opening inspection — 9.2, 9.5
  • Health inspector at the host stand — 22.7
  • Health-department plan review — 6.7
  • Hearth capacity, 28 items an hour — 24.3, 24.5, 24.8
  • Hearth capacity, binding hour — 28.6
  • Hearth ceiling as a staffing constraint — 19.4, 19.6
  • Hearth Chicken (anchor) — 12.1, 12.4, 12.5, 12.7
  • Hearth Chicken cost card — 11.2, 11.5, 11.6, 11.8
  • Hearth Chicken, contribution and mix shift — 18.3
  • Hearth Chicken, labor-loaded plate cost — 14.7
  • Hearth Chicken, named and placed — 10.2, 10.3, 10.5
  • Hearth Chicken, par-roast dependency — 14.7
  • Hearth Chicken, plate cost under an out-of-spec delivery — 13.2, 13.4
  • Hearth Chicken, quarter-portion cost card — 24.5
  • Hearth Chicken, wine pairing contribution — 16.7
  • Hearth rate, 29 covers an hour — 22.3, 22.5, 22.6
  • Hearth throughput from deck area and dwell time — 7.3
  • hearth, capacity ceiling of — 14.3
  • hearth, lighting as an opening duty — 14.1, 14.4
  • held tickets — 14.4
  • Hepatitis A — 25.1
  • Hero premium — 21.4, 21.7
  • Hidden cost of one menu item — 10.4
  • High-low method (splitting a semi-variable cost) — 32.1
  • Highly susceptible populations — 25.2
  • Hired and non-owned auto; cyber; crime coverage — 8.5
  • Hiring sequence and the sequencing rule — 9.3
  • Hold-back rules — 22.4
  • Hold-out test — 27.9
  • Holdover — 6.5
  • Hollandaise and time as a public health control — 25.2
  • Honeymoon period — 9.6
  • Hospitality as a competitive moat — 23.1
  • Hospitality as revenue model — 1.5
  • Hospitality in a forty-second transaction — 30.3
  • Hospitality inward — 23.8
  • Hospitality, limits and failure modes of — 23.1
  • Host covers vs. POS covers — 34.6
  • Host restaurant, what it wants and protects — 30.4
  • Host stand as a revenue position — 40.1
  • Host stand as embedded atmosphere labor — 3.7
  • Host stand as production scheduling — 22.3
  • Host stand placement — 7.2
  • Host stand, annual value — 22.3
  • Host stand, seating decisions under time pressure — 24.4
  • Host-stand question — 27.9
  • Hot holding — 25.2
  • Hours, special and holiday — 27.2
  • Hours-to-date report — 19.7

I

  • Ice bin, broken glass protocol — 25.9
  • Ice, cost per drink — 15.3
  • ID checking, threshold and technique — 18.5
  • ID checks and responsible service, wine — 16.7
  • Ideal (theoretical) food cost — 11.7
  • Ideal vs. actual usage report — 34.5
  • Ideal vs. actual variance — 11.7
  • Ideal vs. actual variance, decomposing — 38.2
  • Ideal vs. actual, applied to beverage — 15.2, 15.6
  • Identification checking procedure — 8.4
  • Illustrative wage rates and jurisdictional variation — 19.4
  • Immediate-termination conduct list — 21.6
  • Imminent health hazard — 25.7
  • Imputed general-manager compensation — 36.6
  • Incident log — 8.4
  • Incident logging — 18.5
  • Inclusion criteria as the disclosure — 36.4
  • Incremental contribution margin, limits of — 35.4
  • Incremental vs. cannibalized sales — 28.3
  • Incremental vs. cannibalized visits — 23.2
  • Incrementality identity (r ≥ D/C) — 27.7, 27.9
  • Indemnity and additional-insured requirements — 8.7
  • Independent broker vs. captive agent — 8.5
  • Independent vs. chain — 1.6
  • Independent-contractor misclassification — 20.9
  • Individualized and algorithmic pricing — 24.6
  • Inducement rules — 16.3
  • Information supply from staff — 34.6
  • Inheritance inventory — 6.2
  • Inside-the-walls growth program — 35.8
  • Inspection report, reading one — 25.7
  • Inspection, the walk — 25.7
  • Inspection-day protocol — 25.7
  • Insurance application as a signed document — 8.5
  • Insurance as risk transfer — 8.5
  • Insurance for a guest operator — 30.4
  • Insurance premium, first instalment before opening — 9.1
  • Insurance premiums, timing of — 33.5, 33.6
  • Integration and API — 26.8
  • Interchange — 26.7
  • Interchange category detail — 26.7
  • Interchange, variation by card type — 26.7
  • Interest vs. principal, and the P&L — 5.4
  • Interest-only period — 39.5
  • Internal control, definition of — 34.1
  • Internet, fiber and LTE failover — 26.2, 26.9
  • Interview scorecard — 17.4
  • Inventory adjustment — 31.3
  • Inventory as cash — 13.7
  • Inventory build as a cash use — 32.8
  • Inventory build, as a use of cash — 33.1, 33.2
  • Inventory change, effect on reported food cost — 11.1
  • Inventory count, hours saved and the payback — 26.4
  • Inventory management software — 26.4
  • Inventory turnover — 13.7
  • Inventory turns, by price band — 16.6
  • Inventory variance — 34.5
  • Investigation ladder, the seven rungs — 34.6
  • Investigation, the first ten minutes — 20.8
  • Investor comping policy — 5.7
  • Investor control and consent rights — 5.7
  • Invoice price drift from the quote sheet — 34.7
  • Invoice reconciliation (three-way match) — 13.4
  • Invoice shortcut (invoices ÷ sales), error in — 11.1
  • Involving counsel before the first interview — 34.9
  • Irreversible commitment, size of — 30.1, 30.4
  • Item 19 as optional; what silence means — 36.4
  • Item count — 10.4
  • Item list, building by subtraction — 10.2
  • Items rejected and why (oysters, fried, risotto, duck) — 10.2

J

  • Jack in the Box 1993 outbreak — 25.5, case study 1
  • Jigger policy and its limits — 15.7
  • Job boards — 17.3
  • Job description — 17.2
  • Job posting, wage disclosure in — 17.2
  • Joint and several liability — 6.4, 40.4, 40.5
  • Joint employment — 36.5
  • Judgment between the steps — 18.1, 18.4
  • Jurisdictional variation in food-safety requirements — 18.5
  • Jurisdictional variation, multi-state operation — 37.2

K

  • Kasavana and Smith framework — 12.2
  • KDS fallback printer and manual procedure — 26.3
  • KDS, all-day count — 26.3
  • KDS, allergen flag routing — 26.3
  • KDS, queue against station rate — 26.3
  • KDS, ticket time and the timestamp record — 26.3
  • Keeping the circle small — 34.9
  • Keg math and keg sizes — 15.4
  • Key-item count (twelve lines) — 13.6
  • Kill questions — 2.7
  • kitchen day, structure of — 14.1
  • Kitchen display system (KDS) — 26.3, Business Plan checkpoint
  • kitchen display system, measurement traps — 14.5
  • Kitchen workflow — 7.3

L

  • Labor as a percentage of sales, the revenue-side critique — 24.3
  • Labor as a step function (the staircase) — 19.4
  • Labor cost — 1.2, 1.4
  • Labor cost percentage — 19.1, 19.8
  • Labor cost, components of (wages, taxes, comp, benefits) — 19.1
  • Labor forecasting — 19.3
  • Labor percentage improving while quality degrades — 19.8
  • Labor percentage vs. check average — 32.4
  • Labor ramp, quarter by quarter — 40.9
  • Labor sensitivity at 35.3% — 40.8
  • Ladder of break-evens — 32.8
  • Ladles and portion tools — 11.6
  • Landlord as lender — 5.1, 5.5
  • Landlord collateral-access agreement — 40.8
  • Landlord notice provision — 39.8
  • Landlord's replacement cost — 39.5
  • Large party, pacing inventory consumed — 22.4, 22.6
  • Large-party pacing rule — Business Plan
  • Last week as a service — 39.8
  • Law enforcement, deciding about — 34.9
  • Layout change payback period — 7.4
  • Leadership seats, N+1 rule — 35.5
  • Leak exposure, collecting — 39.3
  • Leak ladder, annualized — 15.7
  • Learned professional exemption (chefs) — 20.5
  • Lease abstract — 6.4
  • Lease assignment — 39.5
  • Lease assumption and rejection — 39.6
  • Lease deferral — 39.5
  • Lease escalation, unmodeled — 4.5
  • Lease rate factor — 5.6
  • Lease renegotiation instruments — 39.5
  • Lease termination (buyout) — 39.5
  • LED retrofit — 38.5
  • Legibility of a wine list — 16.1, 16.2, 16.7
  • Letter grades and public posting — 25.7
  • Letter of intent (LOI) — 6.3
  • Lever break-even formula — 21.7
  • License suspension and revocation — 8.4
  • License types: on-premise, beer and wine, restaurant classification — 8.3
  • Licensed address, why it is required — 30.7
  • Licensed premises boundary and the patio — 8.2, 8.3
  • Licensing and compliance section of the business plan — 8.1, 8.2, 8.3, 8.5
  • Licensing as an alternative — 36.9
  • Licensing versus franchising — 35.7
  • Lien waivers and mechanic's liens — 6.6
  • Liens and prior conditions travelling with a license — 8.3
  • Light level and color temperature — 3.3
  • Lighting scene schedule — 3.3
  • Limited liability company (LLC) — 8.1
  • Line cleaning, economics of — 15.4
  • Line errors and refires — 38.2, 38.3
  • Line extension — 35.7
  • Line of credit — 33.7, 33.8
  • line, the (four-person peak) — 14.3
  • Line-of-credit discipline — 33.8
  • Line-up break-even test — 18.8
  • Linear flow: receiving → storage → prep → line → pass — 7.3
  • Linen vs. tablecloth cost — 3.7
  • Liquidated damages — 20.6
  • Liquor and wine variance thresholds — 34.5
  • Liquor cost (spirits only) — 15.2
  • Liquor liability exclusion — 8.5
  • Liquor liability insurance — 8.5
  • Liquor license application file — 8.3
  • Liquor license as a binary, uncontrolled item — 9.2, 9.5
  • Liquor license bond — 8.5
  • Liquor license in insolvency — 39.6, 39.8
  • Liquor license, cannot be borrowed — 30.4
  • Liquor license, definition and character — 8.3
  • Liquor licensing in a franchised unit — 36.5
  • List building at the table — 27.5
  • Listeria monocytogenes — 25.1
  • Listing without consent — 28.9
  • Load balancing a menu across stations — 10.4
  • Load-out list — 29.8
  • Loan conditions — 40.8
  • Local marketing minimum — 36.3, 36.5
  • Local option and dry jurisdictions — 8.3
  • Local search: relevance, distance, prominence — 27.2
  • Local SEO — 27.2
  • Local, as a claim — 38.7
  • Location selection — 6.1, 6.2
  • Log discipline and pencil-whipping — 25.8
  • Logs, the ten Bellwether keeps — 25.8
  • Long-lead equipment — 6.7
  • Long-lead equipment and schedule risk — 7.7
  • Long-lead equipment and the countdown — 9.2
  • Loss allowance, wine — 16.6
  • Loyalty mechanics: discount, access, occasion, recognition — 27.7
  • Loyalty program — 27.7

M

  • Maintenance and mechanical failure, cost of downtime — 30.2
  • Make-up air — 7.6
  • Make-up air, conditioning load — 38.5
  • Managed growth — 36.9
  • Management bench — 35.5, 37.8
  • Management by exception — 37.7
  • Manager who won't decide, four forms — 21.5
  • Managers and supervisors barred from tip pools — 20.3, 20.5
  • Mandated promotions and the incentive misalignment — 36.5
  • Mandatory absence as a control — 34.1
  • Mandoline — 25.9
  • Manual maintenance, review dates and owners — 37.2
  • Manual, fifteen-section structure — 37.2
  • Margin of safety — 32.6
  • Margin of safety in weeks of trading — 32.6
  • Margin-headroom test — 36.7
  • Marginal contribution per cover — 39.1, 39.4
  • Marginal cover, value by night — 24.1, 24.3
  • Marginal labor hours per cover — 19.4
  • Market price, unquoted — 13.1
  • Market-rate management, pricing — 35.2, 35.5
  • Marketing as a budgeted fixed cost — 32.1, 32.5
  • Marketing budget as a percentage of sales — 27.1
  • Marketing budget, allocation by purpose — 27.1, 27.9
  • Marketing labor, replacement cost of — 27.9
  • Marketplace bookings, incrementality — 26.5
  • Marketplace facilitator tax rules — 28.9
  • Marketplace vs. first-party comparison — 28.4
  • Markup multiples and their reciprocals — 16.4
  • Master franchise / subfranchising — 36.9
  • Materials and maintenance burden — 3.3
  • Measurement cadence: daily, weekly, four-weekly — 9.7
  • Median vs. weighted average entrée price — 10.7
  • Mentorship — 40.2
  • Menu as a document — 10.1
  • Menu as a labor model — 10.1, 10.4
  • Menu as a production plan — 2.1, 2.6
  • Menu as a purchasing document — 10.1, 10.3
  • Menu as brand artifact — 3.5
  • Menu categories — 10.1
  • Menu change, retraining on — 18.3, 18.8
  • Menu claims and price accuracy — 12.6
  • Menu contraction, 2020 — case study 1
  • Menu control in a franchised unit — 36.2, 36.5
  • Menu creep — case study 2
  • Menu design for waste — 38.3
  • Menu engineering — 12.1, 12.3, 12.4, 12.7, 12.8
  • Menu freeze date — 9.3, 9.4
  • Menu knowledge — 18.3
  • Menu legibility and type size — 10.6
  • Menu length, effect on ordering time — 24.5
  • Menu mix percentage — 12.2, 12.3, 12.6
  • menu mix, effect on capacity — 14.3
  • Menu panel — 10.6
  • Menu price ladder (preview) — 11.5
  • Menu psychology — 10.6
  • Menu rehearsal — 9.4
  • Menu reprint cost and repricing delay — 3.5
  • Menu routing constraint (≤50% through the hearth) — 7.3, 7.7
  • Menu strategy for delivery — 28.5
  • Menu typography and stock — 3.5
  • Menu voice and description writing — 3.5
  • Menu-engineering meeting — 12.8
  • Menu-knowledge testing — 18.3
  • Merchant account and card settlement — 9.5
  • Merchant cash advance — 33.8, 33.9
  • Merchant statement, reading one — 26.7
  • Metered pour spouts — 15.6
  • Metric gaming — 37.7
  • Micromanagement, the audit line — 37.3
  • Midweek vs. weekend covers as an indicator — 9.6
  • Miller cost-based analysis — 12.2
  • Minimum as a floor, not a target — 29.3, 29.7
  • Minimum drop — 13.1, 13.3
  • Minimum royalty — 36.5
  • Minimum wage, federal vs. state vs. local — 20.1, 20.2
  • Misdiagnosis, cost of — 39.1
  • mise audit — 14.2
  • mise en place — 14.2
  • Mitigation of damages — 39.9
  • Mix dependence of break-even — 32.3, 32.8
  • Mobile food facility plan review — 30.2
  • Mobile unit commissary requirement — 37.5
  • Mobile vending permit — 30.2
  • Mobility cost (commissary, fuel, maintenance, event fees, reserve) — 30.2
  • Monday cash meeting — 33.5
  • Monday reconciliation check — 26.4
  • Money flow, franchisee to franchisor — 36.1
  • Month-over-month comparison, why it fails — 31.7
  • Monthly all-staff meeting — 21.3
  • Monthly all-staff session — 18.8
  • Multi-unit flash report — 37.6
  • Multi-unit leadership — 37.1, 37.4, 37.8
  • Multi-unit management as a career — 40.6
  • Multi-unit readiness (Business Plan checkpoint) — Business Plan
  • Multi-unit reporting package and cadence — 37.6
  • Multi-unit valley (overhead ladder) — 37.4
  • Municipal business license, multiple jurisdictions — 30.2
  • Music licensing and performing rights organizations — 3.6, 8.2, 8.7

N

  • Name change, cost of — 3.2
  • Name scorecard — 3.2
  • Naming — 3.2
  • Naming funnel — 3.2
  • Naming the week — 40.9
  • NAP consistency — 27.2
  • Natural, as a labeling term — 38.7
  • Negative variance — 34.5
  • Negotiating leverage on a platform — 28.9
  • Neighborhood presence — 27.8
  • Neighbors as traffic generators — 6.1
  • Net sales vs. gross sales, as a labor denominator — 19.1
  • New construction, alterations, and path of travel — 8.6
  • New vs. used equipment — 7.5
  • Ninety-day turnaround — 39.3
  • NNN reconciliation — 33.5, 33.6
  • No-poach agreements — 17.3
  • No-sale drawer open — 34.3
  • No-show rate, refill rate by night — 24.7
  • No-show, cost of — 19.6
  • No-shows, cost arithmetic — 24.7
  • Non-alcoholic beverage, in the denominator — 15.2
  • Non-compete agreements — 17.3
  • Non-continuous cooking of raw animal foods — 25.5
  • Non-refundable event fees — 30.2, 30.3
  • Norovirus — 25.1
  • Novelty traffic — 9.6

O

  • Occasion (as the unit of demand) — 2.2, 2.4
  • Occasion mix and the check average — 2.2, 2.5
  • Occasion segments — 2.2
  • Occasion types: celebration, transaction, date, refuge, audition — 23.3
  • Occupancy cost — 1.2
  • Occupancy cost as a percentage of sales — 6.4
  • Occupancy percentage as an output of revenue — 4.3, 4.5, 4.6
  • Occupancy, renamed in a mobile format — 30.2
  • Occupant load — 7.2, 8.2
  • Occupational noise exposure — 3.3
  • Occurrence and aggregate limits; defense costs inside vs. outside — 8.5
  • Off-premise menu matrix — 28.5
  • Off-premise window (schedule by night) — 28.6
  • Off-premise, definition and scope — 28.1
  • Off-site catering — 29.8
  • Off-the-clock work — 20.6
  • Offer letter — 17.7
  • Offer vs. sale as a standard — 18.1
  • on the fly — 14.4
  • On the fly, as a transfer — 22.6
  • Onboarding — 17.8
  • One change a week — 9.7
  • One-guest assignment — 21.3
  • One-question test — 37.7
  • Ongoing training — 18.8
  • Online ordering, first-party vs. marketplace — 26.6
  • Open flame and candle regulation — 3.6
  • Open-book numbers with staff — 21.3
  • Open-bottle log — 16.5
  • Open-food button — 12.2
  • Open-issuance vs. quota jurisdictions — 8.3
  • Open-item button, corruption of theoretical usage — 26.1
  • Open/close hourly floor — 32.1
  • Opening date as a revenue decision — 9.2
  • Opening day, capping covers — 9.6
  • Opening dry vs. delaying — 9.2
  • Opening inventory — 9.1
  • Opening inventory, food vs. beverage depth — 9.1
  • Opening inventory, wine — 16.6
  • Opening ramp — 4.5
  • Opening-readiness punch list (GO / FIX / STOP) — 9.5
  • Operating agreement — 8.1
  • Operating ceiling, 132 covers — 22.5
  • Operating ceiling, break-even against the — 32.8
  • Operating company vs. property company — 8.1
  • Operating leverage — 32.5
  • Operating leverage (preview) — 4.5, 4.6
  • Operating leverage in a cash forecast — 40.9
  • Operating leverage in a small format — 30.2
  • Operating leverage, in the downside direction — 39.1
  • Operating profit — 1.2
  • Operating weeks, the 52-week assumption — 4.4
  • Operations manual — 37.2, 37.8
  • Operations manual, as a franchise asset — 36.2, 36.7
  • Operator to operator-of-operators, transition — 37.1
  • Opportunity cost of education — 40.3
  • Opt-in accessories — 38.6
  • Options as a function of time and cash — 39.2
  • Oral earnings claims — 36.4
  • Order accuracy, the five common failures — 28.8
  • Order guide — 13.3
  • Order of operations, menu changes — 12.8
  • Orderly closure — 39.8
  • Organic (USDA National Organic Program) — 38.7
  • Organic vs. paid — 27.2
  • Organics mandate — 38.4
  • Organization chart — 17.8
  • OSHA basics — 25.9
  • Other operating cost — 1.2
  • Other operating line, opened up — 26.9
  • Outside equity, the true cost of — 35.6
  • Outside reconciler (the bookkeeper as a control) — 34.1, 34.2, 34.4
  • Over-comping as an error — 23.4
  • Over-hiring the floor against opening attrition — 9.3
  • Over-ordering — 34.6
  • Over-ordering, quantified — 13.3
  • Over-portioning, cost of — 34.5
  • Over-pour, cost of — 15.7
  • Over-production — 13.8, 38.2, 38.3
  • Over-ringing — 34.6
  • Over-service, and wine — 16.7
  • Over-service, recognizing — 18.5
  • Over-the-shoulder test for guest notes — 26.5
  • Over-weight birds and the cost card — 34.5
  • Over/short — 34.2, 34.4
  • Over/short tolerance, setting a — 34.2, 34.5
  • Overhead per unit, by unit count — 35.3
  • Overtime — 19.7
  • Overtime during pre-opening — 9.3
  • Overtime paid to avoid hiring — 19.7
  • Overtime, all-in cost of an hour — 19.7
  • Overtime, calculation of — 20.1, 20.4, 20.5
  • Overtime, daily (state rules) — 20.1, 20.5
  • Overtime, the four causes — 19.7
  • Owner compensation and forgone income during pre-opening — 9.1
  • Owner compensation as a labor lever — 19.8
  • Owner compensation by scenario — 40.5
  • Owner compensation inside the labor line — 4.5, 4.7
  • Owner dependence — 21.8, 30.8, 35.1
  • Owner does not scale, the — 35.1
  • Owner draws — 33.1, 33.9
  • Owner injection — 5.2
  • Owner injection as share of project cost — 40.5, 40.8
  • Owner injection, sourcing from cash flow — 35.6
  • Owner injection, verification and seasoning — 5.2
  • Owner presence, time budget for — 37.1
  • Owner review of exception reports — 34.1, 34.3
  • Owner's salary, inclusion in labor — 19.1, 19.2, 19.8
  • Owner-adjusted unit profit — 35.2
  • Oxidation and open-bottle windows — 16.5

P

  • P&L, restaurant vs. generic — 31.1
  • Pace as the master variable — 23.3
  • Pace decisions made in the reservation book — 23.3
  • Pacing caps, enforcement by platform — 26.5
  • Pack-station verification step — 28.8
  • Package tiers — 29.3
  • Packaging cost card — 28.2, 28.7
  • Packaging, cost and false economy — 28.7
  • Packing labor, per-order cost — 28.2, 28.6
  • Paid sick leave ordinances — 20.7
  • Paper ticket, why it produces no record — 26.3
  • par cooking — 14.3, 14.7
  • Par level, formula and derivation — 13.3
  • par levels, shape of the week and — 14.2, 14.7
  • Par levels, wine — 16.6
  • Par-cooking and two-stage cooling — 10.5
  • Par-roast, chill, and finish process — 25.2, 25.5
  • Parking minimums — 2.3
  • Parking, zoning requirements and shared parking — 6.1
  • Partial surrender — 39.5
  • Participating lender — 5.3
  • Partner-operated units — 36.9
  • Partnership agreement, the six questions — 40.4
  • Partnerships, reciprocal — 27.8
  • Party departure time, value of — 22.4
  • Party size — 2.2
  • Party-size distribution — 24.4
  • Party-to-table fit, 84% — 22.5
  • pass, the — 14.3, 14.4
  • Patio economics — 3.7
  • Patio revenue, weather-availability factor — Business Plan checkpoint
  • Patio seating as a revenue assumption — 7.1, 7.7
  • Pattern vs. data point vs. volatility — 34.5
  • Pay steps for certifications — 18.7
  • Payables, stretching — 33.4, 33.9
  • Payback ladder — 38.5
  • Payment at the table, handheld — 22.7
  • Payment processing — 26.7, 26.9, Business Plan checkpoint
  • Payment processing, dine-in vs. first-party — 28.2
  • Payout statement, reading one — 28.2
  • Payroll before revenue — 9.3
  • Payroll burden rate — 32.1
  • Payroll burden, in training cost — 18.2
  • Payroll rating, class codes, experience modifier, premium audit — 8.5
  • Payroll, biweekly disbursement — 33.5, 33.7
  • Payroll, three-payroll month — 33.5
  • PCI DSS and the non-compliance fee — 26.7
  • Peak fire utilization — 10.4
  • peak fire utilization — 14.3, 14.4
  • Peak surcharge vs. off-peak discount, the asymmetry — 24.6
  • Peak-end effect on guest memory — 22.1, 22.7
  • Peak-hour cover cap as operating target — 22.5, Business Plan
  • Peak-hour entrée load (37% planning rule) — 7.3, 7.7
  • Peak-hour plate load — 9.4
  • Peak-to-average ratio — 22.3, 22.5
  • Peer audit — 37.3
  • Pending fires, as an indicator — 22.6, 22.8
  • Per-person pricing — 29.3
  • Percentage rent and the natural breakpoint — 6.4
  • Percentage-rent conversion — 39.5
  • Perishable capacity, three defining properties — 24.1
  • Permit lotteries for public space — 30.2
  • Permit path and plan review — 6.7
  • Permit stack, the three gates — 8.2
  • Permit-and-license contingency — 6.3, 6.7
  • Permit-and-license contingency, limits of — 8.3
  • Permitted use clause — 6.5
  • Person in charge (PIC) — 18.5, 25.1, 25.7, 25.8
  • Person-to-person and premises-to-premises transfers — 8.3
  • Personal exposure, decomposed — 35.6
  • Personal exposure, itemized — 40.5
  • Personal guarantee — 5.4
  • Personal guarantee (lease) — 6.4
  • Personal guarantee (preview) — 4.1
  • Personal guarantee in a vendor credit application — 8.7
  • Personal guarantee, spousal and joint-and-several — 5.4
  • Personal guaranty, face vs. realized — 39.9
  • Personal guaranty, unreached by a business filing — 39.6, 39.9
  • Personal safety and the nightly deposit — 34.2
  • Pest harborage and firewood storage — 25.7
  • Petty-cash paid-outs — 34.2, 34.4
  • PFAS in food packaging — 38.6
  • Phantom average check — 31.1, 32.3
  • Phantom equity — 40.4
  • Photography and usage rights — 27.4
  • Physical barriers (river, rail, arterial, one-way pairs) — 2.3
  • Physical capacity vs. break-even covers — 39.1
  • Physical inventory — 13.6
  • Pick-up window vs. servers entering the kitchen — 7.3
  • Piercing the veil / commingling — 8.1
  • Pitching local press, lead times — 27.6
  • Pivot axes, cheapest first — 39.4
  • Pivot, compliance surface of — 39.4
  • Places of public accommodation; Title III — 8.6
  • Plan as argument, not prediction — 40.10
  • Plan review, pre-construction — 25.5, Business Plan
  • plancha — 14.3
  • Plate cost — 11.2, 11.5, 11.8
  • Plate return / scrape rate — 23.7
  • Plate waste as a portioning signal — 38.3
  • Plate-up — 9.4
  • Plateware par, breakage, and discontinuation — 3.6
  • Platform contract terms to read — 28.9
  • Platform ratings vs. public reviews — 28.8
  • Plating photograph as a consistency control — 9.4
  • Plowhorse (quadrant) — 12.4, 12.5
  • Poaching and direct approach — 17.3
  • Point of sale (POS) — 26.1, 26.2, 26.8, Business Plan checkpoint
  • Point-of-sale cross-check on inventory — 15.6
  • Points model, tip distribution — 20.3, Business Plan
  • Policies that encode values in numbers — 37.8
  • Pop-up — 30.4
  • Popularity index — 12.2
  • Popularity threshold (70% rule) — 12.2, 12.3, 12.7
  • Portion control — 11.6
  • Portion drift — 10.5, 11.6
  • Portion scale — 11.6
  • Portion scale on the pass — 34.5
  • Portion test — 38.3
  • Portion-cut proteins, yield of — 11.3
  • Portioning tools and the weekly spot check — 10.5
  • Portions in weights vs. adjectives — 10.5
  • POS as a legal record (sales tax, tip records) — 26.1
  • POS as the system of record — 26.1, 26.9
  • POS audit trail — 34.3
  • POS data hygiene — 12.2, 12.3
  • POS, cloud vs. legacy architecture — 26.2
  • POS, contract term and auto-renewal — 26.2
  • POS, early termination fee — 26.2
  • POS, hardware ownership vs. financing — 26.2
  • POS, offline mode and store-and-forward — 26.2
  • POS, what it must capture — 26.1
  • Positioning — 2.4
  • Positioning map — 2.4
  • Post-2017 accountability wave in restaurants — 21.2
  • Post-consumer waste — 38.2, 38.3
  • Post-service note — 21.3
  • Post-term non-compete — 36.5
  • Post-termination obligations and de-identification — 36.5
  • Post-visit surveys and response bias — 23.7
  • Posting, publication, and protest periods — 8.3
  • Poultry cooking temperature (165°F) — 10.5
  • Pour cost, by category — 15.2, Business Plan
  • Pour cost, computing — 15.2
  • Pour cost, ways it lies — 15.2
  • Pour size, choosing one that divides the bottle — 16.5
  • Pre-consumer waste — 38.2
  • Pre-fee margin as the selection mechanism — 36.6, 36.7
  • Pre-mortem — 2.7
  • Pre-opening budget — 9.1
  • Pre-opening budget, bottom-up build — 9.1
  • Pre-opening budget, why it is underestimated — 9.1
  • Pre-opening health inspection — 8.2
  • Pre-opening inspection — Business Plan
  • Pre-opening overrun — 33.1, 33.3
  • Pre-opening payroll as weeks of steady-state labor — 9.3
  • Pre-opening shortfall (\$36,300) — 40.8, 40.9
  • Pre-opening timeline — 9.2
  • Pre-opening training budget gap — Business Plan
  • Pre-rinse spray valve — 38.5
  • Pre-service overlap — 19.5, 19.6
  • pre-shift / stretch — 14.1
  • Pre-shift and post-close unrecorded work — 20.6
  • Pre-shift book read — 23.5
  • Pre-shift line-up, agenda and cost — 18.8
  • Pre-shift meeting, compensable time — 21.3
  • Pre-shift meeting, cost per cover — 21.3
  • Pre-shift meeting, structure and agenda — 21.3
  • Pre-shift, front-of-house checklist — 22.8
  • Predictability pay — 20.7
  • Predictive scheduling (preview) — 19.5, 19.6
  • Predictive scheduling laws — 20.7, Business Plan
  • Preference and insider payments — 39.5
  • Preferred return and revenue share — 5.7
  • Premises control as a filing prerequisite — 8.3
  • Premium spirits, cost percentage vs. contribution — 15.1, 15.5
  • Premium well decision — 15.5
  • prep block — 14.1
  • Prep labor per item — 10.4
  • prep list — 14.2
  • Prep space and production capacity — 7.3
  • Prep trim and unavoidable loss — 38.2, 38.3
  • Prep-commitment problem — 30.2
  • Prepped inventory, valuing and counting — 13.6, 13.8
  • Preservation systems, payback arithmetic — 16.5
  • Press as a demand-side event — 27.6
  • Press in opening week — 9.6
  • Press spike, operational cost of — 27.6
  • Previous tenant's listing (second-generation space) — 27.2
  • Price anchoring — 10.6, 10.7
  • Price change, break-even effect of a — 32.7
  • Price escalation and surcharges — 8.7
  • Price increase, break-even volume — 12.4, 12.5
  • Price ladder — 2.4, 10.7
  • Price pivot and elasticity — 39.4
  • Price posting, wholesale — 16.3
  • Price tolerance, value of — 3.1
  • Price-setting by a franchisor — 36.5
  • Price-to-hold-contribution formula — 28.5
  • Pricing models: flat rate, interchange-plus, tiered — 26.7
  • Pricing, when to override the target — 11.5
  • Primacy and recency effects — 10.6
  • Prime cost — 1.2, 1.3, 1.4, 1.6
  • Prime cost as a subtotal — 31.1, 31.5
  • Prime cost benchmarks by service style — 31.5
  • Prime cost with franchise fees layered on — 36.6
  • Prime cost, allocation across a year — 19.8
  • Prime cost, benchmarks by service style — 1.3, 1.6
  • Prime cost, one point expressed in covers — 39.1
  • Prime cost, Q1 vs. rest of year — 33.1, 33.6
  • Prime cost, weekly calculation — 31.5
  • Prime cost, weekly computation of — 1.3
  • Prime-cost bonus — 40.4
  • Prime-vendor agreement — 13.1
  • Priority (P) items — 25.7
  • Priority foundation (Pf) items — 25.7
  • Private dining room, absence of — 29.2
  • Private event buyout, pricing floor — 24.8
  • Private events, wage consequences of — 20.4
  • Private gigs (truck catering) — 30.3
  • private party, capacity impact of — 14.4
  • Prix fixe economics — 24.5, 24.8
  • Pro forma — 4.2, 4.5
  • Pro forma, monthly year one — 4.5
  • Pro forma, three-year — 4.5
  • Process approach, Processes 1, 2, and 3 — 25.5
  • Process authority and acidified foods — 35.7
  • Processing charged on sales tax and tips — 26.7
  • Processor markup — 26.7
  • Product leaving the building — 34.6
  • Product-mix report — 12.2, 12.3
  • production sheet — 14.2, 14.7
  • Profit and loss (P&L) statement — 31.1
  • Profit margin, restaurant — 1.2
  • Profit-to-cash bridge — 33.1, 33.6
  • Progressive discipline, the five steps — 21.6
  • Project cost, Bellwether — 4.2
  • Projected menu mix, fragility of — 12.2, 12.8
  • Promotion and happy-hour restrictions — 8.4
  • Promotion path, written ladder — 21.8
  • Promotional discount — 34.3
  • Promotional funding and sponsored placement — 28.2, 28.8, 28.9
  • Pronunciation policy, service — 16.7
  • Propane inspection — 30.2
  • Property insurance; tenant improvements and betterments — 8.5
  • Proprietary hardware — 26.2, 26.8
  • Protected characteristics — 17.6
  • Protected territory — 36.5
  • Proximity rules and no-vend zones — 30.2
  • Pruning a list — 16.8
  • Psychological safety — 21.6
  • Psychological safety as a food-cost control — 21.6
  • Punch list — 6.6
  • Punch report, reading a — 20.1
  • Punch-edit log — 20.6, Business Plan
  • Punch-edit permission — 34.1
  • Purchases-over-sales shortcut, why it misleads — 31.3
  • Purveyor / vendor — 13.1
  • Puzzle (quadrant) — 12.4, 12.5

Q

  • Q factor — 11.2
  • Q1 ramp and the 58% requirement — 31.6
  • Quantity discounts and the case-stack trap — 16.3, 16.6
  • Quarterly menu-change training — 18.8
  • Quarterly wage self-audit — 20.6, Business Plan
  • Quaternary ammonium (quat) sanitizer — 25.4
  • Questions not to ask a guest — 23.3
  • Queue does not clear during a rush — 22.3, 22.6
  • Quick service — 1.6
  • Quota markets, license brokers, and escrow — 8.3
  • Quote drift — 22.3
  • Quote long, seat early — 22.3
  • Quoted-versus-actual standard, 85% — 22.3
  • quoting a wait — 14.4
  • Quoting, the method — 22.3

R

  • Ramp projection and excess prime cost — 9.7
  • Ramp quarter and run-rate labor requirement — 19.8
  • Ramp, break-even during the — 32.6
  • Rate, fixed vs. variable — 5.4
  • Raw shell, warm shell, vanilla box, turnkey — 6.2
  • Re-costing — 11.8
  • Re-costing cadence and triggers — 11.8
  • Re-cut construction budget — 7.6
  • Re-engineering actions — 12.5, 12.8
  • Re-engineering cadence — 12.8
  • Re-fire, cost of — 23.4
  • Re-inspection, the ten days — 25.7
  • Re-speccing, legal exposure of — 11.8
  • Readily achievable barrier removal — 8.6
  • Reading a table — 23.3
  • Reading the occasion at the table — 2.2
  • Real estate, SBA 504, and owning the building — 35.6
  • Real-time labor management — 19.6
  • Reason with a date on it — 39.7
  • Rebates and manufacturer allowances — 13.1
  • Recapture and profit-sharing on transfer — 6.5
  • Receiving — 7.3
  • Receiving control — 34.7
  • Receiving wine — 16.6
  • Receiving, return on the twenty minutes — 13.4
  • Receiving, the seven checks — 13.4
  • Recipe card format — 10.5
  • Recipe cost card — 11.2
  • Recognition and regulars — 23.5
  • Recognition and visible hierarchy — 23.5
  • Recording a boring count — 34.8
  • Recording overs — 34.2
  • Recordkeeping obligations, FLSA — 20.1, 20.6
  • Records retention after closure — 39.9
  • Records, burden-shifting where inadequate — 20.1, 20.6
  • Recount, when to — 34.5
  • Recovery authority ladder — 23.4, Business Plan
  • Recovery log, weekly (Figure 23.4) — 23.4
  • Recovery training, four moves — 18.4
  • Reference check — 17.6
  • Referral programs — 17.3, 17.8
  • Refire tally at the pass — 38.3
  • Refrigeration and condensing-unit replacement — 7.6
  • Refusal of service and the override rule — 8.4
  • Refusal of service, script and backup — 18.5
  • Refusal procedure — 16.7
  • Refusal protocol — 15.7
  • Registered agent — 8.1
  • Registration states — 36.3, 36.7
  • Regular rate of pay — 20.1, 20.4
  • Rehearsal artifacts (cost cards, photographs, portion standards, station map, fire times, 86 plan) — 9.4
  • Rehearsal budget as a false economy — 9.4
  • Reheating for hot holding — 25.2
  • Rejecting a delivery — 13.4
  • Rejecting a sixth service (concept discipline) — 2.5
  • Rejection-damage claim, statutory cap — 39.6
  • Relative axes problem — 12.7
  • Relevant range and step costs — 32.8
  • Relocation clause — 6.5
  • Renewal options and notice deadlines — 6.4, 6.5
  • Rent abatement, three ways to spend it — 9.2, 9.6
  • Rent commencement and the thirty-day rule — 9.2
  • Rent commencement date — 6.3, 6.7
  • Rent commencement tied to the C of O — 8.2, 8.3
  • Rent per cover — 6.1, 6.4
  • Rentable vs. usable square feet; load factor — 6.4
  • Rentals, linen, and AV — 29.7
  • Rented hourly commissary — 37.5
  • Reopened check — 26.1, 34.3
  • Repair and replacement allocation — 6.5
  • Repairs and maintenance, fixed vs. break-fix — 32.1
  • Repeat-visit rate — 23.2, 23.7, Business Plan
  • Repeat-visit rate as a forecast assumption — 4.7
  • Repeatability of a model — 35.2
  • Repeating corporate accounts — 29.9
  • Reporting channels, multiple — 20.8
  • Reporting-time pay (preview) — 19.5
  • Required remodel — 36.5, 36.7
  • Required workplace posters — 20.1, Business Plan
  • Required-revenue inversion — 6.4
  • Resale market for a franchised unit — 36.2, 36.6
  • Reservation book as production schedule — 22.3, 22.4
  • Reservation mix by night, 65/35 and 45/55 — 22.4
  • Reservation platform — 26.5, Business Plan checkpoint
  • Reservation platform data ownership — 23.5
  • Reservation platforms, revenue-management use of — 24.7
  • Reservation postal-code report — 35.4
  • Reservation-book conversion rate — 19.3
  • Reservations, walk-ins, and the mix — 22.4
  • Reserve, working-capital — 33.1, 33.3
  • Reset, ownership and clock — 22.5, 22.7
  • Residency — 30.4
  • Residency test (ten Monday nights) — 35.2, 35.8
  • Residency test, the \$430 downside — 30.8
  • Responding to a suspected loss — 34.9
  • Responsible alcohol service training — 18.5
  • Responsible service at the bar — 15.7, 15.8
  • Restaurant chart of accounts — 31.2
  • Restaurant concept — 2.1, 2.5, 2.7
  • Restaurant culture, operational definition — 21.1
  • Restaurant failure rate — 1.1
  • Restroom accessibility — 8.6
  • Restrooms and fixture counts — 7.2
  • Restructuring — 39.5
  • Retail and CPG, channel margins — 35.7
  • Retainage — 6.6
  • Retaliation — 20.8
  • Retention bundle, second-order returns — 23.8
  • Retention levers, priced — 21.7
  • Retirement rollover as injection — 5.2
  • Return on a control program — 34.6
  • Return on capital, small format vs. brick-and-mortar — 30.1
  • Return on retention as a function of baseline turnover — 21.7
  • Return on the franchisee's equity — 36.6
  • Return per dollar of personal exposure — 35.8
  • Revenue base, naming the — 32.3
  • Revenue bridge — 4.3
  • Revenue bridge (patio, events, off-premise) — 32.3
  • Revenue bridge arriving after the first quarter — 9.7
  • Revenue bridge, Bellwether — Business Plan checkpoint
  • Revenue bridge, itemized vs. turns-based — Business Plan checkpoint
  • Revenue bridge, patio component — 7.1
  • Revenue ceiling set by design — 7.1
  • Revenue gap to the plan figure — 2.5
  • Revenue identity (seats × turns × check × days) — 2.5
  • Revenue per occupied seat-hour — 24.2, 24.5
  • Revenue split structures (pop-up / residency) — 30.4
  • Revenue vs. receipts — 34.4
  • Reversibility as a decision axis — 35.3
  • Review average, exposure by review count — 27.3
  • Review gating — 23.6, 27.3
  • Review management — 23.6
  • Review response — 27.3
  • Review response, four moves — 23.6
  • Review response, prohibitions — 23.6
  • Review solicitation, platform differences — 27.3
  • Review volume as a defense — 23.6
  • Review-average offset formula x = (A−1)/(5−A) — 23.6
  • Reviews as an atmosphere measurement — 3.6
  • Reviews as ranking inputs — 23.6
  • Reviews read by theme — 23.6
  • Reviews, offset identity — 27.3
  • Revising the labor line — 40.9
  • Revision dates on documents — 18.6
  • Revolving line of credit — 33.8
  • RevPASH (revenue per available seat-hour) — 24.1, 24.2, 24.3, 24.8, Business Plan checkpoint
  • RevPASH, decomposition into three levers — 24.2, 24.5
  • RevPASH, limits as an objective function — Business Plan checkpoint
  • RevPASH, off-premise revenue excluded from — Business Plan checkpoint
  • Rewards cards, funded by merchant interchange — 26.7
  • Right-sizing containers — 38.6
  • Ring it before you pour it — 34.6
  • Rising ticket time as a door problem — 22.8
  • Risk & Contingency section — Business Plan
  • Rolling prep forecast — 38.3
  • Room flip and incremental cleaning — 29.7
  • Roster reconciliation (heads, positions, FTE) — 31.5
  • Rotation of counting and ordering duties — 34.1, 34.8
  • Rounding rules, menu pricing — 16.4
  • Route and location strategy — 30.3
  • Royalty, computed on gross sales — 36.1, 36.5, 36.6
  • Ruling out innocent explanations in writing — 34.9
  • Runway — 33.1, 33.3

S

  • S corporation election — 8.1
  • Safety stock, sizing — 13.3, 13.8
  • Salaried labor as fixed cost — 32.1
  • Salary basis test — 20.5
  • Salary level test — 20.5
  • Salary-history bans — 17.6
  • Sales per labor hour (SPLH) — 19.4, 19.8
  • Sales per seat — 4.3
  • Sales per square foot — 4.3
  • Sales representative, suggested orders — 13.1
  • Sales tax as a liability — 1.4, 31.9, 32.8
  • Sales tax as a liability, not revenue — 34.4
  • Sales tax commingling — 39.2, 39.5, 39.8
  • Sales tax swept to a separate account — 40.9
  • Sales tax, as trust-fund money — 33.2, 33.5
  • Sales tax, remittance lag — 33.5, 33.7
  • Sales-only bonus, failure modes of — 40.4
  • Salmonella Typhi — 25.1
  • Salmonella, nontyphoidal — 25.1
  • Salsa verde as a shared component — 10.3
  • Same-night note discipline — 23.5
  • Sample size and sampling noise — 12.2, 12.7, 12.8
  • Sanitizer bucket dilution — 25.4
  • Sanitizer concentration — 13.5
  • Sanitizer concentration and contact time — 25.4
  • Sanitizer concentration testing — 18.5
  • Sanitizer concentration, 200–400 ppm quat — 22.7
  • sauté station, single-manned — 14.3, 14.4
  • SBA 504 — 5.3
  • SBA 7(a) — 5.3
  • SBA 7(a), as a plan's reader (preview) — 4.1
  • SBA Franchise Directory — 36.2
  • SBA guaranty (distinguished from personal guarantee) — 5.3, 5.4
  • Scaling culture — 37.8
  • Scanning the room — 18.4
  • Scarcity as part of the product — 35.4
  • Schedule diseases, the five — 21.4
  • Schedule of values — 6.6
  • Schedule posting notice — 21.4, 21.7
  • Schedule writing, sequence of — 19.5
  • Schedule-stability report — 21.4
  • Scheduling software — 26.4
  • SCORE — 40.3
  • Screen overload — 26.3
  • Seafood species substitution — 38.7
  • Seasonal menu change cadence — 10.8
  • Seasonality — 33.5, 33.6
  • Seasonality and menu changes — 12.7, 12.8
  • Seasonality and the annual average — 32.6, 32.8
  • Seasonality and the choice of opening month — 9.2
  • Seasonality in cost cards — 11.8
  • Seasonality in mobile formats — 30.2
  • Seat supply, computing added — 2.4
  • Seat turns — 24.2, Business Plan checkpoint
  • Seat turns (applied) — 7.1, 7.7
  • Seat turns versus table turns — 22.5
  • Seat turns, as a forecast assumption — 4.3, 4.6
  • Seat-hour inventory, computing — 24.1, Business Plan checkpoint
  • Seat-hour, as perishable inventory — 24.1, 24.2
  • Seat-to-square-foot ratio — 7.1
  • Seating density (sq ft per seat) — 3.3, 3.7
  • Seating density and check average — 7.1
  • Seating mix and table combinability — 7.2
  • Seating rotation on covers, not tables — 22.2
  • Seats, turns, and revenue estimation — 1.7
  • Second approved source — 13.1, 13.3, Business Plan
  • Second approved supplier — 10.3
  • Second visit, brand's role in — 3.1
  • Second visit, economics of — 1.5
  • Second-cheapest bottle — 16.4
  • Second-generation space — 6.2
  • Second-location pro forma — 35.3
  • Second-location test, the seven gates — 35.1
  • Section and shift conflict — 21.5
  • Section imbalance, income effect — 22.2
  • Sections by volume, three to five — 22.2
  • Securities law and private offerings — 5.7
  • Securities regulation and investor projections — 4.1
  • Segregation of duties at ownership level — 37.4
  • Self-closure, duty of the permit holder — 25.7
  • Self-de-leveraging asset, the single unit as — 35.8
  • Self-pouring, and why the server pours — 16.7
  • Self-serve data export on a schedule — 26.8
  • Selling a restaurant, what determines the multiple — 35.8
  • Selling events, inbound — 29.9
  • Semi-variable (mixed) cost — 32.1
  • Seniority buys shifts, not sections — 22.2
  • Sensitivity analysis — 4.6
  • Separation of duties — 34.1, 34.2
  • Separation of duties, practical substitutes for — 34.1
  • Sequence of service, standard times by step — 22.1
  • Sequence of service, the twelve-to-fifteen steps — 22.1, 22.7
  • Sequence of service, training the — 18.4
  • Server personal liability — 8.4
  • Server to assistant general manager — 40.1, 40.2
  • Service & FOH Operations plan section — Business Plan
  • Service animals and policy modification — 8.6
  • Service charge — 20.4, Business Plan
  • Service charge and surcharge disclosure — 22.7
  • Service charge and the regular rate for overtime — 29.6
  • Service charge as wages — 29.6
  • Service charge vs. gratuity — 29.6
  • Service charge, disclosure obligations — 20.4
  • Service charge, sales tax treatment — 20.4
  • Service judgment scenarios — 18.4
  • Service recovery — 23.4
  • Service recovery paradox — 23.4
  • Service recovery, as review prevention — 27.3
  • Service recovery, off-premise limits on — 28.4
  • Service standards document, writing — 18.1, 18.6
  • Service standards gap — Business Plan
  • Service standards, four properties of — 18.1
  • Service stations (FOH) — 7.2, 7.4
  • Service style as a concept decision — 2.5
  • Service to a minor and the group purchase — 8.4
  • Service vs. hospitality — 23.1, 23.8
  • Service-charge disclosure — 29.6
  • Service/hospitality matrix (Figure 23.1) — 23.1
  • ServSafe — 25.8
  • Set-for vs. guaranteed count — 29.4, 29.5
  • Seven-day absence test — 21.8
  • Seven-day return rule — 21.7
  • Sewage backup — 25.7
  • Shadow card (fully absorbed plate cost) — 11.2
  • Shadowing, structured — 18.2
  • Shape of the night, hourly occupancy — 24.3
  • Shape of the week — 2.3, 24.3
  • Shape of the week, empty seats — 27.8
  • Shape of the week, labor by day — 19.2
  • Share-taking vs. gap-filling — 27.8
  • Shared kitchen, sanitation risk from other tenants — 30.7
  • Shared overhead by unit count — 37.4
  • Shared-kitchen incubator — 30.7
  • Shellstock tags, 90-day retention — 25.1, 25.7
  • Shift length and staggered starts — 19.5
  • Shiga toxin-producing E. coli (STEC) — 25.1, case study 1
  • Shigella — 25.1
  • Short deliveries — 34.7
  • Shorting — 34.6
  • Shoulder hours — 24.8
  • Shoulder hours, filling — 15.8
  • Shoulder-hour bar program — 24.8
  • Shrink, wine — 16.5, 16.6
  • Shrinkage — 13.7
  • Side work / non-tip-producing work — 20.2, 20.6
  • Sidewalk cafe / encroachment permit — 8.2
  • Sign permit — 8.2
  • Signage rights (lease) and sign regulation (municipal) — 6.1, 6.7
  • Signature as receipt, not agreement — 21.6
  • Signature block, entity vs. personal — 8.1, 8.7
  • Silent integration failure — 26.4, 26.8
  • Silent overage (untracked salaried hours) — 21.4
  • Simple payback period — 38.5, 38.8
  • Simulated rush — 9.4
  • Single points of failure in the kitchen — 18.7
  • Single voice at the pass — 21.2, 21.5
  • Single-use packaging — 38.6
  • Site criteria and the real-estate model — 36.2
  • Site fee — 29.3
  • Site visit — 29.8
  • Site-independence — 35.2
  • Sitting on the fire — 22.6
  • Six-tops, value of — 24.4
  • Skill fit — 10.2
  • SKU creep and the cost of difference — 2.6
  • Slips, trips, and falls — 25.9
  • Small Business Development Center (SBDC) — 40.3
  • Small formats, the tradeoff (capital, ceiling, risk) — 30.1
  • Small-format contingency (Business Plan) — 30.8
  • Small-format second unit — 35.7
  • Smaller-of rule (whole-book threshold) — 34.5
  • Social media, what it can and cannot do — 27.4
  • Soft open — 9.5
  • Soft open instrumentation and the debrief — 9.5
  • Soft open, escalating four-service design — 9.5
  • Soft-open guests as advocates — 9.5
  • Sold against tendered (tie one) — 34.4
  • Sole proprietorship and general partnership — 8.1
  • Solid-fuel cooking appliance requirements — 7.6
  • Sommelier, operating without — 18.3
  • Sound level (dBA) in dining rooms — 3.3, 3.7
  • Source reduction — 38.3, 38.4
  • Sources and uses — 40.7
  • Sources and uses statement — 5.1
  • Sourcing channels — 17.3
  • Sourcing claim — 38.7, 38.8
  • Sourcing sheet — 38.7, 38.8
  • Sourcing-claim audit — 38.7
  • Sous chef classification — 20.5, Business Plan
  • Sous chef, the promotion to — 40.1, 40.2
  • Space measurement error — 6.4
  • Span of control — 37.4
  • Specials board as an R&D pipeline — 10.8
  • Specials, costing and pricing — 10.8
  • Specialty distributor — 13.1
  • Specification (spec), fields and failure modes — 13.2
  • Specification versus procedure versus standard — 37.2
  • Specifications never to cheap out on — 7.5
  • Spillage allowance — 15.3, 15.7
  • Split checks, decided at ordering — 22.7
  • Split shift — 19.5
  • Spoilage — 38.2, 38.3
  • Spoilage on slow-moving items — 10.4
  • Square feet per dining seat, by service style — 7.1
  • Squash and grains — 12.4, 12.6, 12.7
  • Staff awareness of distress — 39.2
  • Staff tasting program, cost and return — 16.7
  • Staff tenure and repeat-visit rate — 23.8
  • Staff-meal policy — 34.6
  • Staffing guide / labor matrix — 19.4
  • Staffing plan, Bellwether — 17.8
  • Stage (trial shift) — 17.5
  • Staging and pickup shelf — 28.6
  • Standard pour, by drink type — 15.5
  • Standardized recipe — 10.5
  • Standardizing the promise, not the sentence — 37.3
  • Standards audit — 37.3
  • Standards decay after week two — 18.8
  • Standards vs. wishes — 18.1
  • Standards, limits of — 18.1
  • Standing comp authority — 23.4, 23.8, Business Plan
  • Standing delivery window and a named receiver — 34.7
  • Standing evening spot (brewery, taproom) — 30.3
  • Standing order vs. order-to-par — 13.3
  • Star (quadrant) — 12.4, 12.5
  • Start date, value of — 39.3
  • State accessibility statutes and damages — 8.6
  • State sales-tax and seller's permit registration — 8.1
  • States without a tip credit — 20.2, 20.3
  • Station (front of house) — 22.2
  • Station (garde manger, sauté, hearth, fry/sides) — 7.3
  • Station capacity and the binding constraint — 7.3
  • Station depth — 18.7
  • station down, non-linear cost of — 14.3
  • Station hours vs. person hours — 19.4, 19.5
  • Station load map — 10.4
  • station map — 14.3
  • Station map and menu-driven bottlenecks — 9.4
  • Station ownership — 21.2, 21.5
  • Station rivalry — 21.5
  • Station rotation, published cycle — 22.2
  • station utilization — 14.3
  • Stay interview, three questions — 21.7
  • Step-count audit method — 7.4
  • Stipulated sum, cost-plus, GMP, time and materials — 6.6
  • Storage order by cooking temperature — 13.5
  • Storage order in the walk-in — 25.3
  • Storage, wine — 16.6
  • Strains and the two-person rule — 25.9
  • Stranded drink — 22.1
  • Structured interview — 17.4
  • Style-based list organization — 16.2, 16.7
  • Subchapter V — 39.6
  • Sublease vs. assignment — 39.5
  • Subordination and non-disturbance (SNDA) — 6.5
  • Substantial completion — 6.6
  • Substitution effects — 12.5, 12.7
  • Substitution, unapproved — 13.2, 13.4
  • Substitutions against spec — 34.7
  • Sunk-cost trap in cutting — 19.6
  • Sunk-cost trap, at business scale — 39.7
  • Supplier yield claims, limits of — 11.4
  • Supply-chain rebates and allowances — 36.8
  • Supply-chain test — 36.7
  • Supply-risk concentration — 10.3
  • Supply-side careers (distribution, equipment, technology) — 40.6
  • Surcharging — 26.7
  • Surprise count — 34.8
  • Surprise inspection, as a storage and cost event — 13.5
  • Surrender condition — 39.8
  • Sustainability and compostable packaging claims — 28.7
  • Sustainability, restaurant — 38.1, 38.8
  • Sweat equity — 40.4
  • Sweet spot — 10.6
  • Sweethearting — 34.6
  • Sweethearting (bar version; controls in Ch.34) — 15.7
  • Switching cost, computing it — 26.8
  • Syrups, house, ingredient and labor cost — 15.3
  • Sysco / US Foods, FTC challenge (2015) — 13.1
  • Systems that log (as a substitute for a second person) — 34.1

T

  • Table cycle — 22.5
  • Table management — 22.2, 22.3, 22.4
  • Table mix — 24.4
  • Table release rule — 24.4
  • Table reset time — 24.5
  • Table touch — 22.1, 22.8
  • Table touch, as an information instrument — 23.7
  • Table touch, the question that works — 22.1
  • Table-transfer policy — 20.8, Business Plan
  • Target guest — 2.2
  • Target-cost pricing — 11.5
  • Target-cost pricing, where it fails — 16.4
  • Tasting drive protocol — 28.5
  • Tasting menu, revenue per seat-hour — 24.5
  • Tasting-note cards — 16.7
  • TCS food (time/temperature control for safety) — 25.2
  • Teachability test — 36.7
  • Technical default — 5.4
  • Technology budget, all in — 26.9, Business Plan checkpoint
  • Technology cost as a percentage of sales — 26.9
  • Technology per cover and per service — 26.9
  • Telephone Consumer Protection Act (TCPA) — 27.5
  • Telling the staff — 39.8
  • Temperature and the cold table — 3.3
  • Temperature at receipt — 13.4
  • Temperature danger zone, training on — 18.5
  • Temporary and conditional permits — 8.3
  • Tenant-improvement (TI) allowance — 5.5
  • Tenant-improvement allowance, timing of payment — 6.3, 6.4, 6.6
  • Tenths method — 15.6
  • Term loan vs. line of credit — 5.4
  • Term, renewal, and the then-current agreement — 36.5
  • Termination, curable and non-curable defaults — 36.5
  • Territory carve-outs (non-traditional venues, alternative channels) — 36.5
  • Test strips — 25.4
  • Thawing, the four methods — 25.2
  • The "golden triangle" as folklore — 10.6
  • The 3.75% overtime rule of thumb — 20.5
  • The 86 list in pre-shift — 21.3
  • The 90-day gap report — 23.5, 23.7
  • The \$0 marketing plan, true cost of — 27.9
  • The accidental franchisor — 36.9
  • The alternative (persona field) — 2.2, 2.4
  • The annual subscription audit — 26.9
  • The audition table — 23.3
  • The check, accuracy and reading it — 22.7
  • The completed business plan, section list — 40.7
  • The correction test — 17.5
  • The cost controls impose on trust — 34.8
  • The eight verification questions — 8.3
  • The eight-week absence test — Business Plan
  • The first eight seconds — 3.4
  • The first ninety days — 9.7
  • The five jobs of a menu — 10.1
  • The founder's job after growth — 37.8
  • The four levers that move technology cost — 26.9
  • The four moves of recovery — 23.4
  • The free manager on opening night — 9.6
  • The frequency lever (Figure 23.2) — 23.2
  • The guest feedback loop (Figure 23.8) — 23.7
  • The guest you lose on purpose — 23.8
  • The honest cost of not growing — 35.8
  • The honest wait — 22.4
  • The hood and grease-interceptor discovery (Bellwether) — 6.2, 6.3
  • The integration ladder — 26.8
  • The known-versus-tracked line — 23.5
  • The last ninety seconds, the goodbye — 22.7
  • The life ownership costs — 40.5
  • The line — 7.3
  • The manager's walk, the five stops — 22.8
  • The menu meeting — 10.1
  • The one-star swing claim, handled honestly — 23.6
  • The order of cutting — 7.6
  • The ownership path — 40.5
  • The pass / expo — 7.3
  • The poultry program — 10.3
  • The pre-service (4:45) walk — 3.6
  • The recovery window (Figure 23.5) — 23.4
  • The save, detection signals — 22.8
  • The second Friday in October, priced (Figure 23.3) — 23.4
  • The shape of the week (covers by night) — 7.1, 7.7
  • The structural conflict (dependence on the next sale) — 36.8
  • The systems test — 36.7
  • The twenty-minute clock — 28.5
  • The visit that matters — 37.7
  • The wrong interval (annual coverage vs. weekly liquidity) — 40.8, 40.10
  • Theft as the seventh rung — 34.6
  • Theft, place in the investigation order — 11.7
  • Theoretical-to-plan food cost bridge — Business Plan checkpoint
  • Thermal cycling and seepage — 16.6
  • Thermometers, probe and ambient — 25.2, 25.7
  • Thin capitalization — 8.1
  • Third-party (guest) harassment — 20.8
  • Third-party certification — 38.7
  • Third-party delivery and the royalty base — 36.5
  • Third-party marketplace, definition — 28.1, 28.4
  • Third-party reporting line — 21.5
  • Thirteen-week cash forecast in distress — 39.2
  • Thirteen-week cash forecast, re-run — 40.9
  • Thirty / sixty / ninety-day checks — 18.8
  • Thirty-day check — 17.8
  • Thirty-year single-unit career — 35.8
  • Three ceilings compared, 151 / 144 / 132 — 22.5
  • Three tiers of recognition — 23.5
  • Three-compartment sink — 25.4
  • Three-element test for a franchise — 36.9
  • Three-payment structure — 29.5
  • Three-sentence test — 2.1, 2.7
  • Three-tier alcohol distribution structure — 8.3
  • Three-tier credit terms on alcohol — 33.4
  • Three-tier system — 16.3
  • Three-year pro forma summary — 40.7
  • Throughput at 95 covers — 10.4
  • Throughput impact — 28.6
  • Throughput risks (flatbread, ribeye, par-roast, sauté) — 10.4
  • TI allowance as reimbursement — 5.5
  • TI allowance, pricing it — 5.5
  • Ticket flow, send / fire / pick up — 22.6
  • ticket time — 14.5
  • Ticket time as a cause of comps — 34.3
  • Ticket-time degradation from delivery volume — 30.6
  • ticket-time report, reading — 14.5
  • ticket-time standard — 14.5
  • Ticket-time visibility, both directions — 21.5
  • Tied house — 16.3
  • Tiered comp authorization — 34.3
  • Time in grade — 40.2
  • Time-clock abuse, employee side vs. supervisor side — 34.1
  • Timing calendar — 33.5
  • Tip adjust and authorization mismatch — 26.7
  • Tip credit — 20.2, 20.3, 20.4, Business Plan
  • Tip credit (preview) — 1.6
  • Tip credit and untipped training hours — 9.3
  • Tip credit, revisited — 40.4
  • Tip manipulation — 34.6
  • Tip pooling — 20.3, Business Plan
  • Tip records as wage-and-hour records — 26.1, 26.7
  • Tip reporting and declared cash tips — 20.3
  • Tip sharing / tip-out — 20.3
  • Tip-credit makeup payment — 20.2, 20.6
  • Tip-credit notice, written — 20.2, 20.3, 20.6, Business Plan
  • Tipped minimum wage — 20.2
  • Tipped overtime calculation — 20.2
  • Tipping screens and prompt design — 26.7
  • Title I and the fifteen-employee threshold — 8.6
  • Title VII — 20.8
  • Tolerance gradient (poster vs. measurement vs. permission) — 21.1
  • Top-down forecast, why it fails — 4.3
  • Tornado ranking of assumptions — 4.6
  • Total sales growth as an anesthetic — 37.6
  • Touchpoint — 3.4
  • Touchpoint ownership — 3.4, 3.6
  • Trade area — 2.3, 35.4
  • Trade credit, establishing before opening — 9.1, 9.2
  • Trade-area overlap — 35.4
  • Trademark search and clearance — 3.2
  • Trading labor for cost of goods sold — 19.8
  • Traffic counts, capturable vs. gross — 6.1
  • Traffic, price, and mix decomposition — 37.6
  • Trainer, selecting and paying — 18.2
  • Training as a hidden payroll cost — 18.2, 18.8
  • Training budget, Bellwether — 18.2, 18.8, Business Plan
  • Training differential — 18.2
  • Training hours as compensable time (FLSA) — 9.3
  • Training hours by role — 18.2
  • Training job code — 18.2, 18.8
  • Training manual, contents and owners — 18.6
  • Training matrix — 18.7
  • Training payback period — 18.2, 18.8
  • Training pipeline, four phases — 18.2
  • Training program failure modes: owner, calendar, cost line — 18.8
  • Training program, five components — 18.2
  • Training sequence, why the order matters — 18.2
  • Transfer pricing between units — 37.5
  • Transfer, transfer fee, right of first refusal — 36.5
  • Transferability test — 36.7
  • Transfers between food and beverage — 13.7
  • Transfers between kitchen and bar — 31.3
  • Transport temperature control — 29.8
  • Trend vs. noise in labor reporting — 19.8
  • Trigger clause — 40.9
  • Trigger points — 39.2, Business Plan
  • Trim test — 11.3
  • Triple net (NNN) — 6.4
  • Truck extension, priced and deferred — 30.8
  • Truck replacement reserve — 30.2, 30.8
  • Truck, new vs. used — 30.2
  • Trust-fund payroll taxes — 39.5, 39.8, 39.9
  • Trust-fund taxes and responsible-person liability — 8.1
  • Trust-fund taxes, personal liability — 33.2
  • Truth in menu — 11.8
  • Tuesday, the economics of a slow — 32.4
  • Turn forgone vs. relationship preserved — 23.3
  • Turn rate, implied by a cover count — 4.3
  • Turn time, measuring by segment — 22.5
  • Turn-time report, reading one — 22.5
  • Turnaround board — 39.3
  • Turnaround diagnostic — 39.1, 39.3, 39.7
  • Turnaround, limits of — 39.3
  • Turning away a walk-in in opening week — 9.5
  • Turnover — 1.4
  • Turnover cost, training share of — 18.2
  • Turnover ledger, by position — 17.1
  • Turnover rate — 17.1
  • Turnover, cost of — 17.1
  • Twelve months in seat, the rule — 35.5
  • Two landlords (facility and platform) — 30.5
  • Two questions, the (wine service) — 16.7
  • Two rate codes for tipped positions — 20.2, Business Plan
  • Two units as the worst number of units — 35.3
  • Two weekly revenue bases — 31.1
  • Two-building Friday, the — 35.1
  • Two-person count rule — 34.2, 34.4
  • Two-sided markets and guest-side fees — 28.9
  • Two-tops, chronic shortage of — 24.4
  • Two-unit trap — 37.1, 37.4
  • Type I hood — 7.6
  • Type I hood, energy cost of — 38.5
  • Type II hood — 7.6

U

  • Un-coded comps as a control measure — 34.3, 34.4
  • Un-fired ticket, invisible minutes — 22.1, 22.6
  • Un-integrated boundary, labor cost of — 26.4, 26.8
  • Undercapitalization — 1.4
  • Undercapitalization in small formats — 30.1, 30.2
  • Undercapitalization, manufactured at the pre-opening line — 9.1, 9.7
  • Understaffed station, unmeasured cost of — 19.6
  • Underwriting a restaurant application — 5.3
  • Undocumented prior work — 6.2, 6.7
  • Unemployment insurance wage base — 20.6, 20.9
  • Unexplained residual — 34.5, 34.6
  • Unfenced discount, cost of leakage — 24.6
  • Uniform program and turnover cost — 3.6
  • Uniform System of Accounts for Restaurants — 31.2
  • Unit controllable profit — 37.6
  • Unit economics — 35.2
  • Unlogged waste — 34.6
  • Unpaid stages, wage-and-hour exposure — 17.5
  • Unrecorded sales — 34.6
  • Unused capacity inside an existing guaranty — 35.8
  • Upward-only communication, failure mode of — 21.2
  • Usage formula — 13.7
  • Usage formula, applied to beverage — 15.2, 15.6
  • Usage formula, applied to COGS — 31.3
  • Use of funds — 4.2
  • Use of funds, sources against — 5.1
  • Used equipment — 5.6
  • Utensils on request — 28.7
  • Utilities as a semi-variable cost — 32.1
  • Utility deposits and the security deposit — 9.1
  • Utility end-use allocation — 38.5
  • Utility queue as schedule risk — 7.6
  • Utility rebate programs — 38.5
  • Utilization rate, by purchasing program — 38.2, 38.3

V

  • Valuation of a pre-opening restaurant — 5.7
  • Value engineering — 6.6, 7.6
  • Values statements, limits of — 21.1, 21.7
  • Variable cost — 32.1, 32.2
  • Variable labor — 19.2
  • Variance threshold — 34.5
  • Variance thresholds, beverage — 15.2, 15.6
  • Variance tolerances — 11.7
  • Variance versus average — 37.3, 37.6
  • Variance, decomposing into causes — 11.7
  • Variance, hours vs. dollars vs. percentage — 19.8
  • Variance, investigation order — 11.7
  • Vegetarian entrée placement — 10.2, 10.6
  • Vendor and service contracts — 8.7
  • Vendor collusion — 34.6, 34.7
  • Vendor financing and equipment placement — 5.6
  • Vendor float — 33.2, 33.4
  • Vendor float as working capital — 39.5
  • Vendor fraud — 34.7
  • Vendor lock-in, as arithmetic — 26.2, 26.8
  • Vendor notification — 39.8
  • Vendor workout — 39.5
  • Verification, HACCP principle six — 25.5, 25.8
  • Vermin infestation as an imminent hazard — 25.7
  • Vermont Universal Recycling Law (Act 148) — 38.4
  • Veto power (party ordering) — 12.7
  • Vibrio — 25.1
  • Virtual brand — 30.6
  • Virtual brands, marginal economics of — 30.6
  • Visibility and sight lines — 6.1
  • Visible intoxication standard — 8.4
  • Visit frequency — 2.2, 2.3
  • Visit-count distribution — 27.7
  • Visit-shift rate — 35.4
  • Void — 34.3
  • Void distribution by employee — 34.3
  • Void, comp, and discount authorization in the POS — 26.1
  • Voids — 31.8
  • Vomiting and diarrheal event cleanup procedures — 25.1

W

  • Wage ladder, tested steps — 21.7, 21.8
  • Wage notice at hire — 20.1, Business Plan
  • Wage theft — 20.6
  • Wage-and-hour exposure as a control question — 34.1
  • Waitlist mechanics and fields — 22.4
  • Waiver of subrogation — 8.5
  • Walk-in as a financial statement — 13.5
  • Walk-in at 46°F, the discard event — 25.3
  • walk-in check — 14.8
  • Walk-in gaskets and strip curtain — 38.5
  • Walk-in sizing and delivery frequency — 7.3, 7.6
  • Walk-in temperature, cost of — 13.5
  • Wall of tickets — 22.3, 22.6
  • Warewashing — 25.4
  • WARN Act and state equivalents — 39.8
  • Warning signs, numeric thresholds — 39.2
  • Waste allowance — 11.2
  • Waste audit — 38.2, 38.8
  • Waste audit, failure modes — 38.2
  • Waste audit, five streams — 38.2
  • waste log — 14.8
  • Waste log (see also Ch. 13) — 38.2
  • Waste log and reason codes — 13.8
  • Waste log as a control document — 34.6
  • Water intensity — 38.5
  • wave splitting (party service) — 14.4
  • Wave-splitting a large party, zero capacity — 22.6
  • Wave-splitting, why it creates no capacity — 24.3, 24.5
  • Weather and calendar effects on forecast — 19.3
  • Weather as a cost line — 30.2
  • Website accessibility and WCAG — 8.6
  • Website, the five things it must do — 27.2
  • Weekday lunch route — 30.3
  • Weekly flash report — 31.6
  • Weekly labor report — 19.8
  • Weekly menu reprint — 10.8
  • Weekly prime-cost count from week one — 9.7
  • Weighing bottles as an inventory method — 15.6
  • Weight range, enforcing — 13.2, 13.4
  • Weight spec written as a range — 34.5, 34.7
  • Weighted average price — 10.7
  • Well spirits — 15.5
  • Wet towel as a heat conductor — 25.9
  • What a manual can and cannot standardize — 36.7
  • What actually creates capacity, the three levers — 22.6
  • What not to do in an investigation — 34.9
  • What the plan was really for — 40.10
  • What transfers to a brick-and-mortar — 30.8
  • When not to grow — 35.8
  • Who audits the owners — 37.4
  • Who owns the guest — 26.6
  • Who owns the guest, priced — 28.4
  • Who packs the order — 28.6
  • Whole-bird program — 12.7
  • Whole-dollar pricing — 10.7
  • Why good people leave — 21.7
  • Why people leave the operations ladder — 40.6
  • Window-hours as perishable inventory — 30.3
  • Wine cost percentage — 16.1, 16.4
  • Wine inventory, as parked capital — 33.2, 33.3
  • Wine list architecture — 16.1, 16.2
  • Wine markup — 16.4
  • Wine share of beverage revenue — 16.1
  • Wine training: price bands — 18.3
  • Wine training: six axes — 18.3
  • Wine training: the two-question sell — 18.3
  • Wine, structural cost position (owned by Ch.16) — 15.1, 15.2
  • Wood-burning appliance regulation — 2.3, 2.6
  • Wood-fired hearth as a differentiator — 2.6
  • Work that does not require a certificate of occupancy — 9.2
  • Workers' comp inside the labor line and prime cost — 8.5
  • Workers' compensation exclusivity — 20.9
  • Workers' compensation insurance — 8.5
  • Workers' compensation insurance, as a labor cost — 19.1, 19.7
  • Workers' compensation payroll audit — 20.6, 20.9
  • Workers' compensation premium and class codes — 25.9
  • Working aisle width — 7.3
  • Working capital — 33.2, 33.3
  • Working interview — 17.5
  • Working-capital requirement, bottom-up — 33.3
  • Working-capital reserve — 1.4
  • Working-capital reserve in a controlled account — 40.8
  • Working-capital reserve measured in days of fixed cost — 9.7
  • Working-capital reserve, as a use of funds — 4.2
  • Working-capital reserve, sizing test — 5.2
  • Workweek, defined — 20.1
  • Write-it-down test — 37.2, 37.3
  • Write-up, required elements — 21.6
  • Written scope for a leader — 35.5
  • Written substantiation of an FPR — 36.4

Y

  • Year 3 occupancy escalation — 31.9
  • Year one, why it is the hardest — 4.5
  • Yield management, origins in aviation and hotels — 24.1, 24.6
  • Yield percentage — 11.3, 11.4
  • Yield test, running one — 11.4

Z

  • Zoning and use classification — 2.3