Index
Generated from key terms defined across the book. Chapter numbers link to the chapter.
- A 4D sequence for one hard week — Ch. 35
- A backup pump. — Ch. 21
- A building grid — Ch. 18
- a bulletin is not a directive — Ch. 7
- A caution about the personal diary. — Ch. 26
- A certificate of insurance is not coverage. — Ch. 5
- A change in appearance, weight, or hygiene — Ch. 41
- a change order that has not been written — Ch. 28
- a checklist — Ch. 6
- A clean example. — Ch. 15
- A close-in release is a hold point. — Ch. 23
- A code that has not moved in three months — Ch. 28
- A comparison to historical normals — Ch. 18
- A construction change directive — Ch. 25
- A coordination process that stops at sign-off — Ch. 35
- A cost cap. — Ch. 39
- a cost code, opened before the impact happens. — Ch. 31
- A date — Ch. 27
- A dedicated make-ready or production manager — Ch. 27
- A design error or omission. — Ch. 31
- A detail callout — Ch. 7
- A drawing log with revision levels. — Ch. 7
- A duration of roughly 1 to 20 work days. — Ch. 14
- A facilitator who is not the boss. — Ch. 27
- A failure sends you back to find the source — Ch. 36
- A fee in dollars, not a percentage. — Ch. 4
- A field mockup — Ch. 23
- A fixed budget. — Ch. 3
- A fixed window — Ch. 39
- A genuine opportunity to cure — Ch. 19
- A hidden or differing site condition. — Ch. 31
- A hidden-exclusion bid — Ch. 12
- A hold point mislabeled as a witness point. — Ch. 23
- A humane schedule is a health intervention — Ch. 41
- A hungry contractor makes bad decisions — Ch. 2
- A kill criterion — Ch. 39
- a lag is a duration with no owner. — Ch. 14
- A laser level / rotating laser — Ch. 18
- A laser plummet — Ch. 18
- A layout robot — Ch. 18
- A layout verification step. — Ch. 7
- A life event you know about — Ch. 41
- A low number is a question, not an answer. — Ch. 13
- A material-handling plan is a safety plan. — Ch. 18
- a measured strength instead of a fixed duration. — Ch. 39
- A miss is safe to declare. — Ch. 27
- a model you cannot trust is worse than no model, — Ch. 39
- a money question — Ch. 31
- A monthly cut-off memo — Ch. 28
- a name and a number on every tag and every badge — Ch. 24
- a named human owner — Ch. 27
- A named interpreter for incidents and discipline — Ch. 41
- A named owner — Ch. 39
- A named person — Ch. 27
- A named person and a date — Ch. 26
- A near-miss report is never a disciplinary event. — Ch. 24
- A necessary framing before anything else. — Ch. 41
- A neutral can say things the parties cannot. — Ch. 33
- A note on the fee arithmetic — Ch. 24
- a number made comfortable instead of true. — Ch. 11
- A number without a source is worth zero. — Ch. 33
- A one-way consequential damages waiver. — Ch. 15
- A performance mockup — Ch. 23
- A phase and its end milestone. — Ch. 27
- A phased opening. — Ch. 3
- A plan revision mid-community. — Ch. 37
- A pre-registered success criterion — Ch. 39
- A pre-submittal meeting for complex packages. — Ch. 25
- A project benchmark — Ch. 18
- A project with no agreed origin will waste weeks. — Ch. 35
- A qualified bid — Ch. 12
- A queue is visible on the ground. — Ch. 37
- A quote excluded something — Ch. 12
- A quoted material price has a shelf life. — Ch. 12
- a rate — Ch. 38
- A ratio of about 23 to 1 — Ch. 41
- A relationship in which bad news travels early — Ch. 33
- A request — Ch. 33
- A right in the subcontract. — Ch. 19
- A round number in the forecast column — Ch. 28
- A savings split worth having. — Ch. 3
- a schedule of collection dates. — Ch. 40
- a scope question — Ch. 31
- A scope-gap hunt finds double-buys too. — Ch. 16
- A section callout — Ch. 7
- A shared risk/reward pool. — Ch. 3
- A shopped price gets recovered in scope. — Ch. 13
- A single controlled gate — Ch. 18
- A single planner holds the model — Ch. 27
- A spare-parts strategy — Ch. 21
- A specific, finishable deliverable — Ch. 27
- A spotter with one job — Ch. 21
- A state matter — Ch. 42
- A statement of your entitlement position — Ch. 29
- A statutory notice deadline is a wall. — Ch. 5
- A stop-point decision — Ch. 21
- A structured document review — Ch. 6
- A subcontractor in distress. — Ch. 28
- A submittal log is a schedule. — Ch. 25
- a substantiated impact component — Ch. 31
- A substitution transfers risk to you. — Ch. 7
- A surety is not an insurer. — Ch. 5
- A threshold test — Ch. 18
- A time impact analysis inserts a fragnet — Ch. 33
- a time question — Ch. 31
- A total station — Ch. 18
- A verb-noun-location name. — Ch. 14
- A walk of the building — Ch. 29
- A wall. — Ch. 27
- A warning about double counting. — Ch. 6
- A witness point mislabeled as a hold point. — Ch. 23
- A word on EIFS, — Ch. 9
- A written authorization threshold — Ch. 4
- A written definition of the cost of the work — Ch. 4
- A written notice of the backcharge — Ch. 19
- A written pour plan — Ch. 21
- A-1 — Ch. 7
- A-103 — Ch. 25
- A-107 — Ch. 25
- A-118. — Ch. 26
- A-119. — Ch. 26
- A-120. — Ch. 26
- A-121. — Ch. 26
- A-122. — Ch. 26
- A-421 — Ch. 25
- A. Value concentration — Ch. 39
- A/E — Ch. 3
- AACE International — Ch. 11 29 42
- AAN — Ch. 25
- Abatement. — Ch. 24
- ABC — Ch. 42
- ability to influence the outcome — Ch. 6
- ability to influence what the building costs — Ch. 1
- Able to hold two incompatible facts at once. — Ch. 1
- abnormal — Ch. 33
- about 1.3 to 1. — Ch. 35
- About 7 hours of elapsed time, once — Ch. 23
- About the work, never the person — Ch. 41
- Above 1.00 — Ch. 24
- above 1.00 — Ch. 38
- above-ceiling inspection — Ch. 9
- ABOVE-CEILING INSPECTION (HOLD POINT) — Ch. 9
- Above-ceiling MEP — Ch. 9
- above-ceiling rough-in inspection — Ch. 10
- Absence — Ch. 41
- Absenteeism and turnover. — Ch. 20
- Absenteeism rises — Ch. 20
- Absorb it, and say so out loud. — Ch. 33
- Absorption rate and cycle time — Ch. 37
- Accelerated bridge construction (ABC) — Ch. 38
- Acceleration — Ch. 29 31
- Acceleration (directed) — Ch. 33
- Acceleration costs — Ch. 33
- Accept — Ch. 11 16 6
- accept — Ch. 6
- Accept as modified — Ch. 11
- Accept partial — Ch. 16
- Acceptance testing. — Ch. 8
- Acceptance. — Ch. 23
- accepted — Ch. 31 40
- ACCEPTED TOTAL (13 items) — Ch. 11
- Access — Ch. 11 15
- Access above hard ceilings — Ch. 10
- Access and egress. — Ch. 18
- Access and housekeeping — Ch. 22
- Access and material availability. — Ch. 20
- Access credentials — Ch. 40
- access from below for service. — Ch. 10
- Access panels — Ch. 16
- Access. — Ch. 22 8
- Accountability does not transfer to a tool. — Ch. 39
- Accounting — Ch. 28
- Accounting looks backward and must be right. — Ch. 28
- Accounts payable coding — Ch. 28
- accrual — Ch. 28
- accrual schedule — Ch. 28
- accruals — Ch. 28
- Accruals are not optional. — Ch. 28
- Accrue. — Ch. 30
- ACI — Ch. 8
- ACI 318 — Ch. 8
- ACI 347 — Ch. 22 8
- ACI publishes guidance for both — Ch. 8
- Action — Ch. 25
- action — Ch. 25
- Action / owner / due — Ch. 7
- Actions. — Ch. 26
- Activity — Ch. 27
- activity — Ch. 28
- Activity count and average duration — Ch. 14
- Activity duration — Ch. 14
- Activity G. — Ch. 27
- activity hazard analysis (AHA) — Ch. 24
- activity-on-node (AON) — Ch. 14
- actual — Ch. 28
- actual charged hours on real jobs — Ch. 20
- Actual cost (AC) — Ch. 30
- actual cost, tracked separately — Ch. 40
- Actual finishes — Ch. 29
- actual hours charged — Ch. 30
- actual losses — Ch. 24
- Actual margin — Ch. 38
- actual measured quantities — Ch. 4
- Actual starts — Ch. 29
- Actual unit rate — Ch. 28
- Actual unit rate. — Ch. 28
- actually accelerated — Ch. 29
- ACWP — Ch. 30
- add — Ch. 31
- Add a second hoist. — Ch. 18
- Add a telehandler for levels 1 and 2. — Ch. 18
- Added indirect cost — Ch. 29
- Addenda — Ch. 15 4 7
- Addenda govern over the base documents — Ch. 7
- addendum — Ch. 25
- Addendum — Ch. 25 7
- Addendum 3 — Ch. 13
- addendum log — Ch. 15
- adding capacity — Ch. 37
- Additional insured status. — Ch. 5
- Addressed correctly — Ch. 31
- adds — Ch. 39
- Adequate forces — Ch. 6
- Adjacent clinic operations. — Ch. 11
- Adjacent occupancy — Ch. 15
- adjusted — Ch. 33
- Administrative — Ch. 17 24
- Admixtures — Ch. 8
- Admixtures. — Ch. 22
- Adversarial pressure — Ch. 3
- Advertisement — Ch. 15
- Advertisement / invitation — Ch. 15
- Aerial lifts and scissor lifts. — Ch. 24
- Affidavit of payment of debts and claims — Ch. 40
- After — Ch. 24
- after — Ch. 26
- After you cross it — Ch. 31
- After you understand this — Ch. 10 14 27 28 3 4
- After you understand this, — Ch. 19 25 6
- After you understand this, here is how you think. — Ch. 32
- After-hours and weekend protocol — Ch. 18
- against — Ch. 38
- against the sequences of operations — Ch. 40
- AGC — Ch. 42
- Agenda 1 — Ch. 23
- Agenda 2 — Ch. 23
- Agenda 3 — Ch. 23
- Agenda 4 — Ch. 23
- Agenda 5 — Ch. 23
- Agenda 6 — Ch. 23
- Agenda 7 — Ch. 23
- Agenda 8 — Ch. 23
- aggregate — Ch. 34
- Aggregate available — Ch. 34
- Aggregate available today — Ch. 2
- aggregate billing position — Ch. 34
- Aggregate program — Ch. 34
- Aggregate size — Ch. 8
- aging report — Ch. 31
- Agree the coordinate origin in week one. — Ch. 35
- Agree this in writing before energization. — Ch. 40
- agreed — Ch. 33
- Agreement — Ch. 4
- Aha moment. — Ch. 1 10 11 12 13 14 15 16 17 19 2 20 21 22 23 24 25 26 27 28 29 30 32 33 34 36 37 38 40 41 42 5 6 8 9
- Ahead and efficient — Ch. 30
- Ahead but paying for it — Ch. 30
- AHJ — Ch. 17 25 36 5
- AHJ enforces the adopted, amended version — Ch. 36
- AHJ inspection — Ch. 18
- AIA A101 — Ch. 4
- AIA A102 — Ch. 4
- AIA A133 — Ch. 4
- AIA A201 — Ch. 4
- AIA G702 / G703 — Ch. 4
- Air — Ch. 9
- Air barrier benchmark installation (first 200 SF) — Ch. 23
- Air barrier continuity — Ch. 36
- air barrier continuity plan. — Ch. 36
- air control layer — Ch. 9
- Air entrainment — Ch. 8
- air infiltration — Ch. 9
- air leakage rate — Ch. 7
- Air-change rates. — Ch. 10
- Air-contaminant testing — Ch. 36
- Aircraft registration — Ch. 39
- Airports — Ch. 38
- Airspace authorization — Ch. 39
- AISC — Ch. 8
- all — Ch. 20
- all 44,000 BCY — Ch. 8
- All earthwork — Ch. 17
- all eleven of those people look busy. — Ch. 20
- All five — Ch. 33
- all four — Ch. 9
- All ground disturbance — Ch. 17
- All money in writing, before the work — Ch. 37
- All of them are management habits — Ch. 5
- all three — Ch. 12
- All three bidders exclude lead-lined board. — Ch. 13
- All-in monthly cost — Ch. 21
- All-or-nothing — Ch. 33
- All-terrain (AT) crane — Ch. 21
- Allocated internal rate — Ch. 21
- Allocation — Ch. 1
- Allocation. — Ch. 16
- allowable bearing pressure — Ch. 8
- allowable cost — Ch. 11
- allowance — Ch. 12 4 7
- Allowance — Ch. 4
- Allowances — Ch. 11 15
- allowances — Ch. 37
- Almost certainly not. — Ch. 5
- Almost certainly yes — Ch. 19
- altered — Ch. 24
- alternate — Ch. 4
- Alternates — Ch. 15
- alternates — Ch. 7
- alternating by floor — Ch. 27
- Aluminum — Ch. 36
- always a local question — Ch. 36
- always analyze Type I first. — Ch. 38
- Always. — Ch. 28
- Amara Boateng — Ch. 10 40
- amount and times — Ch. 26
- Amount billed to date — Ch. 34
- An allowance of anticipated adverse weather days — Ch. 18
- an audit tests the WIP schedule. — Ch. 34
- an EAC is not a claim. — Ch. 30
- An early bad CPI is probably the number. — Ch. 30
- An independent estimate. — Ch. 3
- An occupied adjacent clinic. — Ch. 3
- an offer — Ch. 19
- An order-of-precedence clause — Ch. 13
- An owner-directed change. — Ch. 31
- An RFI response that adds scope is a change. — Ch. 25
- An unrecognized cost overrun — Ch. 34
- Analyzing delay after the fact. — Ch. 27
- anchor bolt and embed submittal — Ch. 16
- Anchor bolts and embeds — Ch. 25
- Anchor bolts and embeds. — Ch. 25
- Anchor tolerance. — Ch. 9
- anchor-bolt and embed package — Ch. 8
- Anchorage. — Ch. 24
- Anchoring. — Ch. 6
- Anchors installed at truss set — Ch. 37
- and — Ch. 13 14 23 24 25 27 29 33 35 5
- And act the same day — Ch. 15
- and foreman — Ch. 23
- And here is the moment. — Ch. 29
- And here is the wrinkle nobody tells you about. — Ch. 12
- and hours — Ch. 26
- And it adds one genuinely new risk. — Ch. 12
- And it helps every other trade on the line — Ch. 37
- And it is blind above the top box — Ch. 6
- And it shows the deferred items — Ch. 40
- And look at the last row of the negative period. — Ch. 32
- and modeled — Ch. 36
- and near-miss reporting has fallen to one. — Ch. 41
- And notice the incentive shift. — Ch. 38
- And now the part I want you to actually keep. — Ch. 24
- And now the part that a manager must not duck. — Ch. 39
- And one option that does not work. — Ch. 21
- And Pri bought speed. — Ch. 31
- And put the offset on the same page. — Ch. 31
- And that is the go/no-go implication. — Ch. 34
- And the 8 days you own. — Ch. 33
- And the crew has mentally moved on. — Ch. 40
- and the crew who will do the work — Ch. 23
- And the finding that mattered. — Ch. 22
- And the honest note. — Ch. 42
- And the one that indicts management directly. — Ch. 20
- And the one with no arithmetic. — Ch. 6
- And the page was incomplete. — Ch. 29
- And the sentence to keep. — Ch. 19
- And the social pressure. — Ch. 6
- And the weight is real. — Ch. 42
- and then keep evaluating anyway — Ch. 33
- and time — Ch. 31
- And use your notice provisions. — Ch. 36
- and version — Ch. 36
- And what Dani got wrong. — Ch. 42
- And what Meridian gave up. — Ch. 3
- and wrote the rule — Ch. 35
- and you hold the documentation for each one — Ch. 36
- and you need the relationship intact — Ch. 41
- And you still finish late — Ch. 6
- anhydrous calcium chloride test — Ch. 9
- Announce the number. — Ch. 39
- Annual / discretionary bonus — Ch. 42
- Answer each before you read the response. — Ch. 24
- Answer fast. — Ch. 37
- Answer four questions. — Ch. 19 7
- anti-indemnity statutes — Ch. 16 24
- Anticipated adverse weather days — Ch. 6
- Anticipation — Ch. 1
- Any deviation from the standard. — Ch. 37
- any float. — Ch. 37
- Anything that blocks a life-safety route loses — Ch. 18
- Anything with a truck already rolling wins — Ch. 18
- APM on a smaller job — Ch. 42
- Apparent savings — Ch. 16
- Appeal rights are extremely limited — Ch. 33
- Appealable — Ch. 33
- application for payment — Ch. 32
- Apply — Ch. 11
- appointments measured in minutes — Ch. 18
- Apportioned effort — Ch. 30
- Apportionment by cause — Ch. 33
- Appraisal — Ch. 23
- Apprentice — Ch. 20 42
- Apprenticeship. — Ch. 20
- Approved as noted — Ch. 25
- approved as noted — Ch. 25
- Approved change orders move BAC. — Ch. 30
- Approved changes — Ch. 28
- approved sealed design — Ch. 25
- approved submittal — Ch. 23
- approximate industry heuristic — Ch. 34
- approximate industry heuristics, hedged — Ch. 34
- Apr 1 — Ch. 29
- Apr 11 — Ch. 29
- Apr 14 — Ch. 27
- Apr 15 — Ch. 29
- Apr 22 — Ch. 27
- Apr 8 — Ch. 27
- April 1 — Ch. 27
- April 14 — Ch. 27
- April 14, Year 1 — Ch. 25 9
- April 15, Year 1 — Ch. 25
- April 16, Year 1 — Ch. 25
- April 21 — Ch. 16 29
- April 25, Year 2 — Ch. 5
- April 6 through April 15 — Ch. 33
- April 7 — Ch. 25 29
- April 7. — Ch. 40
- April 8, Year 2 — Ch. 27
- April 9 through April 15 — Ch. 33
- April 9, Year 1 — Ch. 9
- Arbitration — Ch. 33 5
- Arbitration is no longer necessarily cheap. — Ch. 33
- Arch / ceilings — Ch. 35
- archaeology — Ch. 40
- Architect — Ch. 1
- Architect and engineer decisions. — Ch. 36
- architectural — Ch. 10
- Architectural precast panels — Ch. 13
- architecture — Ch. 26
- Architecture. — Ch. 42
- Are permanent fall-protection anchors designed in — Ch. 11
- area — Ch. 14
- areas — Ch. 35
- argue about line by line — Ch. 11
- Article 2 of the Uniform Commercial Code (UCC) — Ch. 16
- Artificial intelligence — Ch. 39
- as certified — Ch. 32
- As good as the estimator — Ch. 28
- as installed — Ch. 23
- As Late As Possible — Ch. 14
- as the work happens — Ch. 36
- As-built — Ch. 7
- As-built capture at closeout. — Ch. 39
- As-built drawings — Ch. 35
- As-built model — Ch. 35
- As-built progress at data date 150 — Ch. 29
- as-built survey — Ch. 16
- As-builts and closeout submittals — Ch. 16
- as-builts lie. — Ch. 8
- As-builts monthly, tied to the pay application — Ch. 25
- As-planned vs. as-built — Ch. 33
- Asbestos — Ch. 5
- asbestos — Ch. 5
- Ashfield. — Ch. 15
- ASHRAE Standard 90.1 — Ch. 10 36
- ASI — Ch. 25 7
- Ask for the change before you spend the money. — Ch. 15
- Ask for the time separately from the money — Ch. 38
- ask the direct question in your review — Ch. 42
- Ask the foremen first. — Ch. 41
- Ask what is under the mat. — Ch. 21
- Ask who owns it under the subcontracts — Ch. 10
- Ask your foreman. They know. Almost nobody asks. — Ch. 20
- ASP — Ch. 42
- Asphalt paving temperature — Ch. 38
- assemblies — Ch. 38
- assembly — Ch. 11 39 9
- Assembly / location — Ch. 7
- Assembly total — Ch. 11 36
- Assertion. — Ch. 32
- asset — Ch. 34
- ASSETS — Ch. 34
- Assign a buddy — Ch. 24
- assigned to a subcontractor by name. — Ch. 36
- Assistant project manager — Ch. 1
- Assistant project manager (APM) — Ch. 42
- assume responsibility — Ch. 7
- Assume you are not. — Ch. 5
- Assumptions — Ch. 11
- assumptions — Ch. 12
- assured equipment grounding conductor program — Ch. 18 24
- at any level. — Ch. 36
- at award and again at mobilization — Ch. 5
- at least as effective — Ch. 24
- at least four times the maximum intended load — Ch. 22
- at least roughly 200 to 400 man-hours. — Ch. 28
- at or below 4.5 MH/LF — Ch. 39
- at substantial completion — Ch. 40
- at the building line — Ch. 16
- at the end of each working day — Ch. 26
- at the load center you actually have — Ch. 21
- at the package level, this month. — Ch. 30
- at the start of — Ch. 23
- at the start of the project — Ch. 33
- at the wall, by the two trades involved, — Ch. 27
- At three days, take the week. — Ch. 21
- At three weeks, take the month. — Ch. 21
- at transitions — Ch. 36
- Attach the prime contract. — Ch. 16
- Attach the rate schedule. — Ch. 4
- Attachment matters as much as the membrane. — Ch. 9
- Attachments — Ch. 29
- Attic stock and extra materials — Ch. 40
- Attrition of reliability — Ch. 41
- audit — Ch. 11
- Audit — Ch. 34
- Aug 1 — Ch. 29
- Aug 27, Year 1 — Ch. 29
- Aug 4 — Ch. 29
- Auger boring / jack-and-bore — Ch. 38
- Auger-cast piles — Ch. 8
- August 17, Year 1 — Ch. 16
- August 18, Year 3 — Ch. 40
- August 2, Year 1 — Ch. 16 25
- August 24, Year 2 — Ch. 6
- August 27 — Ch. 10 29 8
- August 27 instead of August 4, Year 1 — Ch. 14
- August 27, Year 1 — Ch. 29 39 4 8
- August 3, Year 1 — Ch. 16
- August 31 — Ch. 32
- August 4 — Ch. 29 39 4
- August 4 of Year 1 — Ch. 21
- August 4 to August 27 of Year 1 — Ch. 26
- August 4 to August 27, Year 1 — Ch. 2 25
- August 4, Year 1 — Ch. 10 16 39 8
- authority — Ch. 17 31
- authority having jurisdiction — Ch. 17 5
- authority having jurisdiction (AHJ) — Ch. 40
- Autodesk Construction Cloud — Ch. 39
- Availability — Ch. 11 21
- availability — Ch. 21
- Available cavity — Ch. 10
- Avoid — Ch. 6
- award date — Ch. 25
- Award or protest — Ch. 15
- award-by date — Ch. 25
- Awarded 3/10 — Ch. 16
- Awarded 3/12 — Ch. 16
- Awarded 3/17 — Ch. 16
- Awarded 3/18 — Ch. 16
- Awarded 3/19 — Ch. 16
- Awarded 3/20 — Ch. 16
- Awarded 3/6 — Ch. 16
- Awarded 3/7 — Ch. 16
- B (LS 5), C (LS 9) — Ch. 14
- B first, A as a bridge. — Ch. 37
- B-9, and it is 140 feet away — Ch. 8
- B. Adoption surface — Ch. 39
- B2010 Exterior Walls — Ch. 7
- B2020 Exterior Windows — Ch. 7
- B3010 Roof Coverings — Ch. 7
- BAC — Ch. 30
- back — Ch. 9
- back to you, in their own words — Ch. 41
- back-schedule — Ch. 10
- back-schedule each one from the date it gates — Ch. 17
- Backcharge — Ch. 19 40
- Backcharge rights — Ch. 16
- Backcharges you will not recover. — Ch. 28
- Backer rod is not filler. — Ch. 9
- backfill — Ch. 8
- Backflow preventer certification — Ch. 40
- backing up — Ch. 24
- Backlog — Ch. 13 2
- Backlog in months — Ch. 2
- Backlog says sell. — Ch. 34
- Backlog-to-working-capital — Ch. 16
- Backshoring. — Ch. 22
- backward-looking — Ch. 16
- Bad forecasting culture. — Ch. 34
- Badging and orientation stickers — Ch. 18
- balanced — Ch. 38
- Balanced rates — Ch. 38
- Band — Ch. 15
- Bank — Ch. 8
- Bank (BCY) — Ch. 21
- bank measure — Ch. 12 8
- Bar chart (Gantt) — Ch. 14
- Bar sizes follow the eighth-inch rule. — Ch. 8
- Bare rental — Ch. 21
- barrier — Ch. 9
- BAS — Ch. 10
- Base bid — Ch. 13
- Base bid as submitted — Ch. 13
- base hourly rate — Ch. 20
- base of the wall below the window — Ch. 9
- Base of wall — Ch. 9
- Base salary — Ch. 42
- Base subject to contingency — Ch. 6
- Base unit cost — Ch. 11
- Base wage — Ch. 20
- base wage — Ch. 20
- Baseline — Ch. 29
- Baseline CPM schedule — Ch. 17
- Baseline float — Ch. 29
- baseline requirements, not credentials. — Ch. 42
- Basic (fundamental) commissioning — Ch. 40
- basic rate of pay — Ch. 20
- Basis for recommendation. — Ch. 16
- basis of estimate — Ch. 13
- basis of payment — Ch. 4
- Basis of proposal — Ch. 15
- bays — Ch. 8
- BCWP — Ch. 30
- BCWS — Ch. 30
- be careful what you write. — Ch. 5
- Be concrete. — Ch. 41
- Be consistent. — Ch. 41
- Be honest about what you cannot influence. — Ch. 36
- be slow to start the ladder and fast to climb it. — Ch. 19
- Bea Salgado — Ch. 6
- Became critical — Ch. 14
- Because they did the arithmetic. — Ch. 33
- Bedding and backfill are structural, not cleanup. — Ch. 38
- before — Ch. 16 21 23 24 26 31 4 5 9
- before anybody knew there would be an argument. — Ch. 26
- before award — Ch. 15
- Before each shift — Ch. 22
- before each shift — Ch. 24
- before it is buried. — Ch. 35
- before move-in overwhelms the facilities staff — Ch. 40
- before production fabrication starts. — Ch. 9
- before the building ever opens — Ch. 36
- before the first worker performs the first task — Ch. 17
- before the GMP is even final — Ch. 9
- Before you cross this threshold — Ch. 24 31
- Before you understand this — Ch. 10 14 27 28 4
- Before you understand this, — Ch. 19 25 6
- Before you understood this — Ch. 3
- Before. — Ch. 37
- behavior and collaborative capability — Ch. 15
- behind — Ch. 36 9
- Behind and over — Ch. 30
- Behind but efficient — Ch. 30
- Being right. — Ch. 42
- Believing — Ch. 34
- Bellweather flatbed in — Ch. 18
- below — Ch. 37
- Below 1.00 — Ch. 24
- below 1.00 — Ch. 38
- Below 300 decline — Ch. 15
- below 60 — Ch. 16
- below the line rate — Ch. 37
- below-grade waterproofing damage during backfill — Ch. 9
- Benchmark (first-work) installation — Ch. 23
- benchmark installation — Ch. 23
- Beneficial occupancy — Ch. 40
- Benefit funds. — Ch. 20
- Best fit — Ch. 4
- Best for — Ch. 33
- Best. — Ch. 33
- better — Ch. 38
- Better numbers at buyout. — Ch. 32
- Between projects — Ch. 28
- BID AMOUNT — Ch. 12
- Bid and P&P bonds — Ch. 5
- bid bond — Ch. 15
- Bid bond — Ch. 5
- Bid form — Ch. 15
- bid form — Ch. 15
- bid package — Ch. 16
- Bid peddling — Ch. 13 15 16
- bid protest — Ch. 15
- Bid protests — Ch. 5
- Bid rate — Ch. 38
- Bid rotation — Ch. 15
- bid schedule — Ch. 38
- Bid shopping — Ch. 13 15 16
- bid shopping — Ch. 15 2
- Bid unit price — Ch. 38
- bid-day requirement — Ch. 36
- Bid-tab spread, decoded. — Ch. 15
- bilateral — Ch. 38
- Bilingual delivery of every toolbox talk — Ch. 41
- Bilingual signage where it matters — Ch. 41
- Bill accurately the first time — Ch. 32
- BIM — Ch. 1 35
- BIM / VDC planning — Ch. 11
- BIM execution plan — Ch. 35
- binary — Ch. 27
- Bioretention areas and rain gardens — Ch. 36
- Blast plan — Ch. 38
- Blasting — Ch. 38
- blasting — Ch. 38
- Blocking and backing — Ch. 16
- blower door test — Ch. 37
- blower door test and a duct leakage test — Ch. 37
- Bluebeam — Ch. 39
- Bodies cannot do it. — Ch. 20
- bolts up — Ch. 8
- Bond and insurance costs — Ch. 33
- Bond and insurance. — Ch. 31
- bond around the lien — Ch. 5
- bonded public — Ch. 5
- Bonding — Ch. 13 19
- Bonding capacity — Ch. 2
- bonding program — Ch. 5
- booked today — Ch. 40
- boom lift — Ch. 24
- Boom lift (articulating or telescopic) — Ch. 21
- Boom lift BL-3 — Ch. 26
- Boom pump — Ch. 21
- Boom. — Ch. 2
- boring logs — Ch. 38
- Boring logs — Ch. 8
- both — Ch. 11
- Both are serious findings. — Ch. 34
- Both are written instruments. — Ch. 26
- both arguments have real content. — Ch. 20
- both chains are drawn heavy — Ch. 29
- both faces of the wall — Ch. 12
- both sign — Ch. 31
- Both systems complete at that corner. — Ch. 27
- both things, separately, in the same package — Ch. 29
- Both, and this is where it breaks — Ch. 7
- Bottom-up. — Ch. 6
- Bought budget — Ch. 28
- Bound the extent. — Ch. 23
- boundary — Ch. 7
- bounds the extent honestly — Ch. 23
- Brace release — Ch. 22
- braces removed early — Ch. 22
- branch — Ch. 10
- Branch duct, flex duct, small pipe — Ch. 10
- Branch wiring — Ch. 10
- break and eating areas — Ch. 18
- Break the alignment into two work zones — Ch. 38
- Break the package up. — Ch. 13
- BREEAM — Ch. 36
- Brenner Street Parking Structure — Ch. 34
- brevity — Ch. 14
- Bricklaying machine — Ch. 39
- Bridges and structures — Ch. 38
- Bridging documents — Ch. 3
- Bring a bigger crane. — Ch. 21
- Bring a plan, not just a number. — Ch. 29
- Bring the schedule — Ch. 31
- Broad form — Ch. 5
- bubble — Ch. 7
- Bucket capacity — Ch. 21
- Budget — Ch. 28
- Budget load and cost-code structure — Ch. 17
- Budget man-hours — Ch. 20
- budget overrun — Ch. 11
- budget transfer — Ch. 28
- buffer — Ch. 37
- buffer between trades across eleven houses — Ch. 37
- buffer space — Ch. 38
- build requirement with a test attached. — Ch. 36
- Build the project-specific plan — Ch. 15
- Build the remaining seven. — Ch. 4
- Build these seven pieces. — Ch. 14
- Buildability — Ch. 11
- building automation system — Ch. 10
- Building dried-in / enclosed — Ch. 9
- building dried-in, March 28, Year 2. — Ch. 27
- building dried-in. — Ch. 27
- building information modeling — Ch. 1
- Building information modeling (BIM) — Ch. 35
- Building product disclosure and optimization — Ch. 36
- Built-up (BUR) — Ch. 9
- Bulletin — Ch. 25 7
- bulletin or proposal request — Ch. 25
- burden multiplier — Ch. 11
- burdened — Ch. 11 31
- burdened rate — Ch. 12
- Burdened saving — Ch. 11
- burn ratio — Ch. 6
- Burnout is a genuine, structural problem — Ch. 42
- Business auto — Ch. 5
- Business development / preconstruction — Ch. 42
- But be honest about what that is worth. — Ch. 21
- But look at the timing. — Ch. 2
- But several will get you an interview — Ch. 42
- But the tickets are the credit. — Ch. 36
- buy or rent — Ch. 22
- Buy that person every time. — Ch. 20
- Buy the credit back elsewhere — Ch. 36
- Buy the switchgear three weeks earlier — Ch. 16
- buyer under contract — Ch. 37
- buying — Ch. 7
- Buying the job — Ch. 13
- Buying the job low to make it up on changes. — Ch. 31
- Buying work — Ch. 2
- Buyout — Ch. 16
- buyout — Ch. 36
- by 3/12 — Ch. 26
- by 3/13 — Ch. 26
- by 3/15 — Ch. 26
- by 3/20 — Ch. 26
- By area — Ch. 16
- by area — Ch. 27
- By CSI trade — Ch. 16
- by elevation — Ch. 29
- by name and by function — Ch. 33
- by name and by shift — Ch. 24
- By phase — Ch. 16
- By system — Ch. 16
- byproducts of the work — Ch. 40
- C-2 — Ch. 7
- C. Work displacement — Ch. 39
- Cable tray — Ch. 10
- calculated — Ch. 14
- calculated result — Ch. 37
- Calculation methods drift. — Ch. 36
- Calculations / delegated design — Ch. 25
- Caldwell Structural (engineer of record) review — Ch. 8
- Caldwell Structural review (contractual period) — Ch. 16
- Caldwell was not late. — Ch. 8
- calendar — Ch. 14
- calendar days — Ch. 1 27 29
- calendar days (CD) — Ch. 14
- Calendars, practically. — Ch. 14
- Call the vendor — Ch. 27
- Cameras with recorded, remotely monitored feeds — Ch. 18
- Can — Ch. 23
- Can prevent it. — Ch. 40
- can travel with a load — Ch. 21
- cannot audit an open book. — Ch. 4
- cannot be manufactured on demand. — Ch. 42
- cap the mobilization pay item — Ch. 38
- Capacity — Ch. 13 34
- capacity — Ch. 37
- capacity and their cash. — Ch. 2
- capacity ceiling — Ch. 37
- Capacity is indexed on radius, not boom length. — Ch. 21
- Capacity. — Ch. 5
- capillary voids — Ch. 8
- Capital — Ch. 34
- capital economics — Ch. 21
- capital or finance lease — Ch. 21
- Capital. — Ch. 5
- capped pursuit budget — Ch. 15
- Capture every wall before it closes. — Ch. 39
- capturing it in a structured form as it arrives — Ch. 35
- Cardinal box truck in — Ch. 18
- Cardinal Mechanical and Summit Roofing — Ch. 25
- Cardinal Mechanical bought out and licensed — Ch. 17
- career-path clarity — Ch. 20
- carefully study and compare — Ch. 7
- Carpenter — Ch. 20
- Carried in the estimate — Ch. 12
- Carried in the GMP (rounded) — Ch. 6
- carry — Ch. 37
- Carry a qualified allowance and say so out loud. — Ch. 13
- Carrying cost and timing — Ch. 37
- case study 2 — Ch. 11
- Casework and specialties — Ch. 9
- Cash flow is not profit. — Ch. 40
- cash flow is not profit. — Ch. 40
- Cash is a fact about Friday — Ch. 32
- Cash troughs happen where production decelerates — Ch. 32
- Cash, end of year — Ch. 34
- cash-flow and default risk — Ch. 13
- cash-flow curve — Ch. 14 32
- Cast-in-place — Ch. 8
- Cast-in-place concrete — Ch. 23 8
- Cast-in-place on falsework — Ch. 38
- Categories are counted and trended, — Ch. 27
- Categorize the causes. — Ch. 37
- Category — Ch. 27
- Caught in or between equipment. — Ch. 24
- Caught-in/between — Ch. 24
- caught-in/caught-between — Ch. 21
- Caulking and sealants — Ch. 16
- Causation — Ch. 33
- causation — Ch. 33
- Causation and damages. — Ch. 33
- Causation. — Ch. 25 33
- cause — Ch. 19
- CCD — Ch. 25 7
- CCIP — Ch. 5
- CCM — Ch. 42
- CCP — Ch. 42
- CD / WD — Ch. 12
- CDC — Ch. 41
- ceiling — Ch. 37
- Ceiling grid — Ch. 9
- Ceiling tile — Ch. 9
- Ceilings are at 350 for coordination, not 300. — Ch. 35
- Ceilings, soffits, bulkheads — Ch. 35
- Cement type, slump, and mix constituents. — Ch. 22
- center of rotation — Ch. 21
- center-of-glass — Ch. 9
- CEP — Ch. 42
- certainty — Ch. 4
- Certificate of Occupancy — Ch. 17
- Certificate of occupancy — Ch. 40
- Certificate of occupancy (CO) — Ch. 40
- Certificates — Ch. 40
- certification — Ch. 36 4
- certification is a joint product. — Ch. 36
- Certification is a premium — Ch. 36
- Certifications and test reports — Ch. 25
- Certified — Ch. 32
- certified diversion rate — Ch. 36
- Certified payroll — Ch. 38
- certified payrolls — Ch. 5
- Certified, Silver, Gold, and Platinum — Ch. 36
- CFO — Ch. 1
- Chain of custody — Ch. 26
- Chain-of-custody certification for wood — Ch. 36
- change — Ch. 22 31
- Change — Ch. 38
- Change in contractor result — Ch. 4
- change order — Ch. 11 17 25 26
- Change order — Ch. 25
- Change Order — Ch. 7
- Change order (CO) — Ch. 31 33
- Change order request / proposal (COR or PCO) — Ch. 33
- Change orders — Ch. 16 37
- change orders. — Ch. 2
- change to the contract documents — Ch. 11
- Changed means and methods — Ch. 29
- Changes — Ch. 4
- Changes (directed) — Ch. 33
- Changes only by change order. — Ch. 32
- Changes to the model — Ch. 29
- Chapter 13 detailed estimate — Ch. 42
- Chapter 14 CPM schedule — Ch. 42
- Chapter 16 buyout log — Ch. 42
- Chapter 18 site logistics plan — Ch. 42
- Chapter 24 site-specific safety plan — Ch. 42
- Chapter 28 cost report — Ch. 42
- Chapter 31 priced change orders — Ch. 42
- Chapter 33 delay analysis — Ch. 42
- Character — Ch. 34
- character — Ch. 38
- Character. — Ch. 5
- characteristic failure mode — Ch. 10
- Characteristic failure mode — Ch. 3
- Charge the owner for the as-built deliverable. — Ch. 39
- chargeable — Ch. 38
- Chart values are gross. — Ch. 21
- Check the columns before you go on. — Ch. 32
- Check the data date and the footing. — Ch. 30
- Check the footing. — Ch. 30
- Check the result — Ch. 36
- Check whether the constraint is creating float. — Ch. 14
- Check your procurement code. — Ch. 5
- Check your understanding. — Ch. 1 10 11 12 13 14 15 16 17 18 19 2 20 21 22 23 24 25 26 27 28 29 3 30 31 32 33 34 35 36 37 38 39 4 40 41 42 5 6 7 8 9
- check yours — Ch. 40
- check. — Ch. 12
- Chief estimator — Ch. 1
- chief executive — Ch. 42
- Chilled beams — Ch. 10
- CHST — Ch. 42
- Circadian fatigue. — Ch. 24
- Circular. — Ch. 28
- Cisterns and rainwater harvesting — Ch. 36
- Cite something. — Ch. 23
- cited her own track record — Ch. 41
- cites — Ch. 23
- cites every source precisely — Ch. 7
- City of Rivermont Parks & Recreation. — Ch. 2
- Civil engineering. — Ch. 42
- Claim — Ch. 31 33
- claim — Ch. 33
- claim against your payment bond — Ch. 5
- Claims are not a moral failure. — Ch. 33
- Clarification — Ch. 25
- Clarifications of scope — Ch. 15
- clash matrix — Ch. 35
- class — Ch. 24
- Class 1 — Ch. 11
- Class 4 — Ch. 11
- Class 5 — Ch. 11
- Classification is where the risk lives. — Ch. 38
- Classification. — Ch. 38
- Classify — Ch. 38
- Cleanup — Ch. 16
- Cleanup and debris removal — Ch. 16
- clear assumptions page — Ch. 31
- Clear risk allocation, priced — Ch. 33
- Clearing — Ch. 8
- climate zone — Ch. 36
- clogs permanently — Ch. 36
- close out — Ch. 42
- Close the loop out loud. — Ch. 20
- Closeout — Ch. 13
- closeout plan — Ch. 39
- closeout sub-network built at notice to proceed — Ch. 40
- Closeout submittals — Ch. 25
- closing conference — Ch. 24
- Cloud / collaborative platforms — Ch. 14
- cluster targets — Ch. 11
- CM / general contractor — Ch. 1
- CM as agent — Ch. 3
- CM as Agent (CMa) — Ch. 3
- CM at Risk — Ch. 16 3 5
- CM at risk — Ch. 3
- CM at Risk (CMAR) — Ch. 11
- CM at risk. — Ch. 3
- CMa — Ch. 3
- CMAA — Ch. 42
- CMAR — Ch. 3
- CMU first floor — Ch. 8
- co-location — Ch. 27
- Co-location. — Ch. 3
- COBie — Ch. 35
- code — Ch. 36
- Code path may be non-standard — Ch. 36
- Code variation. — Ch. 37
- coefficient — Ch. 3
- cold joint — Ch. 1 21 8
- cold joint in the middle of a structural deck — Ch. 21
- Cold weather. — Ch. 8
- Cold-weather protection — Ch. 18
- Collapse of structures and materials. — Ch. 24
- Collect by — Ch. 40
- collect-by — Ch. 40
- collective bargaining agreement (CBA) — Ch. 20
- Colton Reyes — Ch. 37
- column — Ch. 32
- column line C-4 — Ch. 26
- Columns and pier caps — Ch. 38
- Combined daily exposure — Ch. 17
- Combined footing — Ch. 8
- Combustion equipment indoors. — Ch. 36
- comfort, not a proof. — Ch. 31
- Comfortable with people who are not like them. — Ch. 1
- Commercial / Institutional — Ch. 2
- commercial aviation activity — Ch. 39
- Commercial General Liability (CGL) — Ch. 5
- Commercial judgment across jobs you do not run — Ch. 42
- commercial kitchen — Ch. 40
- commercially useful and reliable — Ch. 42
- Commingled processing. — Ch. 36
- commissioned, and actually functional — Ch. 36
- Commissioning — Ch. 10 36
- Commissioning (Cx) — Ch. 36 40
- Commissioning agent — Ch. 1
- Commissioning agent (CxA) — Ch. 23
- commissioning agent (CxA) — Ch. 36
- Commissioning meeting — Ch. 26
- Commissioning report — Ch. 40
- Commissioning start — Ch. 10
- Commissioning support — Ch. 36
- commitment — Ch. 16 27
- commitment problem — Ch. 19
- commitments made — Ch. 27
- Committed — Ch. 28
- Committed cost — Ch. 28
- Committed far below budget, late in the job — Ch. 28
- Common law — Ch. 5
- Common law fills the gaps. — Ch. 5
- Common trap — Ch. 40
- Communicating with an owner and a lender. — Ch. 27
- Communication — Ch. 1
- Community notification. — Ch. 17
- Compacted — Ch. 8
- Compacted (CCY) — Ch. 21
- compacted measure — Ch. 8
- Company size changes everything. — Ch. 42
- compensable — Ch. 25
- Compensable — Ch. 29
- Compensable or non-compensable — Ch. 33
- Compensation. — Ch. 42
- Competence credibility. — Ch. 41
- Competency includes authority. — Ch. 24
- competent person — Ch. 22 24 38 8
- Competing schedules — Ch. 41
- Competition for shared temporary systems. — Ch. 24
- Competitive design-build. — Ch. 3
- Competitive sealed bidding — Ch. 5
- Compilation — Ch. 34
- Complaint — Ch. 24
- Complementary / no hierarchy — Ch. 7
- Complementary bidding — Ch. 15
- complete — Ch. 27
- complete but not conforming or not acceptable — Ch. 23
- complete to the corridor 3-C header — Ch. 27
- Complete, coordinated contract documents — Ch. 33
- complete, Level 2 Zone D — Ch. 27
- complete, Zone B exam-room pod only — Ch. 27
- completed — Ch. 5
- completed operations — Ch. 5
- Completeness and non-duplication. — Ch. 13
- Component prefabrication — Ch. 39
- components — Ch. 37
- composite cleanup crew — Ch. 18
- Compressing — Ch. 20
- Compute four things. — Ch. 22
- computed — Ch. 38
- Computer vision on site photos — Ch. 39
- Concealed conditions — Ch. 6
- concealment — Ch. 23
- Concrete — Ch. 36
- Concrete batch tickets — Ch. 26
- Concrete cold weather — Ch. 38
- Concrete design mixes — Ch. 25
- Concrete design mixes. — Ch. 25
- Concrete hot weather — Ch. 38
- concrete masonry unit — Ch. 22
- Concrete maturity sensors — Ch. 39
- Concrete pavement — Ch. 38
- Concrete pour — Ch. 18
- concurrency — Ch. 31 33
- concurrent — Ch. 29
- Concurrent — Ch. 33
- Concurrent delay — Ch. 29 33
- Condensation. — Ch. 9
- condition of payment — Ch. 29
- condition precedent — Ch. 2 32 33 38 4
- Conditional — Ch. 32 5
- conditional — Ch. 32 5
- Conduit, cable tray, low voltage — Ch. 10
- Confined space — Ch. 38
- Confined space. — Ch. 10
- Confined spaces multiply. — Ch. 36
- confirming letter — Ch. 26 31
- CONFIRMING LETTER CL-026 — Ch. 26
- confirming letter the same day — Ch. 26
- conformance — Ch. 20
- Conformance. — Ch. 23
- Congestion — Ch. 29
- Congestion. — Ch. 24
- Connecting. — Ch. 8
- Connections — Ch. 8
- Connections are engineered and structural. — Ch. 9
- Connectors and hold-downs — Ch. 8
- ConsensusDocs — Ch. 4
- consent of surety — Ch. 16
- Consent of surety — Ch. 40
- Consequence named, honestly — Ch. 41
- consequential damages waiver — Ch. 4 5
- Consolidation — Ch. 8
- Consolidation method. — Ch. 22
- constraint — Ch. 14 8
- Constraint — Ch. 27
- Constraint log — Ch. 27
- constraint log — Ch. 27
- constraints — Ch. 21
- Constructability findings are now change orders. — Ch. 11
- Constructability input on the imaging suite. — Ch. 3
- Constructability review — Ch. 11
- constructability review — Ch. 11 3
- Construction (the GMP) — Ch. 11
- Construction accounting and finance — Ch. 42
- Construction activity pollution prevention — Ch. 36
- Construction and demolition waste management — Ch. 36
- construction change directive — Ch. 17 26 31
- Construction change directive — Ch. 4
- Construction contingency — Ch. 11 6
- construction contingency went up — Ch. 11
- Construction coordination or quantity extraction — Ch. 35
- construction documents — Ch. 1
- Construction indoor air quality — Ch. 36
- Construction indoor air quality management plan — Ch. 36
- Construction is not a factory. — Ch. 27
- construction joint — Ch. 8
- construction loan — Ch. 37
- Construction management. — Ch. 42
- construction manager as constructor — Ch. 4
- construction manager at risk — Ch. 3
- Construction model — Ch. 35
- Construction observation — Ch. 40
- construction put in place — Ch. 2
- Construction stormwater permit and the SWPPP — Ch. 17
- Construction waste management — Ch. 36
- constructive acceleration — Ch. 19
- Constructive acceleration — Ch. 29 33
- Constructive change — Ch. 33
- Consuming float is not extending the project. — Ch. 29
- contact area — Ch. 12
- contained — Ch. 30
- Container — Ch. 18
- Contaminated soil and materials — Ch. 38
- contemporaneous — Ch. 33
- Contemporaneous conflict documentation — Ch. 38
- Contemporaneous cost records — Ch. 19
- Contemporaneous cost records for the delay period — Ch. 33
- Contemporaneous documentation. — Ch. 37
- contemporaneously — Ch. 26
- Content — Ch. 33
- Contents — Ch. 24
- Contest. — Ch. 24
- Contingency — Ch. 11 13
- Contingency drawdown ahead of percent complete — Ch. 28
- Contingency is not money. It is an admission. — Ch. 11
- Contingency is not padding. — Ch. 12
- continuing effect — Ch. 33
- continuing notice — Ch. 33
- Continuing notice for ongoing impacts. — Ch. 33
- continuity across every trade boundary — Ch. 36
- Continuous (strip) footing — Ch. 8
- Continuous air barrier — Ch. 36
- Continuous insulation (CI) — Ch. 36
- continuous insulation (CI) — Ch. 9
- continuous work — Ch. 37
- Contract — Ch. 5
- Contract amount — Ch. 34
- contract boundary — Ch. 2
- Contract is the primary source — Ch. 5
- contract markups — Ch. 31
- Contract milestones — Ch. 14
- Contract sum to date — Ch. 32
- Contract the deliverable, not the activity. — Ch. 40
- Contract time — Ch. 1 15 4
- Contract time. — Ch. 11
- Contraction. — Ch. 2
- contractor — Ch. 17 21 4
- Contractor — Ch. 31 4
- Contractor B — Ch. 34
- Contractor loses money on — Ch. 4
- Contractor makes money by — Ch. 4
- Contractor owns the float — Ch. 14
- Contractor soft cost — Ch. 36
- Contractor total — Ch. 36
- Contractor-Controlled Insurance Program — Ch. 5
- Contractor-engaged laboratory. — Ch. 23
- contractor-owned float — Ch. 14
- contractors fail while growing. — Ch. 2
- Contractors pollution liability — Ch. 5
- contractual — Ch. 36 7
- Contractual allocation — Ch. 33
- contractual representation — Ch. 7
- Contributory — Ch. 24
- Control — Ch. 39
- control (contraction) joint — Ch. 8
- control budget — Ch. 13 16
- control of the critical path. — Ch. 13
- Controlled access zones and overhead protection — Ch. 9
- controlling — Ch. 24 3
- Controlling — Ch. 29
- controlling activity — Ch. 18
- Controlling employer — Ch. 24
- controlling employer — Ch. 5
- controlling item — Ch. 38
- controlling path — Ch. 29
- Controls surfacing at commissioning — Ch. 10
- converge or cross — Ch. 38
- converges — Ch. 24
- Conversation 1. — Ch. 41
- Conversation 2. — Ch. 41
- Conversation 3. — Ch. 41
- Convert it. — Ch. 31
- Convert pending changes fast — Ch. 32
- Convert what you can into logic. — Ch. 14
- Conveyor — Ch. 21
- Coordinate the model. Verify the building. — Ch. 35
- Coordination — Ch. 35
- coordination — Ch. 9
- Coordination conflict — Ch. 25
- Coordination drawings / clash detection — Ch. 37
- coordination requirement — Ch. 10
- Coordination requirements — Ch. 17
- coordination with the work of other trades — Ch. 25
- Coordination. — Ch. 8
- Corbin Life Sciences Building — Ch. 40
- Cordova trailer in, unload direct — Ch. 18
- corporate safety manual — Ch. 24
- correcting — Ch. 24 3
- Correcting employer — Ch. 24
- Corrective action — Ch. 23
- Corrective and preventive action — Ch. 23
- Corrective-action closure time — Ch. 24
- Cost — Ch. 20
- cost — Ch. 24
- cost and earned value — Ch. 29
- Cost and schedule impact, and who bears it — Ch. 23
- Cost and time usually run on different clocks. — Ch. 31
- Cost cap — Ch. 39
- cost code — Ch. 28
- cost code structure — Ch. 13
- Cost control — Ch. 28
- Cost control is not accounting. — Ch. 28
- Cost control looks forward and must be timely. — Ch. 28
- Cost control that tells you the truth monthly — Ch. 33
- cost curve — Ch. 32
- cost driver — Ch. 10
- Cost impact. — Ch. 7
- cost incurred — Ch. 30
- Cost incurred to date — Ch. 34
- Cost loading — Ch. 14
- Cost of capital. — Ch. 2 21
- cost of claims, not exposure to hazard. — Ch. 16
- cost of making a change — Ch. 1 6
- Cost of one replacement — Ch. 20
- Cost of the work — Ch. 13 31 4
- cost of the work — Ch. 30
- Cost of work — Ch. 13
- cost of work — Ch. 16
- Cost per SF per use — Ch. 22
- cost per unit — Ch. 38
- Cost per win — Ch. 15
- Cost slope — Ch. 29
- cost slope — Ch. 29
- Cost status against budget — Ch. 26
- Cost to complete — Ch. 28 29
- cost to complete — Ch. 30
- Cost to complete is the only judgment — Ch. 32
- Cost to complete. — Ch. 28
- Cost to date — Ch. 28
- Cost to date outrunning percent complete — Ch. 28
- cost type — Ch. 28
- cost-loaded CPM schedule — Ch. 30
- cost-loaded schedule — Ch. 30
- cost-plus or GMP — Ch. 21
- Cost-plus, fixed fee — Ch. 4
- Cost-to-cost — Ch. 28
- cost-to-cost — Ch. 34
- Cottonwood Creek Bridge Replacement — Ch. 14 2 8
- Count it. — Ch. 18
- count the thing. — Ch. 31
- Count the wasted trips. — Ch. 37
- Count them. — Ch. 14
- coupled — Ch. 22
- Coursing. — Ch. 8
- cover — Ch. 23
- Cover — Ch. 8
- cover board — Ch. 9
- Covered work may be ordered uncovered. — Ch. 23
- CPC — Ch. 42
- CPI — Ch. 30
- CPM — Ch. 1 27 35
- CPM network — Ch. 14
- CPM schedule — Ch. 37
- CR-03 — Ch. 11
- Crane — Ch. 17 18
- Crane and bucket — Ch. 21
- Crane and hoisting approvals — Ch. 17
- Crane and pump demand goes up by 40 percent. — Ch. 22
- Crane and rigging — Ch. 38
- Crane at Pad A — Ch. 18
- Crane at Pad C — Ch. 18
- crane is at Pad A — Ch. 18
- Crane selection — Ch. 8
- Crane-trap sequence conflict — Ch. 35
- Crane/lift on the north side of the footprint — Ch. 17
- Crashing — Ch. 29
- Crashing, in five moves. — Ch. 29
- Crawler crane — Ch. 21
- Created by a person with direct knowledge — Ch. 26
- Created by you — Ch. 26
- Created every single day — Ch. 26
- creating — Ch. 24 3
- Creating employer — Ch. 24
- Credentials, honestly. — Ch. 42
- Credibility — Ch. 41
- credibility-sequencing — Ch. 41
- credit — Ch. 36
- credit instrument — Ch. 5
- Credit the people, publicly. — Ch. 39
- credits — Ch. 31
- Credits money moved to a vendor as progress. — Ch. 28
- crew — Ch. 20
- crew assignment — Ch. 19
- crew continuity as a hard constraint — Ch. 37
- Crew cost per hour — Ch. 12
- crew count — Ch. 37
- Crew flexibility. — Ch. 20
- Crew of 10 per week — Ch. 20
- Crew size and the optimum crew. — Ch. 20
- critical — Ch. 10 29 33
- critical lift — Ch. 21
- critical lighting. — Ch. 9
- Critical or non-critical — Ch. 33
- critical path — Ch. 14 33
- critical path method — Ch. 1
- Critical Path Method (CPM) — Ch. 14
- Critical-path work beats float work — Ch. 18
- critically jurisdiction-dependent — Ch. 5
- cross — Ch. 37
- Cross braces are not a ladder. — Ch. 22
- cross-laminated timber (CLT) — Ch. 8
- Cross-reference — Ch. 26
- Crossline trailer 1 in — Ch. 18
- Crossline trailer 2 in — Ch. 18
- CSI MasterFormat — Ch. 11 13 7
- CSP — Ch. 42
- Cultural and archaeological resources — Ch. 38
- Cumulative — Ch. 26
- cumulative — Ch. 34
- Cumulative (CY) — Ch. 38
- Cumulative cash — Ch. 42
- Cumulative fatigue. — Ch. 24
- Cumulative impact — Ch. 31
- Cumulative impact change order request — Ch. 31
- Curing — Ch. 8
- currency — Ch. 7
- current actual — Ch. 28
- Current assets — Ch. 34
- current assets — Ch. 34
- Current budget — Ch. 28
- Current forecast — Ch. 29
- Current liabilities — Ch. 34
- current liabilities — Ch. 34
- CURRENT PAYMENT DUE — Ch. 32
- Current payment due — Ch. 32
- Current ratio — Ch. 16 34
- curtain wall — Ch. 9
- Curtain wall shop drawings — Ch. 25
- Curtain-wall shop drawings — Ch. 25
- curtain-wall shop-drawing delay — Ch. 9
- Curtis Boone — Ch. 31
- Custom — Ch. 37
- Cutoff walls — Ch. 22
- cutoff walls with an interior pump — Ch. 8
- Cutting and coring — Ch. 16
- CWT — Ch. 12
- cycle — Ch. 22 8
- Cycle — Ch. 8
- Cycle per form set — Ch. 39
- Cycle time — Ch. 21
- cycle time — Ch. 37
- Cycle time and cash are the same variable. — Ch. 37
- Cycle time and rate. — Ch. 37
- cycle time goes up — Ch. 37
- Cycle-based production estimating — Ch. 38
- cycles — Ch. 38
- cynicism — Ch. 41
- D is a gate, not a score — Ch. 39
- D is a gate, not a score. — Ch. 39
- D. Absorb it — Ch. 33
- D. Alcaraz — Ch. 20
- D. Decision linkage — Ch. 39
- daily — Ch. 38
- daily cleanup and the waste stream — Ch. 17
- Daily close-out — Ch. 37
- daily crane pick schedule — Ch. 18
- daily exposure — Ch. 26
- Daily foreman huddle — Ch. 26
- daily inspection procedure — Ch. 22
- Daily progress photography with a protocol. — Ch. 26
- daily quantity report — Ch. 20
- daily report in full — Ch. 26
- Daily reports — Ch. 29
- Daily reports and time entry from the field — Ch. 39
- daily, before the end of each shift — Ch. 18
- Damage — Ch. 23 40
- Damage and cleanup — Ch. 41
- Damage to completed work — Ch. 23
- damage to existing facilities — Ch. 6
- damage waiver — Ch. 21
- damaged by somebody else — Ch. 23
- Damages — Ch. 33
- damages — Ch. 33
- Damages. — Ch. 25
- Dampproofing — Ch. 8
- Dams, levees, flood control — Ch. 38
- Danforth Elementary School — Ch. 21
- DART rate — Ch. 24
- data date — Ch. 29
- date — Ch. 26 31
- date it must be complete — Ch. 23
- date it was performed — Ch. 33
- date the obligation was owed — Ch. 33
- date the physical thing has to be on the site — Ch. 25
- date-stamps the schedule impact — Ch. 9
- Dated event — Ch. 31
- Dated photographs — Ch. 36
- Davis-Bacon Act — Ch. 2 20 38 5
- Day 104 — Ch. 29
- Day 110 — Ch. 29
- Day 130 — Ch. 29
- Day 143 — Ch. 29
- day 201 — Ch. 29
- Day 5 (the required response date). — Ch. 25
- day 53 — Ch. 37
- Day 8. — Ch. 25
- Day 9 and after. — Ch. 25
- days claimed versus days granted — Ch. 31
- days out — Ch. 25
- Days removed from the cycle. — Ch. 37
- Days to weeks — Ch. 36
- DBB — Ch. 3
- DBE / MBE / WBE goals — Ch. 5
- DBE participation. — Ch. 38
- DBIA — Ch. 42
- DDC — Ch. 10
- De minimis — Ch. 24
- Dead shores — Ch. 22
- death or serious physical harm — Ch. 24
- Debrief. — Ch. 15
- Debt to net worth — Ch. 34
- Debt-to-equity — Ch. 16
- Dec Y1 — Ch. 32
- decays — Ch. 36
- Deceleration distance — Ch. 24
- December 11, Year 1 — Ch. 25
- December 12 — Ch. 16
- December 21, Year 1 — Ch. 25
- December 31, Year 1 — Ch. 25
- Decide in the model, in writing, with a date. — Ch. 10
- Decision due — Ch. 37
- decision log — Ch. 26
- decision with a price — Ch. 36
- decision-making — Ch. 31
- decision-manufacturing device — Ch. 26
- decisions — Ch. 26
- decisions first — Ch. 26
- Decisions get made in the room. — Ch. 41
- Decisions required from the owner — Ch. 26
- Decisions required today — Ch. 26
- decisions, commitments, and facts. — Ch. 26
- Deck — Ch. 38
- Declare every deviation in a cover letter — Ch. 25
- Decline — Ch. 15
- declines — Ch. 13
- Decode the scoring matrix, day one. — Ch. 15
- decreasing constraint — Ch. 10
- dedicated limits — Ch. 5
- deductible — Ch. 5
- Deep callback to Chapter 4. — Ch. 38
- Deep callback. — Ch. 3
- Deep subcontracting tiers — Ch. 37
- Deep wells — Ch. 22
- deep wells with submersible pumps — Ch. 8
- default and termination — Ch. 6
- Default to retained logic — Ch. 29
- defect — Ch. 16
- Defects and rework — Ch. 27
- deferred seasonal test — Ch. 40
- deferred seasonal test plan — Ch. 40
- deferred submittal — Ch. 10 25
- defined scope — Ch. 4
- defined term — Ch. 33
- defined terms — Ch. 24
- deflect under its own weight — Ch. 22
- Degraded housekeeping. — Ch. 24
- Del Ferraro — Ch. 14 38
- delay — Ch. 16 25
- Delay — Ch. 6
- Delay / time extension — Ch. 4
- Delay is not proportional to lateness. — Ch. 29
- Delays and impacts — Ch. 29
- delegated design — Ch. 25 35
- delegated design responsibility — Ch. 10
- Delegation and hard conversations — Ch. 42
- Delegation is the only way people learn to manage — Ch. 41
- Delete — Ch. 31
- Deliveries received — Ch. 26
- delivery and installation — Ch. 40
- Delivery and offload — Ch. 16
- Delivery and receiving tickets — Ch. 26
- Demand is durable. — Ch. 42
- demand lumpiness. — Ch. 2
- Demolition permit — Ch. 17
- Demolition robot — Ch. 39
- denied or unanswered — Ch. 33
- denied, or unreasonably deferred — Ch. 29
- density gauge behind the rollers in real time — Ch. 38
- Depreciation. — Ch. 21
- derived demand — Ch. 2
- Description of the nonconformance — Ch. 23
- design — Ch. 40
- design and price together — Ch. 15
- Design and supervision. — Ch. 22
- Design completeness — Ch. 11
- Design contingency — Ch. 11
- Design contingency is not carried. — Ch. 11
- Design error or omission — Ch. 31 6
- Design errors and omissions — Ch. 33
- Design firm / CM agency / consultancy — Ch. 42
- Design freeze far earlier than normal — Ch. 39
- Design information — Ch. 27
- design intent and documentation — Ch. 36
- Design model — Ch. 35
- design phase — Ch. 35
- design problem to solve now — Ch. 11
- design problem with constraints — Ch. 17
- Design professional, in writing — Ch. 23
- Design team field observation — Ch. 23
- design to the estimate — Ch. 11
- Design-assist engagement for facades and MEP. — Ch. 25
- design-bid-build — Ch. 11 3 5
- Design-Bid-Build — Ch. 3
- Design-bid-build — Ch. 3
- Design-bid-build (DBB) — Ch. 3
- Design-bid-build, lump sum. 425 calendar days. — Ch. 3
- Design-build — Ch. 15 3
- Design-Build — Ch. 3
- design-build — Ch. 3 5 7
- Design-build (DB) — Ch. 3
- design-build-operate-maintain (DBOM) — Ch. 3
- Design-build. — Ch. 15
- Design-builder — Ch. 3
- design-builder — Ch. 3
- Design-mix formulas — Ch. 25
- design-team review time — Ch. 17
- designed — Ch. 22
- designed by a qualified person — Ch. 22
- designed, shop-drawn, submitted system — Ch. 9
- designers — Ch. 24
- Destination — Ch. 18
- Destination. — Ch. 18
- detail — Ch. 14
- Detail — Ch. 7
- Details, thresholds, and timelines vary by state. — Ch. 17
- Detection — Ch. 23
- determination against criteria — Ch. 40
- developer — Ch. 2
- Development length — Ch. 8
- deviations — Ch. 25
- device-by-device functional test — Ch. 10
- Dewatering — Ch. 38
- dewatering runs 24 hours a day — Ch. 8
- Dewatering shut-off — Ch. 22
- Dewatering. — Ch. 15
- diagnostic instrument — Ch. 41
- Diagram (described). — Ch. 1 10 11 12 13 14 15 17 27 3 30 33 34 4 6 9
- did — Ch. 7
- did not remove too early. — Ch. 22
- Difference — Ch. 29 32 37 38
- Difference in processing alone — Ch. 23
- different business — Ch. 37
- Different incentives — Ch. 41
- different measurements. — Ch. 36
- different notice and claim deadlines. — Ch. 2
- Differing / concealed site conditions — Ch. 6
- Differing site condition — Ch. 31
- differing site condition — Ch. 8
- differing site conditions — Ch. 38 4 5
- Differing site conditions — Ch. 38 4 6
- Differing site conditions (DSC) — Ch. 33
- Differing site conditions clause — Ch. 38
- differing site conditions clause — Ch. 4
- Differing site conditions. — Ch. 38
- diffusion of responsibility — Ch. 26
- digital twin — Ch. 35
- Dilution of supervision — Ch. 19 31
- Dimension lumber — Ch. 8
- Dimensional accuracy at the interfaces — Ch. 39
- dimensions — Ch. 25
- Direct chute from the truck — Ch. 21
- Direct cost — Ch. 13 22
- direct cost — Ch. 31
- Direct cost carried — Ch. 18
- Direct cost claimed — Ch. 38
- Direct cost of a two-week enclosure slip — Ch. 9
- Direct cost of six hours — Ch. 21
- Direct cost of the work — Ch. 4
- DIRECT COST OF WORK — Ch. 11
- Direct costs — Ch. 12
- Direct hard cost — Ch. 36
- Direct hire. — Ch. 20
- direct schedule obligation to Kestrel — Ch. 40
- Direct subtotal — Ch. 35 36 41
- Direct work — Ch. 20
- direct-fired — Ch. 22
- Direct-to-install beats laydown. — Ch. 18
- Directed acceleration — Ch. 29
- Directed work — Ch. 31
- Directing work verbally to avoid a paper trail. — Ch. 31
- Direction requested. — Ch. 26
- Direction that adds scope — Ch. 25
- directional — Ch. 23
- directive — Ch. 7
- Directives received, including verbal ones — Ch. 26
- Disadvantaged Business Enterprise — Ch. 38
- Disallowed — Ch. 32
- disclaimer — Ch. 38
- Discovery scope — Ch. 33
- discrete — Ch. 29
- Dismantling. — Ch. 21
- Displaced Burden — Ch. 39
- disposition — Ch. 23
- Dispute — Ch. 33
- Dispute resolution — Ch. 16 4
- Dispute Review Board — Ch. 5
- dispute review board (DRB) — Ch. 33
- Disruption — Ch. 33
- Disruption makes the work less efficient — Ch. 33
- Distribute daily, by subcontractor. — Ch. 40
- Distributed by trade — Ch. 27
- distributed, undocumented knowledge — Ch. 41
- distribution — Ch. 10 38
- distribution. — Ch. 35
- division — Ch. 28
- Division 01 — Ch. 15
- division and section title — Ch. 23
- Do not — Ch. 23
- do not — Ch. 25
- Do not adjudicate it in the field. — Ch. 19
- Do not build a bulletin. — Ch. 7
- Do not build new structure. — Ch. 36
- Do not cost-load every activity. — Ch. 30
- Do not let it get deleted quietly. — Ch. 4
- Do not lose it. — Ch. 40
- Do not make a commitment you do not control. — Ch. 41
- do not memorize point values, look them up — Ch. 36
- Do not memorize section numbers. — Ch. 7
- Do not pretend to precision. — Ch. 11
- Do not quote a single ratio as fact. — Ch. 24
- Do not stack acceleration on acceleration. — Ch. 41
- Do not use the number from your last job — Ch. 22
- Do not use them as prices or promises. — Ch. 11
- Do not use. — Ch. 22
- Do not write legal conclusions. — Ch. 25
- Do not write speculation or blame. — Ch. 25
- Do that section before you read its answers — Ch. 42
- Do the arithmetic before you decide — Ch. 33
- document — Ch. 26
- Document — Ch. 38
- Document A says — Ch. 7
- Document availability — Ch. 15
- Document B says — Ch. 7
- Document causation in real time. — Ch. 19
- Document control — Ch. 25
- Document management. — Ch. 17
- Document review — Ch. 24
- Document review and comparison — Ch. 39
- document type — Ch. 26
- document why — Ch. 14
- Document-control procedure — Ch. 17
- document-control setup — Ch. 7
- documentation — Ch. 7
- Documentation and records — Ch. 23
- Documentation discipline — Ch. 39
- documentation is the memory of the project — Ch. 26 7
- Documentation is the memory of the project — Ch. 40
- Documentation of the actual condition — Ch. 38
- documentation or procurement — Ch. 36
- documentation outcome. — Ch. 33
- Documented failure to cure — Ch. 19
- Documents and the job trailer — Ch. 40
- Documents. — Ch. 11
- does — Ch. 3 5
- does not — Ch. 5
- does not comply — Ch. 36
- does not contain a dollar sign. — Ch. 29
- Does not prove causation. — Ch. 33
- does not solve the problem — Ch. 10
- does the unit price include overhead and profit — Ch. 4
- dollar consequence — Ch. 7
- dollar exposure — Ch. 4
- dollar for dollar — Ch. 28
- Dollars, not days. — Ch. 30
- Domestic water. — Ch. 10
- door closers — Ch. 7
- door leaves — Ch. 7
- Doors, frames, hardware — Ch. 9
- Double handling — Ch. 18
- Double-bought. — Ch. 16
- down — Ch. 11
- downside is capped by nothing. — Ch. 15
- downward from the anchorage point — Ch. 24
- downward slope — Ch. 34
- drainage — Ch. 9
- Drains and overflows. — Ch. 9
- drawing field — Ch. 7
- Drawings — Ch. 4 7
- draws — Ch. 37
- DRB / standing neutral — Ch. 33
- dried-in — Ch. 8
- Dried-in is a certification, not a date. — Ch. 9
- Dried-in is not additive. It is a gate. — Ch. 9
- Drilled shafts — Ch. 38
- Drilled shafts (caissons) — Ch. 8
- drinking water — Ch. 18
- Driven piles — Ch. 38 8
- Drone earthwork volume — Ch. 39
- Drone photogrammetric surface — Ch. 39
- Drone progress and inspection — Ch. 39
- Dry-in flashing — Ch. 37
- dry-pipe system — Ch. 10
- Drywall finishing and painting robots — Ch. 39
- Drywall hang, tape, finish — Ch. 9
- DSC — Ch. 38
- DSC settlement — Ch. 38
- Duct — Ch. 35
- Duct and pipe insulation and sealing — Ch. 36
- duct leakage test — Ch. 10 37
- due Friday 11/21. — Ch. 26
- Dumpsters — Ch. 17
- Duration — Ch. 21
- Duration and logic at the activity level — Ch. 27
- during and after — Ch. 23 24
- during design — Ch. 11
- Dust and dirt. — Ch. 18
- Dust control — Ch. 37
- Dust, noise, and vibration monitoring. — Ch. 17
- Dust, noise, work hours — Ch. 5
- duties — Ch. 42
- dynamic water penetration — Ch. 9
- E 32 — Ch. 14
- E-4 — Ch. 7
- E-Verify — Ch. 5
- each one — Ch. 41
- Each one as its final inspection passes — Ch. 40
- earlier — Ch. 14
- Earlier warning. — Ch. 32
- earliest — Ch. 3
- early — Ch. 23
- early release provision — Ch. 32
- Early, documented utility coordination — Ch. 38
- early, with options. — Ch. 42
- early-completion schedule — Ch. 4
- early-warning thresholds — Ch. 19
- Earned man-hours — Ch. 20
- earned schedule — Ch. 30
- Earned schedule (ES) — Ch. 30
- Earned value (EV) — Ch. 30
- Earned value is measured at budget rates. — Ch. 30
- Earthwork moisture — Ch. 38
- Earthwork volume by photogrammetric survey — Ch. 39
- economics of the callback. — Ch. 37
- Eductor (ejector) systems — Ch. 22
- effective rate — Ch. 20
- Effective rate — Ch. 5
- effective stress — Ch. 22
- Efficiency factor — Ch. 21
- efficiency loss — Ch. 20
- egress — Ch. 8
- Eichleay — Ch. 33
- EIFS — Ch. 9
- eight calendar days — Ch. 29
- Eight calendar days of enclosure float — Ch. 35
- eight to fourteen months — Ch. 9
- EJCDC — Ch. 4
- elapsed time — Ch. 23
- elapsed-time (zero-based) convention — Ch. 14
- Electric equipment — Ch. 21
- electrical — Ch. 10
- Electrical — Ch. 35
- electrical buyout date — Ch. 17
- Electrical clearance. — Ch. 22
- electrical permit — Ch. 17
- electrical rough-in — Ch. 24
- Electrical service grows. — Ch. 36
- Electrical. — Ch. 36
- Electrocution — Ch. 24
- Element A — Ch. 12
- Element B — Ch. 12
- elemental/UniFormat — Ch. 11
- Elevated slab on metal deck — Ch. 12
- Elevation — Ch. 7
- elevation 1,243 — Ch. 38
- elevator machine-room or hoistway equipment — Ch. 11
- Elevator permits and inspections — Ch. 17
- eleven — Ch. 40
- eleven days — Ch. 10 26 29 41
- eleven days instead of the planned five — Ch. 25
- eleven feet six inches. — Ch. 35
- eleven houses in process — Ch. 37
- eleven houses in process at all times — Ch. 37
- eleven logged decisions in forty minutes — Ch. 26
- Eleven miles. — Ch. 36
- eleven months — Ch. 38
- Eliminate the height. — Ch. 24
- Elimination — Ch. 24
- elimination — Ch. 24
- elimination or substitution — Ch. 24
- Email — Ch. 26
- Embodied carbon — Ch. 36
- emergency — Ch. 10
- emergency action plan — Ch. 17
- Emergency action plan — Ch. 24
- Emergency power system testing — Ch. 40
- Emergency response degradation. — Ch. 24
- Emissions tiers. — Ch. 21
- Emotionally invested — Ch. 37
- Emphasis Program — Ch. 24
- employee — Ch. 20 5
- Employee interviews — Ch. 24
- employer — Ch. 5
- empty — Ch. 21
- EMR. — Ch. 24
- EMV is a portfolio number, not a project number. — Ch. 6
- enabling costs — Ch. 29
- enclosure date — Ch. 18
- end dams — Ch. 9
- Endangered species — Ch. 5
- endorsement attached to the policy. — Ch. 5
- endorsement to the policy — Ch. 5
- endorsements — Ch. 5
- Energized work and arc flash. — Ch. 10 24
- Energy and Atmosphere — Ch. 36
- Energy and renewables — Ch. 38
- Energy code — Ch. 36
- Energy code compliance is not a premium. — Ch. 36
- energy model — Ch. 36
- ENERGY STAR — Ch. 36
- enforceability is highly jurisdiction-dependent — Ch. 33
- engaged and paid by the contractor — Ch. 7
- Engineered lumber — Ch. 8
- Engineered lumber (LVL, PSL, glulam) — Ch. 37
- engineered suspended-scaffold design — Ch. 24
- engineered-to-order — Ch. 16
- Engineering — Ch. 24
- Engineering News-Record (ENR) — Ch. 11
- engineering survey by a competent person — Ch. 22
- Enhanced commissioning — Ch. 40
- Enhanced flush-out or contaminant testing — Ch. 36
- Enormous. — Ch. 20
- entire — Ch. 23
- entirely within your control. — Ch. 18
- Entitlement — Ch. 33
- entitlement gate — Ch. 33
- Entitlement. — Ch. 25 33
- Envelope consultant — Ch. 23
- Environment and administration — Ch. 22
- Environmental and historic review — Ch. 17
- Environmental monitoring — Ch. 39
- environmental product declaration — Ch. 36
- Environmental Product Declaration (EPD) — Ch. 36
- Envision — Ch. 36
- EPD for the specific mix from the specific plant. — Ch. 36
- EPDM — Ch. 9
- equipment — Ch. 10
- Equipment — Ch. 27 31
- equipment and its production rate — Ch. 38
- Equipment and tools off site — Ch. 40
- Equipment available — Ch. 27
- Equipment by unit number — Ch. 26
- Equipment is time-based. — Ch. 12
- Equipment list and asset data — Ch. 40
- equipment operating near energized lines — Ch. 24
- Equipment records — Ch. 26
- Equipment telematics — Ch. 39
- Equipment. — Ch. 26
- Erected tonnage — Ch. 12
- Erection is fast and crane-dependent — Ch. 36
- erection sequence drawing — Ch. 22
- Erection. — Ch. 21
- Erosion and sedimentation control — Ch. 36
- Erosion of the last hour. — Ch. 24
- Error and rework rise — Ch. 20
- errors or omissions — Ch. 25
- errors partially cancel — Ch. 11
- escalate — Ch. 27
- Escalate only un-bought scope. — Ch. 11
- Escalate RFI 221 by phone, — Ch. 27
- Escalate to the midpoint — Ch. 11
- Escalate today if two or more are true — Ch. 41
- Escalated — Ch. 27 35
- Escalation — Ch. 11 13 18 33 6
- escalation — Ch. 12 2
- Escalation allowance — Ch. 13 6
- escalation allowance — Ch. 6
- Escalation forgotten — Ch. 12
- Escalation is a named line, not a gamble. — Ch. 3
- Escalation to midpoint of construction — Ch. 11
- Escalation. — Ch. 11 25
- Escrowed retention — Ch. 32
- essential electrical system — Ch. 10
- Estimate reconciliation — Ch. 11
- Estimate the trade yourself, in detail — Ch. 13
- Estimate to complete (ETC) — Ch. 30
- Estimate. — Ch. 35
- Estimated cost total — Ch. 4
- Estimated gross profit — Ch. 34
- estimated gross profit — Ch. 34
- estimated gross profit percentage — Ch. 34
- Estimated scrap value to the thief — Ch. 18
- Estimated total (no cap) — Ch. 4
- Estimating — Ch. 42
- Estimating contingency — Ch. 6
- estimating contingency — Ch. 6
- Estimating judgment — Ch. 39
- estimating miss — Ch. 40
- Estimating support and historical cost analysis — Ch. 39
- ETC — Ch. 30
- EV charging. — Ch. 36
- Evaluation — Ch. 15
- Even flow is the central discipline. — Ch. 37
- event — Ch. 6
- Event and date. — Ch. 31
- Events, in the order they happened. — Ch. 26
- every — Ch. 15 23 24 27
- Every — Ch. 17 23
- Every accrual reverses automatically — Ch. 28
- Every action item has a name and a date — Ch. 41
- Every addendum — Ch. 15
- every constraint on it has been removed — Ch. 29
- Every curb, sleeve, and penetration DONE. Once. — Ch. 27
- every eight and a half days — Ch. 37
- every finding gets a name and a date — Ch. 40
- Every layer has a different base. — Ch. 13
- Every miss gets a reason — Ch. 27
- every number needs a unit and a measure. — Ch. 8
- Every one of those is real work with real cost. — Ch. 38
- Every package has a named human being. — Ch. 16
- Every project is a prototype. — Ch. 27
- Every reason gets a category — Ch. 27
- Every scaffold on the job has an owner — Ch. 22
- every scope gap between trade contracts. — Ch. 3
- every single week — Ch. 38
- every tier — Ch. 40
- Every trade models its own work. — Ch. 10
- Every unresolved item comes due at once — Ch. 32
- Every weight ticket — Ch. 36
- every year, forever — Ch. 37
- Everybody could have predicted the sign. — Ch. 29
- Everybody, already. — Ch. 39
- Everything else — Ch. 2 36
- evidence of insurance — Ch. 16
- exactly — Ch. 26 32
- exactly 37 cubic yards — Ch. 12
- Exactly one current set — Ch. 25
- exactly the same profit. — Ch. 34
- Exactly what happens. — Ch. 41
- exam-room pod — Ch. 27
- excavation — Ch. 24
- Excavation and trench collapse — Ch. 38
- excavation and trenching — Ch. 10
- excavation support is usually a delegated design. — Ch. 8
- Excavation support removal — Ch. 22
- Excavation with slopes and shoring — Ch. 35
- excavator — Ch. 38
- exceptions only — Ch. 26
- exclude — Ch. 22
- excludes — Ch. 23
- Exclusion documentation — Ch. 36
- Exclusions — Ch. 15
- Exclusions. — Ch. 11
- exclusive remedy — Ch. 4 5
- Excusable — Ch. 29
- Excusable and compensable — Ch. 29 33
- excusable and compensable — Ch. 31 33
- Excusable and compensable. — Ch. 29
- excusable but non-compensable — Ch. 18
- excusable but not established — Ch. 31
- excusable delay — Ch. 29 6
- Excusable delay — Ch. 33
- Excusable or non-excusable — Ch. 33
- Excusable, non-compensable — Ch. 29
- Excusable, non-compensable. — Ch. 29
- Executed wk 32 — Ch. 31
- Executive escalation — Ch. 5
- Executive negotiation — Ch. 33
- Exhibit A to an executed contract — Ch. 16
- Existing utilities. — Ch. 15
- Existing utility records are frequently wrong — Ch. 38
- Exoskeleton — Ch. 39
- expected — Ch. 14
- expected losses — Ch. 24
- Expected monetary value (EMV) — Ch. 6
- experience modification factor — Ch. 20
- experience modification rate (EMR) — Ch. 12 16 2 24 42
- explain what they cannot tell you. — Ch. 24
- explicit and public — Ch. 41
- Explicit cold-weather language — Ch. 13
- explicitly who pays and who benefits. — Ch. 39
- Exploit — Ch. 6
- exposing — Ch. 24 3
- Exposing employer — Ch. 24
- express — Ch. 37
- Extend hoist hours. — Ch. 18
- extended field overhead — Ch. 33
- extended general conditions — Ch. 33
- extended general-conditions daily rate — Ch. 4
- extending — Ch. 20
- exterior finish — Ch. 37
- External failure — Ch. 23
- extra work — Ch. 38
- F (36) — Ch. 14
- F (6) — Ch. 14
- F (EF 69), I (EF 73) — Ch. 14
- F has free float of 4. — Ch. 14
- F is enormous. — Ch. 14
- F-4 formwork. — Ch. 12
- fabrication — Ch. 39
- fabrication duration — Ch. 17
- Fabrication is digital and precise — Ch. 36
- Fabrication model — Ch. 35
- fabrication processes — Ch. 25
- fabrication-level — Ch. 39
- fabrication-release milestone tied to sign-off — Ch. 10
- face-sealed — Ch. 9
- Facilities and services subtotal — Ch. 13
- Fact — Ch. 28
- Fact. — Ch. 26
- Factories need continuous volume — Ch. 39
- Factory conditions. — Ch. 39
- facts, decisions, and commitments — Ch. 26
- Factual description — Ch. 31
- Fade — Ch. 34
- Fade is a measure of self-knowledge. — Ch. 34
- fade is not the same as a loss. — Ch. 34
- failed enclosure water test requiring rework — Ch. 9
- failed later — Ch. 23
- fails badly with an immature team — Ch. 3
- Fails to grasp trade leverage the other way. — Ch. 37
- Fails to grasp trade leverage. — Ch. 37
- failure — Ch. 21
- Failure to abate — Ch. 24
- Failure to mitigate — Ch. 33
- Failures live at transitions, — Ch. 9
- Fair Oaks Water Plant Expansion — Ch. 22
- Fall and falling-object protection — Ch. 22
- Fall detection — Ch. 39
- Fall protection. — Ch. 22
- Fall-protection anchorage design — Ch. 25
- Falls — Ch. 24
- Falls. — Ch. 36
- false positive — Ch. 35
- Fan coil units — Ch. 10
- fast cost feedback during design — Ch. 35
- fast to climb it — Ch. 41
- Fastest — Ch. 22
- Fatality or catastrophe — Ch. 24
- feasible means of abatement — Ch. 24
- Feb 16, Year 2 — Ch. 10
- February 10, Year 2 — Ch. 16 25
- February 16, Year 2 — Ch. 10
- February 20, Year 1 — Ch. 25
- February 22, Year 2 — Ch. 16
- February 24, Year 2 — Ch. 25
- Federal work. — Ch. 30
- Fee — Ch. 13
- fee and contingency are percentages — Ch. 12
- fee is not auditable — Ch. 13
- Fee net of overhead — Ch. 2
- Fee with incentive — Ch. 4
- feedback interval. — Ch. 42
- Feeders — Ch. 10
- Fencing with privacy screen — Ch. 18
- Fenestration performance — Ch. 36
- fewer — Ch. 24
- Fewer claims. — Ch. 32
- fewer coverage disputes — Ch. 5
- FIDIC — Ch. 4
- field adhesion testing — Ch. 9
- Field air/water test with chamber — Ch. 9
- Field engineer — Ch. 1
- Field engineer / project engineer (PE) — Ch. 42
- field ladder — Ch. 42
- Field management platforms — Ch. 39
- Field modification without engineering review — Ch. 22
- Field operations executive — Ch. 42
- Field order / minor change in the work — Ch. 31
- Field Quality Control — Ch. 7
- field quality control — Ch. 7
- Field resolution — Ch. 5
- Field time cards — Ch. 28
- Field water test (spray rack / calibrated nozzle) — Ch. 9
- field-cured — Ch. 22 23
- field-cured cylinders — Ch. 22 23
- Field-level — Ch. 33
- Fieldwire — Ch. 39
- fifteen to twenty times — Ch. 34
- Figured dimensions govern over scaled dimensions. — Ch. 7
- File this as document 3 in your project notebook. — Ch. 3
- Fill factor — Ch. 21
- Filtration. — Ch. 10
- Final — Ch. 32 5
- final certificate of occupancy — Ch. 40
- Final cleaning — Ch. 40
- Final completion — Ch. 4 40
- FINAL COMPLETION — Ch. 40
- final completion and final payment — Ch. 40
- final completion November 17. — Ch. 40
- Final paint — Ch. 9
- final paint — Ch. 9
- Final paint. — Ch. 9
- Final payment — Ch. 40
- Final review meeting — Ch. 13
- Final unconditional lien waivers — Ch. 40
- Finality — Ch. 33
- Finance costs and interest — Ch. 33
- Finance the principal — Ch. 5
- Financial disclosure in prequalification. — Ch. 34
- Financial health — Ch. 13
- Financing activities — Ch. 34
- Financing and appraisal. — Ch. 37
- Financing and lending follow site progress — Ch. 39
- Find it in warranty — Ch. 23
- Find out immediately — Ch. 40
- find yours. — Ch. 26
- finding savings. — Ch. 13
- Finding the longest path. — Ch. 27
- finish — Ch. 27
- Finish and color are a mockup issue. — Ch. 9
- Finish is structure — Ch. 36
- Finish No Earlier Than (FNET) — Ch. 14
- Finish No Later Than (FNLT) — Ch. 14
- Finish-to-Finish — Ch. 14
- Finish-to-Start — Ch. 14
- Finishing — Ch. 37
- Fire alarm — Ch. 10
- Fire alarm final acceptance test — Ch. 40
- Fire and code. — Ch. 8
- fire lane only — Ch. 18
- Fire lanes — Ch. 17
- fire marshal — Ch. 10
- Fire marshal — Ch. 23
- Fire marshal life-safety final walk — Ch. 40
- Fire marshal review — Ch. 17
- Fire performance is engineered, not intuitive — Ch. 36
- fire protection — Ch. 10
- Fire pumps — Ch. 10
- fire-rated assembly — Ch. 9
- Fireproofing — Ch. 8
- firestop management plan — Ch. 9
- Firestopping — Ch. 13
- firestopping inspection failure at a hold point — Ch. 9
- Firestopping of penetrations — Ch. 16
- First — Ch. 37 41
- first — Ch. 7
- First call on manpower. — Ch. 32
- First placement. — Ch. 25
- first real installation in the actual building — Ch. 23
- first wind-driven rain — Ch. 9
- First, calibrate what you came in believing. — Ch. 36
- First, cash flow. — Ch. 17
- First, incentive. — Ch. 33
- First, it is the one risk you cannot transfer. — Ch. 6
- First, presence. — Ch. 24
- First, price doing nothing — Ch. 24
- First, the drawings lie by omission. — Ch. 9
- First, the labor column is the money column. — Ch. 22
- First, the owner is usually a public agency. — Ch. 38
- First, the premium, computed correctly. — Ch. 20
- First, the trap. — Ch. 1
- First, there is no overtime premium in it at all. — Ch. 20
- First, verify the sub is right — Ch. 31
- First, wet-film thickness — Ch. 9
- five days — Ch. 37
- five days ahead of the computed latest date — Ch. 25
- five days of float on a thirty-eight-week chain. — Ch. 9
- Five gate questions. — Ch. 39
- five houses — Ch. 37
- Five things to carry out of this chapter. — Ch. 30
- Five ways work gets bought. — Ch. 15
- five weeks — Ch. 10 26
- five weeks later — Ch. 39
- five whys — Ch. 24
- five-plus years. — Ch. 9
- five-week lead time — Ch. 7
- Five. — Ch. 32
- Fix it now — Ch. 23
- Fixed — Ch. 38
- fixed cost — Ch. 38
- fixed cure duration — Ch. 39
- Fixed fee — Ch. 4
- Fixed formula 0/100 — Ch. 30
- Fixed formula 25/75 — Ch. 30
- Fixed formula 50/50 — Ch. 30
- Fixed subtotal — Ch. 21
- fixed-cost recovery — Ch. 38
- flag any whose award-by date has already passed — Ch. 25
- flat dollars per person — Ch. 20
- flatness and levelness (F-numbers). — Ch. 8
- Flexibility it gives the designer — Ch. 36
- float — Ch. 33
- Float being consumed silently. — Ch. 29
- Float belongs to the network — Ch. 27
- Float belongs to the project — Ch. 14
- Float erosion. — Ch. 30
- float is finite and somebody just spent it. — Ch. 29
- Float is not the same thing as delay. — Ch. 33
- Float preserved — Ch. 39
- Float trend by path, six updates deep. — Ch. 29
- Float, logic, and the critical path. — Ch. 30
- floats — Ch. 22
- Floor and roof openings. — Ch. 24
- floor benchmark — Ch. 18
- floor loading — Ch. 21
- Floor trusses / engineered I-joists — Ch. 37
- Flooring — Ch. 9
- flow — Ch. 27
- Flow-down — Ch. 19 4
- Flow-down (incorporation by reference) — Ch. 16
- Flush-out — Ch. 36
- Flush-out versus air testing. — Ch. 36
- Flying / table forms — Ch. 22
- flying shores — Ch. 22
- Focus Four — Ch. 18 2 22 24 8
- Folder structure — Ch. 26
- Follow-up — Ch. 24
- following trade — Ch. 8
- following trade waiting on it. — Ch. 8
- Footing inspection before pour — Ch. 37
- Footings and pile caps — Ch. 38
- for information only — Ch. 38
- for one worker, for one week. — Ch. 20
- for the same scope — Ch. 13
- Force account — Ch. 38
- force account — Ch. 38
- Force account records — Ch. 26
- Force account tickets signed daily — Ch. 38
- Force majeure — Ch. 6
- Force majeure / excusable delay — Ch. 6
- Force majeure in supply contracts. — Ch. 16
- Forces the date regardless of logic — Ch. 14
- forecast — Ch. 11
- Forecast at completion — Ch. 28
- Forecast at completion. — Ch. 28
- Forecast completion versus contract. — Ch. 29
- Forecast cost of the work remaining — Ch. 28
- Forecast equals budget on most lines — Ch. 28
- Forecasting — Ch. 42
- Foreman — Ch. 20 42
- foreman — Ch. 26
- Foreman check-in at day 1, day 3, and day 10. — Ch. 24
- foreman quit — Ch. 1
- foremen and detailers both present — Ch. 35
- forensic and expert-witness work — Ch. 42
- forensic schedule analysis — Ch. 29
- Foreseeable rework and disruption — Ch. 29
- Forklift (rough terrain or warehouse) — Ch. 21
- Form and delivery — Ch. 33
- form cycle — Ch. 9
- Form I-9 — Ch. 5
- Form rental / ownership time — Ch. 39
- Formal document control — Ch. 37
- Formal letter — Ch. 26
- Format. — Ch. 10
- Formula-based approaches exist. — Ch. 33
- Formwork contact area — Ch. 35
- forty to seventy-five days — Ch. 32
- forty-one feet above — Ch. 38
- forward pass — Ch. 14
- Forward pass from the data date, day 150. — Ch. 29
- found after turnover — Ch. 23
- Found at ceiling close — Ch. 39
- found before turnover — Ch. 23
- Found by scan, before MEP — Ch. 39
- Found in the field, after duct is hung — Ch. 39
- Foundation and base — Ch. 22
- Foundation drainage — Ch. 8
- Foundation walls — Ch. 8
- foundation-wall sleeves and core drilling — Ch. 16
- Foundation. — Ch. 21 22
- four — Ch. 14
- four days — Ch. 37
- four days, not six. — Ch. 14
- Four failure modes. — Ch. 39
- Four knockouts override the score entirely. — Ch. 15
- Four months. — Ch. 35
- Four problems. — Ch. 22
- Four questions. — Ch. 36
- Four remedies, four payers. — Ch. 40
- Four sentences worth memorizing — Ch. 5
- four times its minimum base width — Ch. 22
- four weeks — Ch. 25
- Four-way rough — Ch. 37
- four-week rolling average — Ch. 19
- Four. — Ch. 17 32 39
- fourteen days — Ch. 10
- fourteen feet eight inches — Ch. 35
- fourteen months after finishing its work — Ch. 32
- fourteen-day — Ch. 26
- fourteen-point schedule assessment — Ch. 14
- Fourth, consider an interim payment — Ch. 31
- fraction — Ch. 36
- fragmented — Ch. 2 42
- fragmented, one-off, low-margin, outdoor — Ch. 39
- fragnet — Ch. 14 29 31
- Frame (fabricated frame) — Ch. 22
- frame a diagnosis in the field. — Ch. 20
- frames — Ch. 7
- Frank Petrosyan — Ch. 1
- Fraud. — Ch. 4
- free — Ch. 14
- Free fall distance — Ch. 24
- free float — Ch. 14
- Free float (FF) — Ch. 14
- Free haul and overhaul. — Ch. 38
- free haul distance — Ch. 38
- freestanding hammerhead tower crane — Ch. 21
- Freight is a line, not an assumption. — Ch. 12
- Freight terms — Ch. 16
- Frequently rejected — Ch. 33
- Friday, April 3, Year 2. — Ch. 27
- Friday, September 5 — Ch. 32
- fringe benefit rate. — Ch. 20
- From Chapter 21. — Ch. 38
- From Chapter 37. — Ch. 38
- from the data date — Ch. 29
- from the fabrication model — Ch. 35
- From the field. — Ch. 1 10 11 12 13 14 15 16 17 18 19 2 20 21 22 23 24 25 26 27 28 29 3 30 31 32 33 35 36 38 39 4 40 41 42 5 6 7 8 9
- Front-loaded schedules of values. — Ch. 30
- front-loaded. — Ch. 3
- Front-loading — Ch. 13 32 4
- front-loading — Ch. 17
- front-loading the schedule of values — Ch. 4
- front-loading the SOV directly inflates EV. — Ch. 30
- Frost laws / seasonal load restrictions — Ch. 38
- Fuel — Ch. 21
- Fuel management — Ch. 18
- full conformance — Ch. 23
- full liquid head — Ch. 22
- full liquid head as the absolute ceiling — Ch. 22
- fully adhered 60-mil TPO — Ch. 9
- FULLY BURDENED HOURLY COST — Ch. 12
- FULLY BURDENED RATE — Ch. 20
- function — Ch. 38
- function analysis — Ch. 11
- Functional concurrency — Ch. 33
- Functional performance testing — Ch. 36 40
- Functional performance testing (FPT) — Ch. 40
- Furnish as corrected — Ch. 25
- furnish/install seams live here — Ch. 7
- FUTA has a low annual wage cap — Ch. 12
- G-series rated-assembly schedule — Ch. 7
- Gain — Ch. 34
- Gain to the unbalanced bidder — Ch. 15
- Ganged wall forms — Ch. 22
- Gantt chart — Ch. 14
- gap — Ch. 23
- Gap. — Ch. 16
- Garbage in is worse here than usual — Ch. 39
- Garbage in, cinematic garbage out. — Ch. 35
- gates — Ch. 9
- gates the order quantity — Ch. 27
- General and supplementary conditions — Ch. 15
- general conditions — Ch. 1
- General conditions — Ch. 12 13 4 7
- general conditions (GC) — Ch. 9
- general conditions are a rate, not a quantity. — Ch. 31
- general contractor — Ch. 1
- General Duty Clause — Ch. 24
- General foreman — Ch. 20 42
- general indemnity agreement — Ch. 15
- General Indemnity Agreement — Ch. 5
- General Indemnity Agreement (GIA) — Ch. 5
- General requirements — Ch. 12
- General Requirements — Ch. 7
- General superintendent — Ch. 42
- general supervisory authority — Ch. 24
- Generate at least four options — Ch. 10
- Genuine design comment — Ch. 25
- genuine early costs belong in early line items. — Ch. 13
- Genuine stability. — Ch. 29
- genuine structural cost advantage — Ch. 2
- geography — Ch. 15
- Geotechnical and existing-conditions reports — Ch. 15
- geotechnical baseline report (GBR) — Ch. 38
- geotechnical report — Ch. 38 7 8
- Get advice immediately — Ch. 33
- get the terms in writing first — Ch. 40
- Get the two parties in a room, with you in it. — Ch. 40
- girder fabrication — Ch. 14
- Girders — Ch. 38
- Give credit publicly, absorb blame publicly. — Ch. 41
- Give folder 13 its own life. — Ch. 26
- Give notice of time impact separately — Ch. 31
- give notice on time — Ch. 14
- Give notice. — Ch. 41
- Given — Ch. 31
- given a win — Ch. 15
- Glenn Ballard — Ch. 27
- glue-laminated timber (glulam) — Ch. 8
- GMP — Ch. 13 3 4
- GMP / construction contingency — Ch. 4
- GMP cost of work — Ch. 11
- Go get the current figures yourself — Ch. 24
- go to the toolbox talk and say nothing. — Ch. 24
- Going out this week. — Ch. 25
- good faith efforts — Ch. 38
- Good forecasting culture. — Ch. 34
- goods — Ch. 16
- Grade — Ch. 8
- grade beams — Ch. 8
- Grading / land-disturbance permit — Ch. 17
- Gravity drainage — Ch. 10
- GREEN — Ch. 22
- green building rating system — Ch. 36
- Green Business Certification Inc. (GBCI) — Ch. 36
- Green Globes — Ch. 36
- Greg Howell — Ch. 27
- grid — Ch. 7
- grid-9 end wall — Ch. 25
- Grid-interactive equipment. — Ch. 36
- Gross buyout variance (favorable) — Ch. 16
- Gross deleted direct cost — Ch. 31
- Gross for the week — Ch. 20
- Gross identified savings — Ch. 35
- Gross margin — Ch. 37
- Gross margin lost — Ch. 37
- Gross profit — Ch. 34
- Gross profit earned to date — Ch. 34
- gross profit earned to date — Ch. 34
- Gross profit earned to date. — Ch. 34
- Gross scope surfaced — Ch. 16
- Ground control. — Ch. 39
- ground-bearing analysis — Ch. 21
- Growing — Ch. 39
- Growth consumes cash. — Ch. 2
- Growth dilutes supervision. — Ch. 2
- Growth is a use of cash, not a source of it. — Ch. 34
- Growth outruns the systems. — Ch. 2
- Grubbing — Ch. 8
- GUARANTEED MAXIMUM PRICE — Ch. 1 12 13 3 32 4
- Guaranteed maximum price — Ch. 1 4
- Guaranteed Maximum Price — Ch. 11
- guaranteed maximum price — Ch. 3
- Guaranteed Maximum Price (GMP) — Ch. 1 11
- guaranteed maximum price (GMP) — Ch. 16
- gym roof structure and RTU setting only — Ch. 35
- gymnasium — Ch. 40
- gymnasium roof structure — Ch. 35
- habit — Ch. 19
- Halcyon — Ch. 19
- Halcyon Electric — Ch. 19
- Halcyon Electric bought out and licensed — Ch. 17
- Halcyon Electric. — Ch. 19
- Halcyon subcontract executed — Ch. 16
- Halcyon truck in — Ch. 18
- Handoff hazards. — Ch. 24
- handoff inspection — Ch. 19
- Handset panel forms — Ch. 22
- Hangers and seismic bracing — Ch. 10
- Hank Duffy — Ch. 8
- Hank Duffy at Ironbridge Steel — Ch. 1
- Harbor Ridge — Ch. 14 2 8 9
- hard — Ch. 14
- Hard (physical) logic — Ch. 14
- hard 12 percent — Ch. 19
- hard barriers with a sealed anteroom — Ch. 18
- Hard cap at 5 weeks, not 7 — Ch. 24
- Hard carry — Ch. 37
- hard clash — Ch. 10
- Hard clash — Ch. 35
- hardware sets — Ch. 7
- Harness stretch / D-ring shift — Ch. 24
- have I read it — Ch. 7
- have the utility de-energize or relocate the line — Ch. 24
- hazard-generating decision — Ch. 41
- Hazardous materials — Ch. 6
- he is right. — Ch. 33
- head flashing membrane — Ch. 9
- Head-of-wall / top-of-wall joints — Ch. 16
- Health department review — Ch. 17
- Health Product Declaration (HPD) — Ch. 36
- health-code requirements — Ch. 36
- heat — Ch. 10
- Heat builds up. — Ch. 36
- Heat illness kills, and it kills early. — Ch. 20
- Heat pumps replacing combustion. — Ch. 36
- Heat-island mitigation. — Ch. 36
- Heat-strain monitoring — Ch. 39
- Heavily yours — Ch. 36
- Heavy civil — Ch. 38
- Heavy civil / Infrastructure — Ch. 2
- heavy duty (75 psf) — Ch. 22
- Height above grade and travel time. — Ch. 20
- Height without a system — Ch. 37
- height, capacity, and floor loading — Ch. 21
- Height-to-base ratio. — Ch. 22
- held — Ch. 23
- Held, 3 days to spare — Ch. 29
- Helical piles — Ch. 8
- Helper / tender — Ch. 20
- Her constraints shape what is achievable. — Ch. 31
- Here is the Northgate build-up itself — Ch. 4
- Hierarchy of controls — Ch. 24
- High — Ch. 18 24 4 8
- High during erection — Ch. 8
- High, once enough quantity is installed — Ch. 28
- High-risk activities requiring a written plan — Ch. 24
- High-security sites — Ch. 18
- High-visibility apparel — Ch. 21
- High. — Ch. 36
- Higher — Ch. 24
- Highest — Ch. 22 28 3
- highest — Ch. 3
- highest suicide rates — Ch. 41
- Highly jurisdiction- and contract-dependent. — Ch. 33
- highly jurisdiction-dependent — Ch. 19
- Highways and roadway — Ch. 38
- his private buffer — Ch. 27
- Historic preservation — Ch. 5
- historical cost database — Ch. 34
- hoarding to the last month — Ch. 6
- Hoist — Ch. 18
- hoist — Ch. 18
- hoist plan — Ch. 18
- Hoisting and material handling — Ch. 16
- hoisting and material handling for each trade — Ch. 17
- Hoists — Ch. 17
- hold and escalate. — Ch. 31
- hold point — Ch. 23
- Hold point (H) — Ch. 23
- hold points and handoffs. — Ch. 8
- hold points, not labor — Ch. 22
- Hold the building under pressure — Ch. 36
- honest logic — Ch. 14
- Honest total range — Ch. 41
- Horizontal directional drilling (HDD) — Ch. 38
- horizontally — Ch. 10
- hospitals frequently have helipads — Ch. 39
- Hot and cold weather. — Ch. 8
- Hot-weather protection — Ch. 18
- hour overage charge — Ch. 21
- Hours alone cannot do it either. — Ch. 20
- Hours worked. — Ch. 42
- Housekeeping — Ch. 36
- housekeeping and cleanup responsibility matrix — Ch. 18
- housekeeping is a leading indicator of planning. — Ch. 18
- Housekeeping, PPE, and site rules — Ch. 24
- How allowances get abused. — Ch. 4
- How big — Ch. 7
- How conflicts actually get resolved. — Ch. 18
- how do you announce it — Ch. 24
- How escalation clauses are structured — Ch. 4
- How far ahead it runs. — Ch. 27
- how good — Ch. 7
- How installed — Ch. 7
- How it settled. — Ch. 31
- how long — Ch. 22
- How long — Ch. 26
- How many — Ch. 7
- how many — Ch. 7
- how much you are entitled to rely on an element — Ch. 36
- how much you are entitled to rely on an element. — Ch. 35
- How owners detect it. — Ch. 32
- How the builder is selected — Ch. 3
- How the fee line is computed. — Ch. 32
- How to control cost-plus. — Ch. 4
- How to read your results. — Ch. 12
- How to read your score. — Ch. 42
- How unit price actually gets administered — Ch. 4
- How verified — Ch. 7
- How We Build. — Ch. 3
- How working days actually work. — Ch. 38
- How you break it. — Ch. 38
- Human health and occupant wellbeing — Ch. 36
- HVAC — Ch. 10
- HVAC protection — Ch. 36
- Hydraulic / timber shoring — Ch. 22
- hydraulic calculation — Ch. 10
- Hydronic pipe — Ch. 35
- identical data — Ch. 24
- Identification — Ch. 29
- identified risk within the defined scope. — Ch. 4
- Identifies what is being settled — Ch. 33
- Identifies what is not being settled — Ch. 33
- Identify the constrained system — Ch. 10
- Idle / personal — Ch. 20
- Idle and standby — Ch. 21
- Idle and standby time — Ch. 21
- Idle equipment and standby — Ch. 33
- Idle time as a percentage of engine hours — Ch. 39
- idle/standby — Ch. 31
- idling policy — Ch. 21
- if and when it occurs — Ch. 38
- If it goes badly — Ch. 41
- If it goes badly. — Ch. 41
- If it will not settle — Ch. 40
- If missed — Ch. 37
- if the work turns out to conform — Ch. 23
- If they will not sign — Ch. 26
- If you must run sustained overtime, rotate it. — Ch. 20
- IFC — Ch. 35
- Ignorance — Ch. 6
- Illumination. — Ch. 24
- illustrative — Ch. 21
- illustrative typical numbers — Ch. 24
- illustrative typical ranges, not rules — Ch. 11
- Imaging and surgery are their own worlds. — Ch. 10
- Imaging suite — Ch. 40
- Immediate action taken — Ch. 23
- immediate stop-work in the affected area — Ch. 38
- immediately — Ch. 32 5
- Imminent danger — Ch. 24
- impact statement — Ch. 26
- Impact subtotal — Ch. 31
- impacted — Ch. 31
- Impacted — Ch. 33
- Impacted as-planned — Ch. 33
- Implied warranty of the plans and specifications — Ch. 6
- importance of their advantages — Ch. 27
- Improper reshore load path — Ch. 22
- In a lump-sum contract, — Ch. 6
- in a sequence that never lets the slab deflect — Ch. 22
- in actual calendar time — Ch. 33
- In an open-book GMP or cost-plus contract, — Ch. 6
- In cash flow — Ch. 31
- in four days. — Ch. 23
- in full — Ch. 4
- in half — Ch. 27
- in nine calendar days — Ch. 25
- in parallel — Ch. 37
- in person — Ch. 41
- In practice you will not get this — Ch. 23
- in preconstruction — Ch. 35
- in the bank — Ch. 38
- In the cost report — Ch. 31
- In the forecast. — Ch. 31
- in the subcontract — Ch. 22
- in the subcontract at buyout — Ch. 36
- in time — Ch. 24
- in writing — Ch. 23
- in writing, in advance — Ch. 18
- in writing, promptly — Ch. 7
- In-house training. — Ch. 20
- in-situ relative humidity probe test — Ch. 9
- In-stream work windows — Ch. 38
- In-wall blocking and backing — Ch. 16
- IN-WALL INSPECTION (HOLD POINT) — Ch. 9
- In-wall rough-in — Ch. 9
- in-wall rough-in inspection — Ch. 10
- Inadequate bearing at the base — Ch. 22
- Inadequate bracing — Ch. 22
- inboard — Ch. 7
- incentive — Ch. 38
- Incentive and shared-savings arrangements — Ch. 4
- Incident investigation — Ch. 24
- Incident reporting and investigation — Ch. 24
- Incidental — Ch. 38
- incidental — Ch. 38
- Include a resubmittal allowance in every chain — Ch. 25
- Include the bad facts. — Ch. 33
- including Addenda 1 through 3. — Ch. 13
- including architectural precast panels — Ch. 13
- including retention billed — Ch. 34
- Income from operations — Ch. 34
- Incomplete submission — Ch. 25
- Incomplete work — Ch. 23 40
- indemnitee — Ch. 5
- indemnitor — Ch. 5
- Indemnity — Ch. 16 4
- indemnity — Ch. 2 34
- indemnity clause — Ch. 5
- Indemnity. — Ch. 24
- independent — Ch. 40
- independent contractor — Ch. 5
- independent contractor. — Ch. 20
- Independent float — Ch. 14
- independent number — Ch. 12
- Independent testing laboratory — Ch. 23
- Index-based with a deadband — Ch. 4
- Indices — Ch. 30
- Indirect costs — Ch. 12
- indirect-fired — Ch. 22
- Indirectly — Ch. 5
- Indirects and markups — Ch. 12
- Individual variance swamps all of it. — Ch. 42
- Individually — Ch. 31
- Indoor air quality assessment — Ch. 36
- Indoor Environmental Quality — Ch. 36
- Industrial — Ch. 2
- Infection Control Risk Assessment (ICRA) — Ch. 24
- Inflating impact. — Ch. 31
- Influence — Ch. 41
- Info — Ch. 25
- information — Ch. 25 8
- Information — Ch. 27
- Information (12). — Ch. 27
- Infrared thermography — Ch. 9
- infrastructure — Ch. 36
- injunction — Ch. 21
- Injuries and near-injuries — Ch. 41
- Injuries. — Ch. 18
- Innovation — Ch. 36
- inside — Ch. 21
- Inside the building, floor by floor — Ch. 17
- insisted on the original completion date — Ch. 29
- Inspection — Ch. 23 27
- inspection — Ch. 7
- Inspection and quality checklists — Ch. 39
- Inspection and test plan (ITP) — Ch. 23
- inspection and test plan (ITP) — Ch. 23
- Inspection availability becomes a constraint. — Ch. 22
- inspection hold point — Ch. 8
- inspection hold points — Ch. 8
- Inspection regime — Ch. 24
- Inspections performed and results — Ch. 26
- inspector. — Ch. 10
- inspects — Ch. 22
- Installation — Ch. 16
- installation inspection by the competent person — Ch. 25
- installation lead — Ch. 17
- installed quantities — Ch. 30
- Installer certification — Ch. 10
- Installer never saw the approved submittal — Ch. 23
- installing crew present — Ch. 23
- Instant messaging in a project platform — Ch. 26
- instruction — Ch. 35
- Instruction, breaks, and administration — Ch. 18
- Instructions to bidders — Ch. 15
- Insufficient strength at stripping — Ch. 22
- Insulating concrete forms (ICF) — Ch. 22
- Insulation — Ch. 10 36 9
- Insulation / air barrier inspection — Ch. 37
- Insulation installation quality — Ch. 36
- Insulation. — Ch. 10
- Insurance — Ch. 2 39
- Insurance and additional insured — Ch. 16
- Insurance and bonding — Ch. 15
- Insurance and bonds — Ch. 13
- Insurance is complicated — Ch. 3
- Insurance limits — Ch. 19
- Insurance, taxes, licenses. — Ch. 21
- Insurers — Ch. 1 2
- Integrated Project Delivery (IPD) — Ch. 27
- Integrated project delivery (IPD) — Ch. 3
- Integration timing dominates everything. — Ch. 36
- Integrative Process — Ch. 36
- Interconnection. — Ch. 36
- Interest (why) — Ch. 41
- interfaces — Ch. 35
- Interfaces again. — Ch. 24
- interference — Ch. 20
- Interference / failure to coordinate — Ch. 33
- Interfering float (IF) — Ch. 14
- Interim Life Safety Measures (ILSM) — Ch. 18
- Interim management milestones — Ch. 14
- interior metal-stud framing, cost code 09 2216 — Ch. 20
- interiors and closeout — Ch. 17
- Intermediate form — Ch. 5
- internal — Ch. 28
- Internal bracing (struts) — Ch. 22
- Internal failure — Ch. 23
- Internal project team meeting — Ch. 26
- Internal rate at 1.15 — Ch. 13
- internal rental rate — Ch. 13
- internal traffic control plan — Ch. 21
- internal traffic control plan (ITCP) — Ch. 24
- internally inconsistent — Ch. 7
- International Energy Conservation Code (IECC) — Ch. 36
- International Group for Lean Construction (IGLC) — Ch. 27
- Interpretation — Ch. 25
- inventoried and stored in a locked, labeled room — Ch. 40
- Inventory — Ch. 27
- Investing activities — Ch. 34
- IPD — Ch. 3
- is a portfolio. — Ch. 42
- is not proof of coverage. — Ch. 5
- Isolation — Ch. 41
- issue date — Ch. 7
- It aligns with the cost codes. — Ch. 32
- It aligns with the schedule. — Ch. 32
- It can be a licensing matter. — Ch. 23
- it cannot be used for scope changes — Ch. 6
- It compresses ranges — Ch. 6
- it contains no spoil haul-off — Ch. 12
- It converts a forecast into a testable claim. — Ch. 30
- it converts a post-mortem into a decision. — Ch. 20
- It costs more money than the fix. — Ch. 23
- It cuts against the contractor. — Ch. 23
- It cuts against the owner and the architect too — Ch. 23
- It does arithmetic on labels — Ch. 6
- It does not certify at all. — Ch. 36
- It does not cover what you should have caught. — Ch. 3
- it does not even work. — Ch. 32
- it does not protect you. — Ch. 5
- it does not work. — Ch. 33
- It forces valuation. — Ch. 33
- It gates occupancy. — Ch. 10
- It hides its own float. — Ch. 14
- It is a company number, not a project number. — Ch. 24
- it is a cost performance index in hours. — Ch. 30
- It is a credit line the surety can withdraw — Ch. 34
- It is a decision about people that has a cost. — Ch. 41
- It is a default, not a law of nature. — Ch. 3
- It is a factual dispute about physical constraint — Ch. 29
- it is also your authority. — Ch. 22
- It is an event. — Ch. 6
- It is defensible — Ch. 3
- It is discretionary. — Ch. 25
- It is linear. — Ch. 24
- It is not a licensing body. — Ch. 24
- It is not an insurer. — Ch. 24
- It is not everywhere. — Ch. 24
- It is not the only regulator on your site. — Ch. 24
- it is not widely used in building construction. — Ch. 30
- it is ready much later — Ch. 39
- It is short. — Ch. 41
- It is simple to administer — Ch. 3
- It is that it loses. — Ch. 33
- It is uncertain. — Ch. 6
- It is vulnerable to hindsight. — Ch. 24
- It is your billing forecast. — Ch. 14
- It is your first early-warning system. — Ch. 14
- It kills the learning curve. — Ch. 2
- It makes technology adoption brutally slow. — Ch. 2
- it muddies the single point of responsibility — Ch. 3
- It poisons the field. — Ch. 13
- It protected the owner, using your credit. — Ch. 15
- it protects itself. — Ch. 27
- It puts you in a different legal posture. — Ch. 23
- It removes the place the problem was hiding. — Ch. 34
- it removes work rather than adding it — Ch. 39
- It shrinks as the relationship does. — Ch. 25
- It stopped at the bottom of the units. — Ch. 36
- It surfaces non-monetary trades. — Ch. 33
- It varies by jurisdiction. — Ch. 24
- It weights frequency more heavily than severity. — Ch. 24
- it will not issue while a bond claim is open — Ch. 40
- Item 4.3, Imaging Suite. — Ch. 26
- Item 6.1, Schedule. — Ch. 26
- its own line — Ch. 11 37
- Jamal Foster — Ch. 28
- Jan 12, Year 2 — Ch. 10
- January 12, Year 2 — Ch. 10
- January 31, Year 2 — Ch. 16 30
- January 5, Year 2 — Ch. 25 9
- Job B — Ch. 32
- job borrow — Ch. 34
- Job hazard analysis — Ch. 24
- job hazard analysis (JHA) — Ch. 24
- Job order contracting (JOC) — Ch. 3
- job safety analysis (JSA) — Ch. 24
- Job-built plywood and lumber — Ch. 22
- joinder — Ch. 5
- joint check — Ch. 32
- joint check agreement — Ch. 32
- Joint check to Aperture and Northfield — Ch. 32
- joint checks — Ch. 16 5
- Joint checks — Ch. 19
- Joint design is arithmetic, not preference. — Ch. 9
- joint layout — Ch. 8
- Joints — Ch. 8
- Journeyman — Ch. 42
- Journeyman / journey-level worker — Ch. 20
- journeyman form carpenter — Ch. 20
- Judgment — Ch. 28
- Judgment / re-estimate — Ch. 28
- Judgment against a defined scope breakdown. — Ch. 32
- Jul 21, Year 1 — Ch. 10
- Jul 25 — Ch. 29
- July 14, Year 1 — Ch. 16
- July 19, Year 1 — Ch. 16
- July 20 to September 18 is 61 calendar days. — Ch. 40
- July 20, Year 2 — Ch. 10 36
- July 29, Year 1 — Ch. 16
- July 3, Year 1 — Ch. 39 8
- July 9, Year 1 — Ch. 25
- Jump / self-climbing forms — Ch. 22
- Jumping (climbing). — Ch. 21
- June 14, Year 1 — Ch. 16
- June 18 — Ch. 25
- June 2, Year 1 — Ch. 16
- June 22, Year 1 — Ch. 25
- June 24, Year 1 — Ch. 16
- June 9, Year 1 — Ch. 10
- Jurisdiction — Ch. 20
- jurisdictional dispute — Ch. 20
- jurisdictional question — Ch. 5
- jurisdictional. — Ch. 16
- Just-in-time (JIT) — Ch. 18
- K-12 — Ch. 7
- Keep a list, and keep it in one place. — Ch. 41
- Keep a revision log even though nobody makes you. — Ch. 37
- Keep one foot in the general work — Ch. 42
- Keep records the pricing mechanism requires — Ch. 31
- Keep relationships warm before you need them — Ch. 42
- Keep the estimate file — Ch. 15
- Keep three, abandon three. — Ch. 37
- Kessler Drywall & Acoustics — Ch. 5
- Kestrel — Ch. 24 25 41
- Kestrel (construction contingency) — Ch. 6
- Kestrel (Curtis Boone) — Ch. 2
- Kestrel advised on the spot — Ch. 26
- Kestrel Construction Group — Ch. 15 19
- Kestrel on time, Caldwell takes all 14 — Ch. 29
- Kestrel review and transmittal — Ch. 16
- Key personnel — Ch. 13
- key plan — Ch. 7
- Keys and keying schedule — Ch. 40
- Kill criterion — Ch. 39
- Kill on the criterion, not on a mood. — Ch. 39
- Know their alternative — Ch. 31
- Know their constraints — Ch. 31
- Know where to refer, before you need it. — Ch. 41
- Know your cost cold — Ch. 31
- Know your entitlement — Ch. 31
- Know your own weak lines — Ch. 31
- Know your walk-away — Ch. 31
- known quantity — Ch. 37
- L was no longer on the only critical path. — Ch. 29
- lab-cured — Ch. 22 23
- Lab-cured cylinders do not answer this question — Ch. 23
- Labeled — Ch. 31
- Labor — Ch. 27 31 39
- labor — Ch. 30
- Labor availability — Ch. 6
- Labor available — Ch. 27
- Labor cost — Ch. 14
- Labor gets the tightest loop — Ch. 28
- Labor is time-based. — Ch. 12
- Labor Plan — Ch. 20
- Labor records / certified payroll — Ch. 26
- Laborer — Ch. 20
- Laborer, Group 1 — Ch. 20
- Ladders and step stools replace scaffolding — Ch. 40
- Ladders inspected and the right length. — Ch. 37
- Ladders. — Ch. 24
- lag — Ch. 14
- lagging — Ch. 19 29
- Lagging — Ch. 29
- Lags. — Ch. 14
- Lane closure windows — Ch. 38
- lane rental — Ch. 38
- language — Ch. 24
- Language barriers — Ch. 37
- lap splice — Ch. 8
- Lap splice and development length — Ch. 8
- Large ductwork — Ch. 10
- Large institutional and healthcare owners. — Ch. 30
- Large national contractor — Ch. 42
- Large pressure pipe — Ch. 10
- Larkspur Builders — Ch. 34
- Laser scanning — Ch. 35
- Laser scanning, existing conditions — Ch. 39
- last calendar day of the month — Ch. 29
- last day of the month — Ch. 32
- last planner — Ch. 27
- Last Planner System (LPS) — Ch. 27
- Later modifications govern over earlier ones. — Ch. 7
- Lateral concrete pressure — Ch. 22
- lateral concrete pressure — Ch. 22
- Lateral external load — Ch. 22
- latest — Ch. 3
- Laydown — Ch. 15
- Laydown adjacency. — Ch. 18
- Laydown in the northwest quadrant — Ch. 17
- layers and non-partition surfaces — Ch. 7
- Layout — Ch. 16 9
- layout — Ch. 17
- layout error discovered after the pour — Ch. 10
- layout robot — Ch. 35
- Layout robot / robotic total station — Ch. 39
- Layout robots — Ch. 39
- LDs run — Ch. 29
- LDs stop — Ch. 40
- lead — Ch. 14 5
- Lead — Ch. 5
- lead time. — Ch. 2
- Lead times are long and lumpy. — Ch. 9
- Lead-time chains do not stretch. They snap. — Ch. 29
- Leadership — Ch. 39
- leading — Ch. 19 20 29
- Leading — Ch. 29
- Leading edges. — Ch. 24
- leading indicator — Ch. 26
- Leading indicators — Ch. 24
- leads — Ch. 32
- Leads and lags. — Ch. 14
- Lean Construction Institute — Ch. 42
- Lean Construction Institute (LCI) — Ch. 27
- lean on a coworker who wants to report — Ch. 24
- Learn some of the language yourself — Ch. 41
- Learning check-in. — Ch. 15 18 21 24 27 3 30 33 36 39 42 6 9
- Learning-curve loss — Ch. 31
- lease — Ch. 21
- least flexible pipe in the ceiling — Ch. 10
- LEED — Ch. 36
- LEED AP — Ch. 42
- Left the critical path — Ch. 14
- Legal-Framework Checklist — Ch. 5
- legible — Ch. 12
- Legitimate. — Ch. 4
- Lender — Ch. 1
- Lenders — Ch. 2
- Length — Ch. 23 24
- Less — Ch. 31
- less function for less cost — Ch. 11
- Less site labor in a tight labor market. — Ch. 39
- less zone redundancy — Ch. 11
- lesser amount — Ch. 32
- Let him talk. — Ch. 41
- Level 1 milestone schedule — Ch. 14
- Level 2 summary schedule — Ch. 14
- Level 3 CPM network — Ch. 14
- Level 3, Zone B — Ch. 27
- Level of development (LOD) — Ch. 35
- Level of effort — Ch. 28
- Level of effort (LOE) — Ch. 30
- Level the submission curve — Ch. 25
- level your submission curve. — Ch. 25
- Level-2 coordination sign-off — Ch. 10
- Level-of-effort dilution. — Ch. 30
- Leveled subtotal — Ch. 13
- LEVELED TOTAL — Ch. 13
- Leveling — Ch. 13
- levels — Ch. 15
- leverage. — Ch. 19
- LIABILITIES AND EQUITY — Ch. 34
- liability — Ch. 34
- license agreement — Ch. 17
- Licensed blaster and permits — Ch. 38
- Licensing — Ch. 2
- licensing — Ch. 37
- Licensing / accreditation survey — Ch. 40
- lien waiver — Ch. 5
- Lien waivers — Ch. 16
- life safety — Ch. 10
- Life-safety final walk — Ch. 40
- lift-by-lift compaction testing — Ch. 8
- lifts — Ch. 8
- light duty (25 psf) — Ch. 22
- Light wood frame — Ch. 8
- Lighting — Ch. 18
- Lighting controls — Ch. 10
- Lighting power and controls — Ch. 36
- like a demotion in competence. — Ch. 41
- Limited — Ch. 39
- Limited / comparative — Ch. 5
- Limited assurance — Ch. 34
- Limited but real — Ch. 39
- limited-access zone — Ch. 22
- line — Ch. 37 38
- Line of balance / linear schedule — Ch. 14
- Line pump — Ch. 21
- Line-item release — Ch. 32
- line-of-balance — Ch. 14
- Linear/time-location scheduling — Ch. 38
- Liquidated damages — Ch. 1 4 5
- liquidated damages — Ch. 4
- liquidated damages (LDs) — Ch. 9
- Liquidated damages and milestones — Ch. 15
- Liquidated damages per calendar day — Ch. 4
- liquidated damages run — Ch. 29
- liquidated damages stop — Ch. 40
- list their subcontractors — Ch. 13
- List them with the reason. — Ch. 14
- listed through-penetration firestop system — Ch. 9
- Listen to it — Ch. 13
- literal — Ch. 33
- Literal concurrency — Ch. 33
- Litigation — Ch. 33 5
- Little Miller Act — Ch. 5
- live operational data — Ch. 35
- Live-instrumented digital twin — Ch. 35
- Living Building Challenge — Ch. 36
- load — Ch. 10
- load chart — Ch. 21
- Load classes. — Ch. 22
- load factor — Ch. 21
- Load paths in old buildings are not obvious. — Ch. 22
- Load-bearing masonry — Ch. 8
- LOB — Ch. 37
- Locates have a tolerance and an expiration — Ch. 8
- Locates mark public utilities, not private ones — Ch. 8
- location — Ch. 11
- Location and Transportation — Ch. 36
- Lock the formula cells. — Ch. 13
- Locked by — Ch. 37
- Locked, alarmed conex boxes — Ch. 18
- Lockout/tagout (LOTO). — Ch. 24
- Lockout/tagout. — Ch. 10
- LOD artifact — Ch. 35
- LOD does not support it — Ch. 35
- LOD is about reliance, not detail. — Ch. 35
- LOD matrix by element and phase — Ch. 35
- Log backorders the day they appear. — Ch. 18
- Log it — Ch. 7
- Log the expiration date of every quote — Ch. 16
- Log the notice. — Ch. 27
- Logic — Ch. 14
- Logic and duration changes — Ch. 29
- Logistics. — Ch. 16
- Long-lead identification — Ch. 11
- long-lead identification — Ch. 11
- Long-lead items are now late. — Ch. 11
- longer — Ch. 21
- longest lead item — Ch. 8
- Look at the ratio. — Ch. 31
- Look for the queue on the ground. — Ch. 37
- Look-ahead visualization for lean planning. — Ch. 35
- loose — Ch. 38
- Loose — Ch. 8
- Loose (LCY) — Ch. 21
- loose measure — Ch. 8
- Lorena Vasquez — Ch. 28
- Losing a good foreman — Ch. 41
- Losing a good superintendent — Ch. 41
- lost anticipated profit on work never performed — Ch. 38
- Low — Ch. 28
- low permeability — Ch. 22
- Low to moderate. — Ch. 36
- low voltage — Ch. 10
- Low voltage — Ch. 10 35
- Low-bid competition pushes contract price down. — Ch. 2
- Low-emitting materials — Ch. 36
- Low-impact development (LID) — Ch. 36
- low-voltage — Ch. 10
- Low-voltage switchgear — Ch. 25
- Low. — Ch. 36
- Lower — Ch. 24
- Lower-carbon steel sourcing. — Ch. 36
- Lowest — Ch. 3
- Lowest by design — Ch. 3
- Lowest per SF — Ch. 22
- lowest rate — Ch. 37
- lowest responsive, responsible bidder — Ch. 2
- luffing-jib — Ch. 21
- lump sum — Ch. 1 3
- Lump sum — Ch. 4
- LUMP SUM PRICE — Ch. 4
- Lump sum price — Ch. 4
- M-104 — Ch. 25
- machine control — Ch. 38
- Machine control — Ch. 39
- Machine control / grade control on earthmoving — Ch. 39
- Machine cost per LCY — Ch. 21
- Machine cost per loose cubic yard — Ch. 21
- Machine X. — Ch. 21
- Machine Y. — Ch. 21
- magnitudes, not measurements — Ch. 25
- Maintainability — Ch. 11
- maintained envelope — Ch. 10
- major — Ch. 38
- major item — Ch. 38
- major items — Ch. 38
- Make each trade foreman sign a self-punch sheet — Ch. 9
- Make their work easy and profitable — Ch. 19
- Make yourself replaceable on purpose — Ch. 42
- man-hours — Ch. 15
- Manage the relationship honestly. — Ch. 10
- management — Ch. 7
- Management reserve — Ch. 6
- Manages by meeting. — Ch. 37
- Manages by presence. — Ch. 37
- Mandatory Start / Mandatory Finish — Ch. 14
- Manpower by subcontractor and trade — Ch. 26
- Manpower thresholds — Ch. 19
- Manpower. — Ch. 26
- manual premium — Ch. 24
- Manual takeoff — Ch. 35
- manufacturer-issued written repair procedure — Ch. 23
- Manufacturers and Materials — Ch. 7
- Many trades in small areas doing small tasks. — Ch. 40
- Many valid claims are not worth pursuing — Ch. 33
- Map and rank — Ch. 36
- March 10, Year 1 — Ch. 25
- March 13 — Ch. 25
- March 13, Year 1 — Ch. 25
- March 18 — Ch. 27
- March 2, Year 2 — Ch. 25
- March 22 — Ch. 25
- March 27 — Ch. 27
- March 28 of Year 2 — Ch. 22
- March 28, Year 2 — Ch. 16 18 9
- March 3, Year 1 — Ch. 14 34 40 9
- March 30 — Ch. 27
- March 7, Year 1 — Ch. 16 25
- Margin — Ch. 12 13
- margin — Ch. 31
- Margin lost despite winning the claim — Ch. 38
- marginal — Ch. 20
- marginal cost really is below your average cost — Ch. 2
- Margo Deacon — Ch. 25 28
- Margo did two things Dani did not do. — Ch. 41
- Mark them visibly. — Ch. 24
- Market allocation — Ch. 15
- Market and escalation analysis — Ch. 11
- Market conditions. — Ch. 3
- Market coverage — Ch. 11
- market price testing — Ch. 3
- Markup — Ch. 12 13
- Markups — Ch. 12
- Masonry — Ch. 23
- masonry from scaffold — Ch. 24
- Masonry veneer — Ch. 9
- Masonry walls. — Ch. 22
- mass haul diagram — Ch. 38
- Mass timber — Ch. 36 8
- Mass timber (CLT/glulam/NLT) — Ch. 8
- Mast climbers — Ch. 9
- Mast climbers, hoists, and suspended platforms. — Ch. 25
- Mast climbing work platform — Ch. 21 22
- Mat (raft) foundation — Ch. 8
- Match codes to quantities. — Ch. 20
- Match lines — Ch. 7
- matched — Ch. 38
- Matched fleet — Ch. 21
- material — Ch. 15
- Material — Ch. 31
- Material (14). — Ch. 27
- Material and tool tracking — Ch. 39
- Material handling — Ch. 19
- Material handling and searching — Ch. 18
- Material hoist — Ch. 21
- Material is quantity-based. — Ch. 12
- Material not on site — Ch. 27
- Material on site — Ch. 27
- Material per CY — Ch. 12
- material waste and short loads — Ch. 12
- materially unbalanced — Ch. 15 38 4
- Materials and Resources — Ch. 36
- Materials handling. — Ch. 36
- Materials testing — Ch. 23
- Materials, at the point of purchase — Ch. 36
- materials-index adjustment — Ch. 11
- matrix — Ch. 35
- maturity method — Ch. 22 39
- maximum dry density — Ch. 8
- maximum wind speed — Ch. 21
- May 12, Year 1 — Ch. 16 25
- May 22 — Ch. 40
- May 23 — Ch. 29
- May 23, Year 1 — Ch. 25
- May 26, Year 1 — Ch. 25
- May 30, Year 2 — Ch. 10
- May 6 — Ch. 27
- May 6, Year 2. — Ch. 27
- May 9, Year 1 — Ch. 8
- may not proceed — Ch. 23
- MBA. — Ch. 42
- MBF — Ch. 12
- mean — Ch. 6
- means and methods — Ch. 35 6
- Means and Methods. — Ch. 8
- Means of egress — Ch. 22
- measurable — Ch. 20
- measure and certify every quantity — Ch. 4
- measure. — Ch. 4
- Measured energy and envelope performance — Ch. 36
- measured mile — Ch. 20
- Measured mile — Ch. 33
- Measured operating energy performance — Ch. 36
- measured performance — Ch. 36
- measured quantity — Ch. 38
- Measurement and payment — Ch. 6
- measurement method — Ch. 38
- mechanical — Ch. 10
- mechanical and electrical rooms — Ch. 35
- Mechanical equipment efficiency — Ch. 36
- Mechanical rooms change shape — Ch. 36
- mechanical, electrical, and plumbing — Ch. 10
- mechanism — Ch. 20
- Mediation — Ch. 33 5
- Medical and first aid — Ch. 24
- medical gas — Ch. 10 13
- Medical gas — Ch. 13 35
- medical gas installation permit — Ch. 27
- Medical gas verification — Ch. 23 40
- medium duty (50 psf) — Ch. 22
- Medium to high — Ch. 36
- Meeting calendar and distribution matrix — Ch. 17
- Meeting minutes — Ch. 26
- Meetings and reporting — Ch. 25
- Mentor and pair. — Ch. 19
- MEP — Ch. 10 9
- MEP / model coordination meeting — Ch. 26
- MEP coordination, not structure. — Ch. 19
- MEP engineer — Ch. 1
- MEP rough-in complete, all levels — Ch. 10
- MEP total — Ch. 10
- Merge bias. — Ch. 6
- Meridian — Ch. 23
- Meridian (owner) — Ch. 6
- Meridian Health System — Ch. 24
- Meridian interim clinic lease expires — Ch. 40
- MERV — Ch. 10
- Metadata — Ch. 26
- Metal deck — Ch. 8
- Metal panel — Ch. 9
- Metal stud framing — Ch. 9
- Methods available — Ch. 33
- Microsoft Project — Ch. 14
- mid-design — Ch. 3
- Mid-size regional (Kestrel) — Ch. 42
- middle — Ch. 22
- midpoint of construction — Ch. 11
- Milestone / weighted steps — Ch. 28
- Milestone budgeting — Ch. 11
- Milestone schedule — Ch. 14
- mill release date of April 18 — Ch. 25
- Mill release deadline April 18 missed by 3 CD. — Ch. 29
- mill rolling slot — Ch. 10 14
- mill rolling slot is next Wednesday. — Ch. 1
- Miller Act — Ch. 2
- Milo Serrano — Ch. 27 29
- minimum approach distance — Ch. 21
- minor informality — Ch. 15
- Minute 30 onward. — Ch. 23
- Minutes — Ch. 26
- Minutes 0 to 8. — Ch. 19
- Minutes 14 to 22. — Ch. 19
- Minutes 22 to 31. — Ch. 19
- Minutes 31 to 40. — Ch. 19
- Minutes 8 to 14. — Ch. 19
- Miscellaneous but real — Ch. 17
- Misclassification. — Ch. 20
- Misclassifying as first-aid-only — Ch. 24
- Missed by 3 — Ch. 29
- Missed inspections. — Ch. 9
- Missed. — Ch. 26
- Misses the contract. — Ch. 37
- Misses the money model. — Ch. 37
- Missing coordination between trades — Ch. 23
- mitigate — Ch. 4 6
- Mitigate — Ch. 6
- Mix design and temperature. — Ch. 38
- Mixed products. — Ch. 9
- Mobile hydraulic truck crane — Ch. 21
- Mobile tower (rolling) — Ch. 22
- Mobilization — Ch. 28
- Mobilization and demobilization — Ch. 13 21
- Mobilization plan and schedule — Ch. 17
- Mockup — Ch. 23
- Mockup and benchmark schedule — Ch. 23
- Mockups — Ch. 25
- mockups — Ch. 7
- Mockups and benchmark installations. — Ch. 19
- model — Ch. 14
- model code — Ch. 36
- Model extraction — Ch. 35
- model, serial number — Ch. 40
- Model-based layout — Ch. 35
- Modeled owner outlay — Ch. 3
- Models nobody trusts — Ch. 35
- Moderate — Ch. 36
- Moderate. — Ch. 33 36
- Modification control — Ch. 22
- modification-control procedure — Ch. 22
- modification-control rule — Ch. 22
- Modifications — Ch. 4 7
- Modified bitumen — Ch. 9
- modified total cost method — Ch. 33
- Modular and volumetric offsite housing — Ch. 37
- Moisture is the enemy — Ch. 36
- moisture management plan — Ch. 8
- Moisture protection during erection — Ch. 8
- Moisture protection during erection. — Ch. 8
- Monday — Ch. 25
- money — Ch. 29 33 6
- Money — Ch. 41
- money and procurement — Ch. 28
- Money check. — Ch. 1 10 12 13 14 15 22 23 32 34 35 4 6 8
- Money flows up the pyramid — Ch. 2
- money problem — Ch. 14
- Monitoring-based commissioning — Ch. 40
- Monte Carlo simulation — Ch. 6
- month five — Ch. 32
- month fourteen — Ch. 36
- month-6 data date — Ch. 29
- month-four — Ch. 28
- monthly — Ch. 25 29
- Monthly owner / executive review — Ch. 26
- Monthly pay application, SOV, retention — Ch. 37
- Monthly tracking log — Ch. 36
- Monthly updating — Ch. 27
- Months of backlog — Ch. 34
- more cash — Ch. 34
- more findings each — Ch. 24
- More levels of shores and reshores stay in place — Ch. 22
- more likely to be true — Ch. 26
- more money — Ch. 8
- more slowly — Ch. 36
- more than 10 feet above a lower level — Ch. 22
- more than half of the scheduled shift — Ch. 18
- Most contractors forget to bill it. — Ch. 31
- Most defensible. — Ch. 33
- most likely — Ch. 14
- Most of the people you lead do not work for you — Ch. 41
- Most stringent governs — Ch. 7
- Mostly fact — Ch. 28
- Motion — Ch. 27
- Move the roofing loads to the crane. — Ch. 18
- MOVE. — Ch. 18
- moved — Ch. 22
- moves — Ch. 29
- MSF — Ch. 12
- Mtd — Ch. 28
- mudsills — Ch. 22
- multi-employer worksite — Ch. 24
- multi-employer worksite policy — Ch. 24
- multi-trade rack — Ch. 10 35
- Multi-trade racks — Ch. 39
- Multifamily — Ch. 2 37
- multifamily — Ch. 37
- multiple critical paths — Ch. 14
- multiple-prime — Ch. 3
- Multiply by WIP. — Ch. 37
- municipal owner — Ch. 40
- must resolve — Ch. 35
- Mutual waiver of liability. — Ch. 3
- My position, for whatever it is worth. — Ch. 36
- Nadia decides the final number. Then it is locked — Ch. 15
- Nadia Haddad — Ch. 28 42
- Nadia Haddad as executive sponsor — Ch. 39
- Nadia will ask you for this number. Have it. — Ch. 24
- nail-laminated timber (NLT) — Ch. 8
- Name an end date and hold it. — Ch. 41
- name and classification — Ch. 31
- Name the team for real, early. — Ch. 15
- Name your rate and your source — Ch. 11
- Name your top three risks out loud, in the deck, — Ch. 15
- named competent person — Ch. 22
- named executive sponsor — Ch. 15
- named human being — Ch. 24
- named it as not a performance conversation — Ch. 41
- named owner of the daily model-to-field file — Ch. 39
- named person — Ch. 26
- named, priced allowances — Ch. 3
- named, specific, physical change — Ch. 30
- named-candidate — Ch. 41
- names — Ch. 23
- Names, classifications, and hours — Ch. 26
- Naming — Ch. 26
- naming an owner for it — Ch. 36
- National CAD Standard — Ch. 7
- Natural gas. — Ch. 10
- NAWIC — Ch. 42
- NCR number and date — Ch. 23
- NDL — Ch. 9
- NDL system warranty — Ch. 9
- near-critical — Ch. 14
- Near-critical paths — Ch. 29
- near-miss — Ch. 22
- Near-miss reporting rate — Ch. 24
- Near-miss reports submitted — Ch. 24
- neat line — Ch. 38
- Neat-line measurement. — Ch. 38
- Need-by date — Ch. 27
- Needle beams — Ch. 22
- needs — Ch. 22
- negative — Ch. 10 27
- negative air pressure inside the work zone — Ch. 18
- Negative float — Ch. 14
- Negative lags. — Ch. 14
- Negotiate — Ch. 33
- negotiate a joint check — Ch. 5
- Negotiate early and expect a discount. — Ch. 33
- negotiate or accept — Ch. 4
- Negotiate the components you can verify. — Ch. 42
- Negotiate the price hold explicitly. — Ch. 16
- Negotiate. — Ch. 4
- Negotiated / repeat client — Ch. 15
- Negotiated work and repeat clients. — Ch. 15
- Neil Bhandari — Ch. 21
- neither one is a spreadsheet error. — Ch. 30
- Net — Ch. 33 38
- Net (neat-line) volume — Ch. 12
- Net benefit of the 5-day cycle — Ch. 22
- net capacity — Ch. 21
- net capacity available for the load — Ch. 21
- Net cash consumption to finish — Ch. 34
- Net cash provided by operating activities — Ch. 34
- Net cash used in financing activities — Ch. 34
- Net cash used in investing activities — Ch. 34
- Net cost of the set to this job — Ch. 22
- Net direct cost difference — Ch. 39
- Net export — Ch. 8
- Net genuinely unbought scope — Ch. 16
- NET IDENTIFIED SAVINGS — Ch. 35
- Net impact to steel erection start — Ch. 8
- Net income — Ch. 34
- Net increase in cash — Ch. 34
- Net payable to Sightline for April — Ch. 5
- Net position — Ch. 34
- Net real buyout savings, day 90 — Ch. 16
- Net slip to steel erection start — Ch. 16
- nets the most. — Ch. 33
- network — Ch. 14
- never — Ch. 23
- Never — Ch. 26 30
- Never accept responsibility in your own minutes. — Ch. 26
- never allowing anyone under a suspended load — Ch. 18
- Never assert a fact you cannot exhibit. — Ch. 33
- Never characterize. — Ch. 26
- never closes — Ch. 37
- Never conceal. — Ch. 23
- Never interpolate in your favor. — Ch. 21
- Never leave a field blank. — Ch. 26
- Never let a trade start work on a coverage gap. — Ch. 5
- Never let one method be used for everything. — Ch. 28
- Never reimbursable — Ch. 4
- Never ride it while it is moved — Ch. 22
- Never round down. — Ch. 12
- Never skip this — Ch. 18
- Never swing a load over an occupied area. — Ch. 18
- never transferred, never accepted. — Ch. 22
- Never transferred. Never accepted. — Ch. 6
- never typed, always calculated — Ch. 29
- Never use negative lags. — Ch. 14
- never zero and never a ceiling. — Ch. 24
- Never. — Ch. 28
- new seam at the area line — Ch. 16
- New workers are at concentrated risk. — Ch. 20
- next 48 hours. — Ch. 40
- Next chapter — Ch. 12 13 14 19 20 23 25 28 31 32 33 36 37 38 39 5 7 9
- Next chapter, — Ch. 16
- next month. — Ch. 2
- NFPA 101 — Ch. 10
- NFPA 70, the National Electrical Code — Ch. 10
- NFPA 70E — Ch. 10 24
- NFPA 72 — Ch. 10
- NFPA 99 — Ch. 10
- NFPA 99, the Health Care Facilities Code — Ch. 10
- nine — Ch. 8
- nine days — Ch. 29
- nine to one — Ch. 22
- nine weeks — Ch. 9
- nineteen minutes — Ch. 24
- ninety homes a year — Ch. 37
- NIOSH — Ch. 41
- nitrogen purge — Ch. 10
- no activity has reported late yet. — Ch. 20
- No additional-insured endorsement attached — Ch. 5
- No adjustment — Ch. 38
- No assurance. — Ch. 34
- no buyer — Ch. 37
- No causation and no mitigation. — Ch. 26
- no contract with each other — Ch. 3
- no damage for delay — Ch. 14 6
- No degree, from the trades. — Ch. 42
- no differing site conditions clause — Ch. 15
- No direct cost — Ch. 29
- No exceptions taken — Ch. 25
- No impact statements. — Ch. 26
- No injury — Ch. 29
- No injury, no first aid, no property damage. — Ch. 26
- no later than June 14, Year 1 — Ch. 16
- no later than June 24, Year 1 — Ch. 16
- no later than March 15 — Ch. 15
- No measurement. — Ch. 26
- no money — Ch. 18
- no more than 2 of 12 — Ch. 39
- No other dried-in released area was available — Ch. 26
- No other released work available in Area B — Ch. 26
- No other released work was available in Area B — Ch. 26
- no photographs — Ch. 25
- no prejudice — Ch. 15
- No recovery day. — Ch. 24
- No retention with milestone holdback — Ch. 32
- no row, no draw. — Ch. 6
- No tag — Ch. 22
- No time extension — Ch. 29
- no trade attached — Ch. 7
- No waiver of subrogation shown — Ch. 5
- No work performed today. — Ch. 26
- No work without written authorization. — Ch. 31
- no-damage-for-delay — Ch. 19 4 5 6
- no-damage-for-delay clause — Ch. 15 4
- No-damage-for-delay clauses — Ch. 33
- No. — Ch. 10 31 33 36
- nobody can tell which — Ch. 11
- Nobody chooses the critical path. — Ch. 14
- Nobody closes their own item. — Ch. 23
- Nobody gets humiliated in it, ever. — Ch. 41
- nobody made an arithmetic mistake. — Ch. 12
- nobody owns hoisting. — Ch. 13
- Nobody owns it — Ch. 36
- Nobody owns the interfaces. — Ch. 25
- nobody proceeds on a verbal — Ch. 41
- nobody rides. — Ch. 22
- nobody stands behind or in line with the jack — Ch. 8
- Noise — Ch. 37
- Noise and vibration limits — Ch. 38
- nominal — Ch. 12
- Non-compensable — Ch. 29
- Non-compete and non-solicit clauses. — Ch. 42
- Non-critical work was completed early. — Ch. 30
- Non-excusable — Ch. 29 33
- non-excusable — Ch. 30
- Non-excusable. — Ch. 29
- Nonconformance procedure — Ch. 23
- nonconformance report (NCR) — Ch. 23
- Nonconformance reports (NCRs) — Ch. 26
- nonconforming work — Ch. 36
- none — Ch. 40
- None of it was provable. — Ch. 36
- None of them decides. — Ch. 39
- Normal conditions are a management output. — Ch. 20
- Normalize the topic before you need it. — Ch. 41
- Northfield Glass Products — Ch. 32
- Northgate — Ch. 2
- Northgate Outpatient Pavilion — Ch. 2 21
- Northgate Outpatient Pavilion. — Ch. 34
- Northgate, at completion. — Ch. 24
- not — Ch. 10 13 21 23 24 25 26 27 28 3 33 34 35 37 38 4 40 41 5 6 7
- Not — Ch. 27 4
- not a calendar count — Ch. 23
- Not a certification and not a performance claim. — Ch. 36
- not a crane until you hang a load from it — Ch. 21
- Not a general contingency. — Ch. 6
- Not approved — Ch. 25
- not equal — Ch. 24
- Not established. — Ch. 5
- not finished — Ch. 23
- not having the building — Ch. 40
- Not in the estimate — Ch. 7
- not netted against each other — Ch. 34
- not one of the four is PPE. — Ch. 24
- Not one of those is an estimating failure. — Ch. 15
- NOT READY — Ch. 27
- Not scheduled — Ch. 40
- Not scheduled. — Ch. 40
- not separately paid — Ch. 38
- Not started — Ch. 40
- Not submitted. — Ch. 40
- not the foreman — Ch. 23
- not today. — Ch. 29
- not uniform. — Ch. 20
- not yet agreed — Ch. 33
- not yet installed — Ch. 32
- Note. — Ch. 26
- nothing — Ch. 25
- Nothing about the project has changed. — Ch. 11
- Nothing in that ladder changed the building. — Ch. 3
- nothing in writing about their manpower. — Ch. 19
- Notice — Ch. 16 31 4
- notice — Ch. 33
- notice and claim — Ch. 5
- Notice first, work second — Ch. 40
- Notice is not a price. Notice is a flag. — Ch. 31
- Notice may be a condition precedent. — Ch. 29
- NOTICE OF CHANGE AND RESERVATION OF RIGHTS — Ch. 31
- notice periods — Ch. 4
- notice provision — Ch. 17 26
- Notice the trap. — Ch. 15
- Notice to Proceed — Ch. 17
- Notice to Proceed (NTP) — Ch. 11
- Notice to the surety — Ch. 19
- notice within the stated period — Ch. 33
- Notice, in the form the clause requires. — Ch. 19
- Notification and traffic control — Ch. 38
- notify — Ch. 23
- Notify in writing, today — Ch. 38
- Nov 4 — Ch. 32
- November 12, Year 1 — Ch. 10 16
- November 2, Year 1 — Ch. 25
- November 20, Year 1 — Ch. 16
- November 22, Year 1 — Ch. 25
- November 27, Year 1 — Ch. 25
- November 30, Year 1 — Ch. 28
- November 4 — Ch. 32
- now — Ch. 25 26
- Now — Ch. 9
- Now add the schedule, which is the whole point. — Ch. 21
- Now apply the hierarchy. — Ch. 24
- Now connect it to this chapter. — Ch. 9
- Now do one thing. — Ch. 33
- Now pay both bids at actual quantities — Ch. 4
- Now read the difference between C, D, and F. — Ch. 14
- Now read the result, because this is the lesson. — Ch. 12
- Now the four calculations, in order. — Ch. 34
- Now the hedging, and I mean it. — Ch. 42
- Now the honest accuracy discussion — Ch. 39
- Now the honest limits — Ch. 24
- Now the trap on the fill side. — Ch. 12
- NTP — Ch. 17
- nuclear density gauge — Ch. 8
- Number four is real, and it is last for a reason. — Ch. 19
- Number of activities with no predecessor — Ch. 14
- Number of activities with no successor — Ch. 14
- Number of constrained activities — Ch. 14
- number or date — Ch. 26
- Numbers from this chapter worth carrying. — Ch. 16
- O&M manuals — Ch. 40
- OAC meeting — Ch. 26 37
- Obeya — Ch. 27
- obligee — Ch. 5
- observe, measure, coordinate, or document — Ch. 39
- Observed condition — Ch. 25
- occupy and use the work for its intended purpose — Ch. 4
- OCIP — Ch. 5
- Oct 1 — Ch. 40
- Oct 11, Year 2 — Ch. 29
- Oct 2 — Ch. 32
- Oct 25 — Ch. 32
- Oct 9, Year 2 — Ch. 10
- October 1 — Ch. 40
- October 1 of Year 2 — Ch. 3
- October 1 of Year 2. — Ch. 2
- October 1, Year 2 — Ch. 11 14 15 19 24 29 41 8
- October 11, Year 2 — Ch. 14 29
- October 15 — Ch. 32
- October 2, Year 2 — Ch. 40
- October 25, Year 1 — Ch. 32
- October 7 — Ch. 33
- Odessa Pruitt — Ch. 21
- of the pursuit — Ch. 15
- off — Ch. 39
- Off-hours and weekend work — Ch. 16
- off-site date — Ch. 21
- office ladder — Ch. 42
- offset lines — Ch. 18
- OKONKWO — Ch. 42
- on or before — Ch. 5
- on the clock. — Ch. 20
- on the critical path — Ch. 31
- on the platform — Ch. 24
- On the sheet, with the other numbers. — Ch. 29
- on the work. — Ch. 20
- on this job — Ch. 24
- on top of the face of the WRB — Ch. 9
- on-site date — Ch. 21
- On-site reuse documentation — Ch. 36
- On-site solar (photovoltaics). — Ch. 36
- Once — Ch. 23
- once in twenty-two weeks. — Ch. 27
- one — Ch. 16 24 41
- one 90-ton crane — Ch. 18
- One additional week of dewatering — Ch. 22
- One calculation before you file it. — Ch. 26
- One commitment. — Ch. 15
- One controlled set, stamped. — Ch. 7
- one credible removal — Ch. 41
- one crew — Ch. 37
- one hoist — Ch. 18
- one in five — Ch. 2
- one in six — Ch. 15
- one material/personnel hoist — Ch. 18
- One more thing worth noticing. — Ch. 4
- One multi-party agreement. — Ch. 3
- One named person owns the interface — Ch. 18
- One owner. — Ch. 25
- one paragraph — Ch. 11
- one paragraph naming the binding constraint — Ch. 17
- One paragraph on what you would get wrong. — Ch. 37
- one period behind — Ch. 32
- One person touches the summary. — Ch. 13
- One physical area. — Ch. 14
- One point of contact — Ch. 37
- one portable unit per 10 workers, serviced weekly — Ch. 18
- One responsible party. — Ch. 14
- One scope, one project, one defined boundary. — Ch. 39
- one sentence — Ch. 3
- one specific risk you are accepting. — Ch. 3
- One street frontage only — Ch. 17
- one third to one half — Ch. 34
- One ticket per day per change — Ch. 26
- one truck at a time — Ch. 18
- One type of work. — Ch. 14
- One version per phase, minimum. — Ch. 18
- one week of units — Ch. 18
- One whole elevation, slab edge to roof. — Ch. 27
- one written notice and 24 hours — Ch. 18
- one year — Ch. 5
- one zone — Ch. 9
- one-house buffer — Ch. 37
- One. — Ch. 17 22 32 36 39 5
- ongoing — Ch. 5
- ongoing operations — Ch. 5
- only — Ch. 40
- Only a 4D model. — Ch. 35
- only at the boring locations on the dates drilled — Ch. 38
- only if — Ch. 32 5
- Only Item 2 triggers it. — Ch. 38
- Only the CPM measures time. — Ch. 30
- Only then — Ch. 20
- only to the varied portion — Ch. 38
- open — Ch. 41
- Open ends — Ch. 14
- open ends — Ch. 14
- opening conference — Ch. 24
- Operated and maintained (O&M) — Ch. 21
- operating — Ch. 31
- Operating activities — Ch. 34
- Operating cost — Ch. 13
- operating layer — Ch. 18
- operating lease — Ch. 21
- Operating subtotal — Ch. 13
- Operating total, with operator — Ch. 21
- operation — Ch. 28
- Operational carbon — Ch. 36
- Operational limits — Ch. 39
- Operations and maintenance data — Ch. 25
- Operations executive (VP of operations) — Ch. 42
- Operator certification — Ch. 39
- Operator cost — Ch. 13
- Opportunity for the owner to investigate — Ch. 38
- Optimism bias. — Ch. 6
- Optimism, and anchoring. — Ch. 28
- optimum moisture content. — Ch. 8
- Option A. — Ch. 24
- Options are a fifth of the margin. — Ch. 37
- Options presented by Kestrel. — Ch. 26
- order 536 CY — Ch. 8
- order of precedence — Ch. 13 4 42 6
- Order of precedence — Ch. 4
- Organized in a way that survives interruption. — Ch. 1
- Orientation and training — Ch. 24
- Orientation coverage — Ch. 24
- Original budget — Ch. 28
- OSHA — Ch. 5
- OSHA 10 / OSHA 30 — Ch. 42
- OSHA 10 and 30 — Ch. 42
- OSHA 30 — Ch. 42
- OSHA applies to a house. — Ch. 37
- OSHA-approved state plans — Ch. 24
- Other-than-serious — Ch. 24
- OUT — Ch. 25
- out — Ch. 30
- out loud in front of the peers who depend on it — Ch. 27
- out loud, in front of the other trades — Ch. 27
- Out-of-sequence progress — Ch. 29
- Out-of-sequence work — Ch. 14 23 31
- Out-of-sequence work and rework. — Ch. 20
- out-of-service radius — Ch. 21
- outboard — Ch. 7
- outcome — Ch. 36
- output — Ch. 24
- outputs of upstream decisions — Ch. 41
- over — Ch. 37 9
- over the top of the parapet — Ch. 9
- Over-billed — Ch. 34
- Over-billing — Ch. 34
- over-billings — Ch. 34
- Over-processes. — Ch. 37
- Over-processing — Ch. 27
- over/(under) billing — Ch. 34
- Overexertion and manual handling. — Ch. 18
- overhaul — Ch. 38
- overhead — Ch. 24
- Overhead power lines. — Ch. 24
- Overhead work above occupied work. — Ch. 24
- Overproduction — Ch. 27
- overrun — Ch. 16
- Oversail — Ch. 17
- Oversize and overweight load permits — Ch. 17
- overstated — Ch. 4
- Overstates early progress by design. — Ch. 30
- Overtime hours are a leading indicator. — Ch. 20
- owed them for it — Ch. 33
- own — Ch. 5
- own, rent, lease, or operated rental — Ch. 21
- owned — Ch. 12
- Owned — Ch. 21
- Owner — Ch. 1 27 3 4 6
- owner — Ch. 17 21 23 24 3 37
- Owner and site restrictions — Ch. 39
- owner audit right — Ch. 28
- Owner audit rights under an open-book GMP. — Ch. 34
- owner credit — Ch. 23
- owner decision made before you are hired. — Ch. 36
- Owner decisions. — Ch. 11
- Owner involvement required — Ch. 3
- Owner is really buying — Ch. 4
- Owner occupancy — Ch. 17
- Owner or design change — Ch. 27
- Owner owns the float — Ch. 14
- Owner reporting and marketing — Ch. 39
- Owner, unilaterally — Ch. 31
- Owner-caused delay — Ch. 33 6
- Owner-Controlled Insurance Program — Ch. 5
- Owner-directed — Ch. 31
- Owner-directed change — Ch. 31
- Owner-engaged laboratory. — Ch. 23
- owner-furnished — Ch. 11
- Owner-furnished equipment. — Ch. 11
- Owner-imposed operational milestones — Ch. 14
- owner-owned float — Ch. 14
- Owners — Ch. 39
- Ownership — Ch. 42
- Ownership cost — Ch. 13
- Ownership of the project record. — Ch. 42
- Ownership subtotal — Ch. 13
- Owning and operating — Ch. 13
- P-3 and P-4 — Ch. 29
- P. Sethi (Meridian Health System) — Ch. 26
- package — Ch. 30
- Package size — Ch. 19
- Packaged — Ch. 31
- packaged rooftop units — Ch. 21
- Pad A — Ch. 18
- paid — Ch. 38
- paid a higher fee — Ch. 3
- paid invoice or bill of sale transferring title — Ch. 16
- paid statistically — Ch. 38
- Painting of exposed work — Ch. 16
- Parallel manufacturing. — Ch. 39
- Parking — Ch. 17
- parking and drive paving — Ch. 38
- Parking and gate throughput — Ch. 17
- part — Ch. 10
- Part 1926 — Ch. 24
- Partial / phased substantial completion — Ch. 40
- partial enclosure release — Ch. 9
- Partial gap. — Ch. 16
- partition-type sheet — Ch. 7
- Partly real, partly deferred. — Ch. 3
- Partly yours — Ch. 36
- Partly. — Ch. 24
- Passive House — Ch. 36
- passive survivability — Ch. 36
- Past performance — Ch. 13
- Patching — Ch. 16
- path — Ch. 14 37
- Path B, and it is not close. — Ch. 29
- Path forward, agreed out loud — Ch. 41
- Pathway interruption — Ch. 36
- pattern of ignored complaints — Ch. 18
- Pay — Ch. 5
- pay factor — Ch. 38
- Pay faster. — Ch. 19
- Pay people correctly and on time. — Ch. 41
- Pay people on time — Ch. 42
- Pay them correctly and on time — Ch. 19
- pay, honestly stated — Ch. 20
- Pay-if-paid — Ch. 16 32
- pay-if-paid — Ch. 2 31
- Pay-if-paid versus pay-when-paid — Ch. 16
- pay-if-paid versus pay-when-paid — Ch. 5
- Pay-if-paid vs. pay-when-paid — Ch. 4
- Pay-when-paid — Ch. 16 31 32
- pay-when-paid — Ch. 2
- Payment — Ch. 32
- payment and performance bonds — Ch. 5
- payment bond — Ch. 2 5
- Payment bond — Ch. 5
- Payment for stored materials — Ch. 16
- Payment terms — Ch. 16
- Payment terms. — Ch. 32
- Payment timing — Ch. 4
- PE license — Ch. 42
- Peak volume — Ch. 17
- Peak. — Ch. 2
- Pedestrian protection and traffic control. — Ch. 17
- peers — Ch. 2
- penal sum — Ch. 15
- penalty — Ch. 5
- Penalty maximums are adjusted periodically — Ch. 24
- Pending 12 days — Ch. 31
- Pending 27 days — Ch. 31
- Pending 34 days — Ch. 31
- Pending changes not carried. — Ch. 28
- people and hand-carried conductive objects — Ch. 24
- People who avoid conflict entirely. — Ch. 1
- People who can be told they are wrong. — Ch. 1
- People who like buildings. — Ch. 1
- People who need closure. — Ch. 1
- People who need to be liked in the moment. — Ch. 1
- People who think the field works for them. — Ch. 1
- People who write things down. — Ch. 1
- People you developed who got promoted — Ch. 42
- Per available hour — Ch. 21
- per day — Ch. 24
- Per diem / travel — Ch. 42
- Per opening — Ch. 37
- Per productive pick-hour — Ch. 21
- per shift — Ch. 29
- per unit of production — Ch. 21
- per unit of production per hour — Ch. 38
- Per week — Ch. 22
- Per worker per week — Ch. 20
- Percent complete — Ch. 28 34
- percent complete — Ch. 34
- Percent complete (judgment) — Ch. 30
- Percent of 500 — Ch. 15
- percent of chart — Ch. 21
- Percentage fee — Ch. 4
- Percentage of activities on the critical path — Ch. 14
- Performance — Ch. 7
- performance and payment bond — Ch. 16
- Performance bond — Ch. 5 6
- performance mockup — Ch. 16
- performance obligations are satisfied — Ch. 34
- Performance path — Ch. 36
- performance path. — Ch. 36
- performance requirement — Ch. 25
- Performance testing — Ch. 23
- performed — Ch. 30
- Period — Ch. 33
- period by period — Ch. 33
- permanent lateral system — Ch. 22
- Permanent power energization — Ch. 40
- Permanent services — Ch. 17
- Permeable paving — Ch. 36
- Permissibility varies enormously by jurisdiction — Ch. 36
- Permit closeouts — Ch. 40
- Permit matrix — Ch. 17
- permit matrix — Ch. 17
- Permits and fees — Ch. 13 6
- Permits and inspections — Ch. 27
- permits pulled by trades — Ch. 17
- Permits. — Ch. 11
- Permitting delay — Ch. 6
- Permitting strategy — Ch. 11
- personal diary — Ch. 26
- personal indemnity — Ch. 34
- Personnel hoist — Ch. 21
- persuade a person who was not there. — Ch. 33
- Perverse. — Ch. 4
- Pets and children — Ch. 37
- PF is 0.973 but the labor CPI is 0.950 — Ch. 30
- Phantom equity / stock appreciation rights — Ch. 42
- phantom float in everything upstream of it — Ch. 14
- phase — Ch. 14
- phase pull plan — Ch. 27
- Phased turnover — Ch. 14
- Phased turnover means phased everything — Ch. 18
- Phone call — Ch. 26
- photogrammetry — Ch. 35
- Photogrammetry — Ch. 39
- Photograph adjacent property before you begin. — Ch. 26
- Photograph and measure. — Ch. 23
- Photograph everything before it is covered. — Ch. 9
- photographs — Ch. 25
- Photographs — Ch. 26
- Photographs attached to a location and a date — Ch. 39
- Photographs do not exist. — Ch. 36
- physical — Ch. 23
- Physical fatigue — Ch. 20
- Physical interference — Ch. 19
- physical limits — Ch. 21
- pick schedule — Ch. 21
- Pick the topic from the schedule. — Ch. 24
- Piece-rate pay — Ch. 37
- Pipe bursting / lining — Ch. 38
- Pipe jacking / microtunneling — Ch. 38
- Pipelines and underground utility — Ch. 38
- PLA — Ch. 20
- Placement duration — Ch. 21
- placement rate and lift height — Ch. 22
- plan — Ch. 35
- Plan — Ch. 7
- plan north — Ch. 7
- plan quantity — Ch. 38
- Plan quantity versus measured quantity. — Ch. 38
- Plan review and revision log — Ch. 24
- plan width check — Ch. 10
- PlanGrid — Ch. 39
- planholder — Ch. 15
- Planned value (PV) — Ch. 30
- planning — Ch. 23
- Planning — Ch. 25
- plastic shrinkage cracking — Ch. 8
- Platform — Ch. 22
- platform framing — Ch. 8
- Platforms. — Ch. 22
- plug — Ch. 15
- plug number — Ch. 13
- plumbing — Ch. 10
- Plumbing — Ch. 35
- plumbs — Ch. 8
- plus — Ch. 29 33
- plus a named, quantified allowance. — Ch. 12
- plus a realistic allowance for one resubmittal — Ch. 25
- plus accruals — Ch. 28
- plus approved change orders — Ch. 34
- plus data — Ch. 35
- PMP — Ch. 42
- point cloud — Ch. 39
- point type — Ch. 23
- ponding — Ch. 22
- pool — Ch. 42
- Poor billing discipline — Ch. 34
- portable — Ch. 20
- Ports and marine — Ch. 38
- Position — Ch. 41
- Position. — Ch. 31
- Positional authority — Ch. 41
- positive — Ch. 10
- Positive communication before movement — Ch. 21
- Positive-side versus negative-side. — Ch. 9
- Post-occupancy damage by others. — Ch. 9
- post-tensioned (PT) slab — Ch. 8
- Post-tensioning — Ch. 38
- Potholing ahead of the crew — Ch. 38
- pounds-per-cubic-yard factor. — Ch. 12
- Pour and it goes wrong — Ch. 18
- Pre-action — Ch. 10
- Pre-bid meeting and site visit — Ch. 15
- pre-bid RFI and an addendum — Ch. 12
- Pre-blast survey — Ch. 38
- pre-construction condition survey — Ch. 22
- Pre-construction condition surveys. — Ch. 17
- Pre-drywall air sealing and insulation contact — Ch. 37
- Pre-inspect before you call. — Ch. 10
- Pre-inspect with your own people first. — Ch. 9
- pre-installation conference — Ch. 23
- Pre-installation conference — Ch. 26
- Pre-installation conference schedule — Ch. 23
- Pre-lift / critical lift meeting — Ch. 26
- pre-mobilization meeting — Ch. 19
- Pre-pour meeting — Ch. 26
- pre-pour walk — Ch. 10
- Pre-stage board on level 2 before the crush. — Ch. 18
- pre-task plan (PTP) — Ch. 24
- Pre-task plan and toolbox talk — Ch. 24
- Pre-task plan completion — Ch. 24
- Precast concrete — Ch. 8
- Precast concrete. — Ch. 22
- Precast girder erection — Ch. 38
- precaution class — Ch. 18
- Precedence analysis — Ch. 7
- precision illusion. — Ch. 12
- Preconditions before you open your mouth. — Ch. 41
- Preconstruction / buyout phase — Ch. 37
- Preconstruction meeting — Ch. 17 26
- Preconstruction services — Ch. 11
- Predict and price change — Ch. 14
- predictable schedules — Ch. 20
- Predictive analytics on safety and quality data — Ch. 39
- predominant purpose — Ch. 16
- Prefunctional checklists — Ch. 40
- preinstallation conference — Ch. 25
- Preparatory work — Ch. 20
- Prepare the two-minute close. — Ch. 15
- Prequalification — Ch. 11 16 2 5
- Prequalification is a safety program. — Ch. 16
- Prequalification thresholds — Ch. 19
- Prequalify on the right things. — Ch. 19
- prerequisite — Ch. 36
- Prerequisite work (21). — Ch. 27
- Prerequisite work complete — Ch. 27
- Prerequisite work not complete — Ch. 27
- Prescriptive (descriptive) — Ch. 7
- Prescriptive path — Ch. 36
- Present. — Ch. 37
- president or chief operating officer — Ch. 42
- pressure — Ch. 21
- Pressure class. — Ch. 10
- Pressure relationships — Ch. 10 40
- Pressure relationships. — Ch. 10
- Pressuring a crew — Ch. 24
- Prevailing wage — Ch. 1 5
- Prevailing wage pushes labor cost up. — Ch. 2
- Prevailing wage. — Ch. 38
- prevailing-wage — Ch. 20
- prevailing-wage law — Ch. 20
- Prevention — Ch. 23
- Preventive maintenance on a schedule — Ch. 21
- Pri Sethi — Ch. 1
- Pri Sethi, Meridian — Ch. 25
- price — Ch. 15 19
- Price certainty, and when you get it — Ch. 3
- Price discovery is real. — Ch. 3
- price idle time honestly. — Ch. 12
- Price is hard to test. — Ch. 3
- price list — Ch. 37
- price mobilization separately and explicitly. — Ch. 12
- price risk in an estimate — Ch. 20
- Price to the owner — Ch. 31
- price-escalation clause — Ch. 11
- Price-hold periods — Ch. 4
- priced — Ch. 13
- priced scope. — Ch. 12
- Priced subtotal — Ch. 18
- Priced value of the substantiated work — Ch. 31
- prices — Ch. 15
- Pricing method — Ch. 31
- primary and non-contributory — Ch. 5
- Primavera P6 — Ch. 14
- Prime — Ch. 9
- principal — Ch. 5
- print the card — Ch. 41
- Print the summary and check it against paper. — Ch. 13
- priority decision — Ch. 41
- Privacy — Ch. 33
- Privacy and neighbor relations — Ch. 39
- Private — Ch. 41
- private — Ch. 5
- Private invited bid — Ch. 15
- Private invited bid. — Ch. 15
- Private owner — Ch. 2
- private owner — Ch. 2
- Priyanka Sethi — Ch. 4
- pro forma — Ch. 11 2
- Proceed promptly. — Ch. 31
- process — Ch. 35
- Procore — Ch. 39
- Proctor test — Ch. 8
- Procurement and submittal log — Ch. 17
- procurement branch — Ch. 14
- procurement chain — Ch. 14
- procurement criterion. — Ch. 36
- produce a list of work that is genuinely ready — Ch. 27
- Produce five documents. — Ch. 36
- Produce five things. — Ch. 38
- Producing foremen — Ch. 42
- producing things — Ch. 41
- product — Ch. 36
- Product data — Ch. 25
- Product documentation is never collected. — Ch. 36
- Production — Ch. 21
- production — Ch. 21 30 38 39
- Production / tract — Ch. 37
- production arithmetic — Ch. 21
- Production is below the estimate — Ch. 21
- production rate — Ch. 12
- Production rate — Ch. 20
- productive — Ch. 29
- Productive struggle. — Ch. 1 10 11 12 14 15 16 17 19 2 20 21 22 23 24 25 26 27 28 3 30 31 32 33 34 35 36 37 38 4 40 41 42 5 6 7 8 9
- Productivity — Ch. 20 6
- Productivity computed weekly by cost code. — Ch. 28
- Productivity factor — Ch. 20
- productivity factor — Ch. 30
- Productivity is the only one that is a prediction — Ch. 13
- productivity or utilization — Ch. 21
- Productivity rate assumed clear access — Ch. 12
- Productivity variance — Ch. 20
- Professional liability — Ch. 5
- professional standard of care — Ch. 3
- Profit is an accounting opinion about the future — Ch. 32
- Profit on changed work — Ch. 33
- Profit sharing — Ch. 42
- Profit. — Ch. 4
- program — Ch. 34
- Programmed / emphasis — Ch. 24
- Progress — Ch. 32 5
- Progress documentation — Ch. 39
- Progress override — Ch. 29
- Progress override. — Ch. 29
- progress payment — Ch. 32
- Progress this period — Ch. 29
- Progressive and final cleaning — Ch. 13
- Progressive design-build. — Ch. 3
- Progressive verification — Ch. 39
- prohibited — Ch. 21
- Project — Ch. 30
- Project accountant — Ch. 1
- Project bonus — Ch. 42
- project buffer — Ch. 14
- project charter — Ch. 2
- project controls — Ch. 27
- Project controls / scheduler — Ch. 1
- Project controls do not control anything. — Ch. 28
- project data sheet — Ch. 42
- Project directory — Ch. 17
- Project executive / operations manager — Ch. 42
- project float — Ch. 14
- Project float in the baseline — Ch. 14
- Project manager — Ch. 1
- Project manager (PM) — Ch. 42
- Project manager (Ray) — Ch. 18
- Project manager versus superintendent. — Ch. 1
- project manual — Ch. 15 7
- project record — Ch. 26
- Project staff — Ch. 13
- Project total — Ch. 30
- Project, location — Ch. 23
- project-controls instrument — Ch. 41
- Projected net profit on Northgate — Ch. 2
- prompt — Ch. 24
- prompt written notice — Ch. 15
- Prompt written notice — Ch. 38
- Prompt-payment statutes — Ch. 32
- promptly report — Ch. 7
- proof — Ch. 15
- Proof the condition caused increased cost or time — Ch. 38
- Property-line verification — Ch. 17
- Proposal Request — Ch. 25
- Proposed disposition — Ch. 23
- Proposed resolution — Ch. 7
- proposed resolution — Ch. 7
- proposes a resolution with a reason — Ch. 25
- proposes an answer — Ch. 7
- prospective — Ch. 29
- protect water first. — Ch. 9
- Protected species and habitat — Ch. 38
- protected time — Ch. 27
- Protection of installed work — Ch. 18
- protects workers — Ch. 22
- prototype — Ch. 37
- Prove entitlement — Ch. 14
- Prove the work fits — Ch. 14
- Proving the work fits in the time. — Ch. 27
- Proximate — Ch. 24
- proximity warning around heavy equipment — Ch. 39
- PSP — Ch. 42
- Public accountability generally. — Ch. 38
- Public agency — Ch. 42
- Public hard bid — Ch. 15
- Public opening — Ch. 15
- Public owner — Ch. 2
- public owner — Ch. 2
- Public procurement law often forbids it outright — Ch. 3
- Public record — Ch. 33
- Public-private partnerships (P3) — Ch. 3
- Publish a ball-in-court report weekly — Ch. 25
- Publish what was learned — Ch. 39
- Pull — Ch. 27
- pull — Ch. 27
- Pull planning session — Ch. 26
- pump truck — Ch. 18
- Punch item — Ch. 23 40
- Punch labor — Ch. 16
- Punched window head, jamb, and sill — Ch. 9
- punching by area at every trade handoff — Ch. 40
- punishment — Ch. 4
- Purchase consumes working capital. — Ch. 22
- purchase order — Ch. 16
- purchasing — Ch. 36
- Purpose — Ch. 24
- Pursuant to the notice provisions of the contract — Ch. 26
- Pursue — Ch. 15
- Pursue formally. — Ch. 33
- Push — Ch. 27
- Push for partial or interim approvals — Ch. 31
- Put the float report next to it. — Ch. 30
- puts schedule and cost on the record — Ch. 7
- PV curve — Ch. 30
- PVC — Ch. 9
- QBS / best value — Ch. 15
- qualifications alone — Ch. 3
- qualifications and assumptions page — Ch. 11
- Qualifications and clarifications — Ch. 11
- QUALIFICATIONS AND CLARIFICATIONS — Ch. 15
- Qualifications and Clarifications. — Ch. 15
- qualifications page — Ch. 15
- Qualifications-based selection. — Ch. 15
- qualified person — Ch. 24
- Quality — Ch. 42
- Quality and inspections. — Ch. 37
- Quality Assurance — Ch. 7
- quality assurance — Ch. 7
- Quality assurance (QA) — Ch. 23
- Quality control (QC) — Ch. 23
- Quality control and testing — Ch. 13
- Quality control. — Ch. 39
- Quality is conformance to the contract documents. — Ch. 23
- Quality is not inspection. — Ch. 23
- quality management plan — Ch. 23
- Quality plan / inspection and test plan — Ch. 17
- quantifies — Ch. 23
- quantifies the impact without threatening — Ch. 25
- Quantities — Ch. 12
- quantities — Ch. 25
- Quantities installed — Ch. 26
- Quantity — Ch. 20
- quantity — Ch. 38
- Quantity and extent affected — Ch. 23
- Quantity remaining. — Ch. 28
- quantity takeoff — Ch. 12
- Quantity variation — Ch. 6
- Quantity variation clause — Ch. 38
- quantity variation clause — Ch. 38
- quantum — Ch. 33
- quench vent — Ch. 10
- Question — Ch. 25
- Question period — Ch. 15
- question period — Ch. 15
- Question. — Ch. 7
- queuing — Ch. 37
- Quick ratio — Ch. 34
- R-13 — Ch. 6
- R-15 — Ch. 22
- R-15 continuous — Ch. 7
- R-27 — Ch. 36
- R-27 nominal — Ch. 36
- R-value — Ch. 7
- radius — Ch. 21
- Rail and transit — Ch. 38
- rainscreen — Ch. 9
- Rainscreen panel — Ch. 9
- raise the tip elevation — Ch. 38
- raising gang — Ch. 14
- Rakers — Ch. 22
- raking shores — Ch. 22
- Ran 39 CD against a 30 CD duration. — Ch. 29
- random process controlled by the agency — Ch. 38
- Rank leveled — Ch. 13
- Rapid or unbalanced placement — Ch. 22
- Rarely — Ch. 5
- Rate — Ch. 18 20
- rate — Ch. 30 37 38
- rate mismatch — Ch. 37
- Rate of placement. — Ch. 22
- Rate or price change — Ch. 21
- Rate variance — Ch. 20
- rating — Ch. 7
- Rating system — Ch. 36
- ratio — Ch. 20
- Raw clash counts are noise. — Ch. 10 35
- Ray Alvarez — Ch. 28
- Ray named his own weakness before Pri found it. — Ch. 31
- **rchitectural, ** — Ch. 7
- Re-commissioning — Ch. 40
- re-estimate the remaining work from scratch — Ch. 28
- Re-inspection requested for 4/18. — Ch. 26
- Re-orient after a long absence — Ch. 24
- re-tagged — Ch. 24
- Read 01 77 00 before you assume. — Ch. 40
- Read Division 01 first and completely. — Ch. 7
- Read every one. — Ch. 25
- read it, and object in writing immediately — Ch. 16
- Read the table. — Ch. 33
- Read these first. — Ch. 4
- Read your actual contract. — Ch. 4
- Read your agreement. — Ch. 40
- Read yours. — Ch. 25
- Reading a productivity factor — Ch. 20
- reading is several times faster than listening — Ch. 26
- READY — Ch. 27
- ready — Ch. 27 37
- Ready-mix arrives every 12 minutes. — Ch. 18
- real apprenticeship — Ch. 20
- Real cost. — Ch. 3
- Real deployments, — Ch. 39
- Real equity — Ch. 42
- Real multi-trade coordination. — Ch. 35
- Real savings to the owner. — Ch. 3
- REAL VE — Ch. 11
- real-estate purchase agreement — Ch. 37
- reality capture — Ch. 26
- Reality capture — Ch. 39
- Reasonable assurance. — Ch. 34
- reasonable care — Ch. 24
- reasonable certainty — Ch. 33
- rebar and anchor-bolt inspection — Ch. 8
- Rebar shop drawings and placing drawings — Ch. 8
- Rebar tying robot — Ch. 39
- Rebar, embed, and sleeve deliveries compress. — Ch. 22
- Rebuild the rate on the actual quantity — Ch. 38
- Recalculate after every step. — Ch. 29
- recalculating after every step — Ch. 29
- Recall your project. — Ch. 4
- receipts curve — Ch. 32
- Receiving and inspection. — Ch. 18
- Recipient and copies — Ch. 33
- recirculation — Ch. 10
- recognized hazards — Ch. 24
- Recommendation to Nadia. — Ch. 2
- Recommended award — Ch. 16
- Reconcile against the previous estimate. — Ch. 13
- reconciled against actual cost — Ch. 4
- Reconstruction is not proof. — Ch. 31
- Record — Ch. 23
- record — Ch. 24 29 41
- Record (as-built) drawings — Ch. 40
- Record drawings — Ch. 25
- record drawings — Ch. 7
- record-creating instrument — Ch. 26
- Recording a lien proves nothing about the merits. — Ch. 5
- recordings — Ch. 40
- Records. — Ch. 31
- Recover stranded fixed cost only — Ch. 38
- Recovery — Ch. 29
- Recovery actions — Ch. 29
- recovery schedule — Ch. 29
- Recruiters, honestly used. — Ch. 42
- Recycled content — Ch. 36
- RED — Ch. 22
- Reduce or restructure the bond-back requirement. — Ch. 19
- Reduce the load. — Ch. 21
- Reduce the radius. — Ch. 21
- reduced — Ch. 4
- reduced scope — Ch. 35
- reduced subcontract value — Ch. 16
- reduces extrusion lead time by 3 weeks — Ch. 16
- reduction — Ch. 40
- Redundancy where the operation is critical. — Ch. 21
- reference building — Ch. 36
- Reference standard — Ch. 7
- Reference the clause. — Ch. 26
- References — Ch. 25
- references — Ch. 7
- Referral — Ch. 24
- refinancing — Ch. 40
- reflected ceiling plans — Ch. 7
- Refrigerant volume and piping grow — Ch. 36
- Refusing reasonable impact costs on principle. — Ch. 31
- Regional or local sourcing — Ch. 36
- Regional Priority — Ch. 36
- Regional variation is enormous. — Ch. 42
- registered apprentice — Ch. 20
- Regulation — Ch. 5
- Regulatory floor — Ch. 24
- Regulatory or code interpretation — Ch. 31
- Regulatory requirements — Ch. 25
- Rehearse with a hostile panel — Ch. 15
- reinforcement — Ch. 8
- Reinforcing and grout. — Ch. 8
- Reinforcing steel placing drawings. — Ch. 25
- REJECT — Ch. 11
- Reject — Ch. 16
- Reject and replace — Ch. 23
- Reject. — Ch. 10
- Rejected — Ch. 25
- REJECTED TOTAL (5 items) — Ch. 11
- REJECTED. — Ch. 26
- Rejected. — Ch. 26
- Relational credibility — Ch. 41
- relationship — Ch. 38
- relationship problem — Ch. 14
- Relationship types. — Ch. 14
- Release / approval gate — Ch. 25
- Release for stripping / reshore removal — Ch. 23
- Release subcontractor retention as scopes finish — Ch. 32
- release the difference promptly. — Ch. 19
- releases in writing — Ch. 23
- reliability chain — Ch. 37
- Reliability credibility — Ch. 41
- reliability credibility — Ch. 41
- reliance — Ch. 34
- Relocation — Ch. 42
- Relocation repayment — Ch. 42
- Relocations and conflicts — Ch. 17
- Remaining cost to complete — Ch. 34
- remaining duration in days, from the data date — Ch. 29
- remaining duration, not elapsed duration. — Ch. 29
- Remaining durations — Ch. 29
- remaining durations — Ch. 29
- Remaining to bill — Ch. 34
- Remaining, attributable to the 23 owner changes — Ch. 31
- Remedy — Ch. 40
- Remobilization — Ch. 31
- Remodel / renovation — Ch. 37
- Remote sites — Ch. 18
- Remove and replace — Ch. 36
- removed — Ch. 22
- removed and replaced — Ch. 38
- removed from the plan — Ch. 27
- Removed. — Ch. 27
- removes — Ch. 39
- removing contingency — Ch. 11
- Removing shores — Ch. 22
- Removing side forms — Ch. 22
- removing the cause — Ch. 37
- Removing the reasons people stand still. — Ch. 19
- rental — Ch. 21
- Rental clocks run on calendar time, not on use. — Ch. 22
- Rental invoice — Ch. 21
- rental purchase option (RPO) — Ch. 21
- rented — Ch. 12
- Repair — Ch. 23
- Repair the ranked list — Ch. 36
- Repeat — Ch. 24
- repeat, sophisticated owner — Ch. 3
- Repeatability Assumption — Ch. 39
- Repetition and a learning curve. — Ch. 39
- replacement work — Ch. 33
- reply all — Ch. 25
- report bad news early, in writing, with a plan. — Ch. 26
- reporting — Ch. 34
- Reporting obligations run to you, on a clock. — Ch. 24
- reports go up — Ch. 24
- Reputation with everyone that customer talks to — Ch. 37
- Request direction. — Ch. 26
- request for information — Ch. 1
- Request for Information — Ch. 25
- Request for Proposal — Ch. 15
- Request for Qualifications — Ch. 15
- Request substitution approval after the fact — Ch. 36
- requested a time extension — Ch. 29
- requested today — Ch. 40
- requested window — Ch. 18
- requests for information — Ch. 26
- required — Ch. 29
- Required approvals — Ch. 23
- required by the contract — Ch. 33
- Required of others — Ch. 29
- Required on site — Ch. 25
- Required training by activity — Ch. 24
- required-on-site date — Ch. 25
- Requiring uncompensated acceleration. — Ch. 19
- Rescue — Ch. 24
- rescue attempt by a coworker — Ch. 24
- rescue plan — Ch. 24
- Resequencing — Ch. 29
- Reservation — Ch. 31
- reservation — Ch. 33
- reservation of rights — Ch. 31
- Reservation. — Ch. 31
- Reserve your rights — Ch. 26
- Reshores are snugged, not jacked. — Ch. 22
- Reshoring. — Ch. 22
- resident engineer — Ch. 38
- Residential — Ch. 2
- residual value — Ch. 22
- Residual value is a forecast, not a fact. — Ch. 22
- Resilience — Ch. 36
- resolve if convenient / route elsewhere — Ch. 35
- resource — Ch. 14
- resource histogram — Ch. 14
- Resource leveling — Ch. 14
- Resource loading — Ch. 14
- Resource logic — Ch. 14
- resource-driven — Ch. 14
- respect expressed as process — Ch. 20
- respirable crystalline silica — Ch. 36
- Respond as a manager, not a clinician. — Ch. 41
- response times in days — Ch. 17
- Responsibility — Ch. 15
- Responsibility matrix — Ch. 23
- responsible — Ch. 15
- Responsible bidder criteria — Ch. 5
- Responsive — Ch. 15
- responsive and responsible — Ch. 15
- responsive, responsible — Ch. 3
- Responsiveness — Ch. 15
- restricted zone — Ch. 22
- Restroom tile samples — Ch. 25
- Retainage — Ch. 32
- Retained logic — Ch. 29
- retained logic or progress override — Ch. 29
- Retained logic. — Ch. 29
- retained physical reference — Ch. 23
- Retention — Ch. 16 19 26 32 4
- retention — Ch. 34
- Retention appears twice, on both sides. — Ch. 34
- Retention bond — Ch. 32
- Retention flows down. — Ch. 32
- Retention is at its maximum — Ch. 32
- Retention is withheld. — Ch. 2
- Retention is your problem. — Ch. 20
- Retention payable — Ch. 34
- Retest — Ch. 36
- retesting — Ch. 36
- Retirement and health — Ch. 42
- retiring uncertainty — Ch. 11
- Retro-commissioning — Ch. 40
- return condition — Ch. 21
- Return on equity — Ch. 34
- Returning this week. — Ch. 25
- Revenue earned to date — Ch. 34
- revenue earned to date — Ch. 34
- Revenue earned to date. — Ch. 34
- Revenue per employee — Ch. 34
- reverse lap — Ch. 9
- Reverse-engineered models — Ch. 35
- Review — Ch. 34
- Review and certification take time. — Ch. 2
- Review point (R) — Ch. 23
- review-and-report obligation — Ch. 6
- reviewed — Ch. 16
- Reviewed — Ch. 25
- Reviewer preference — Ch. 25
- Revise and Resubmit — Ch. 1 25
- Revise and resubmit — Ch. 25
- Revised drawing / reissued sheet — Ch. 25
- revision block — Ch. 7
- Rework — Ch. 18 23
- rework — Ch. 23
- Rework and damage — Ch. 19
- Rework and damage. — Ch. 18
- Rework has nowhere to go. — Ch. 22
- Rewrites. — Ch. 26
- RFI — Ch. 1 19 25
- RFI 112 — Ch. 25 26
- RFI 214 — Ch. 27
- RFI 219 — Ch. 27
- RFI 221 — Ch. 27
- RFI 221 is unanswered — Ch. 27
- RFI process — Ch. 37
- RFI response — Ch. 7
- RFIs — Ch. 3
- Ridgeline Gypsum Supply — Ch. 5
- rigging and suspended-load operation — Ch. 39
- right — Ch. 1
- right of access — Ch. 16
- right to left — Ch. 27
- right-to-cure — Ch. 37
- Rights reserved. — Ch. 26
- rises at GMP conversion — Ch. 3
- Rising means cut, falling means fill. — Ch. 38
- risk — Ch. 1 6 7
- Risk — Ch. 6
- Risk allocation. — Ch. 37
- Risk flows down the pyramid — Ch. 2
- risk group of the adjacent patient population — Ch. 18
- risk management under uncertainty — Ch. 1
- risk management under uncertainty. — Ch. 1
- Risk moves, not work. — Ch. 3
- risk register — Ch. 2
- Risks and issues — Ch. 26
- robotic total station — Ch. 35
- Rock excavation — Ch. 38
- Roddy Vance — Ch. 19
- Roles, responsibilities, and authority — Ch. 24
- rolling documentation file — Ch. 36
- Roof and facade inspection — Ch. 39
- Roof trusses — Ch. 37
- Roof warranty. — Ch. 36
- roofing — Ch. 24
- roofing and structural — Ch. 36
- rooftop air-handling units and chillers — Ch. 11
- Room names, numbers, and finish assignments — Ch. 7
- Root cause — Ch. 23
- Rotate. — Ch. 41
- Rough-terrain (RT) crane — Ch. 21
- roughly 1 in 5 — Ch. 24
- round down — Ch. 27
- Round-trip cycle — Ch. 21
- Rounded and submitted — Ch. 12
- Rounds converge, and you can measure it. — Ch. 10
- Route width. — Ch. 18
- routing conflicts — Ch. 35
- routing-priority convention — Ch. 35
- RSMeans — Ch. 11
- Ruben Ostrowski — Ch. 21
- Run a clean, safe, organized site. — Ch. 41
- Run both checks — Ch. 10
- Run the update both ways once a quarter. — Ch. 29
- Rung 3 — Ch. 19
- Rung 3 and rung 4 are where the value is today. — Ch. 35
- S corporation — Ch. 34
- S-curve — Ch. 14
- Sable Ridge — Ch. 34
- Safety — Ch. 11 16 26 42 6
- safety — Ch. 20 41 6
- Safety alert. — Ch. 1 10 12 13 14 15 17 18 19 2 20 23 24 27 29 30 31 32 34 35 37 38 39 4 40 5 6 7 9
- Safety director — Ch. 1
- safety envelope — Ch. 21
- Safety expectations — Ch. 17
- Safety exposure moved off the ceiling. — Ch. 35
- Safety factor. — Ch. 22
- Safety impact review — Ch. 24
- safety impact review — Ch. 24
- Safety inspection frequency and quality — Ch. 24
- safety is a property of the production system — Ch. 26
- Safety is a property of the production system — Ch. 37
- safety is not a line item. — Ch. 20 21
- Safety is the floor, not a corner. — Ch. 1
- Safety margin — Ch. 24
- safety obligations above the regulatory minimum — Ch. 7
- Safety observations, incidents, and near-misses — Ch. 26
- Safety planning. — Ch. 35
- safety precautions — Ch. 25
- Safety program — Ch. 13
- Safety record — Ch. 13
- Safety records — Ch. 26
- safety risk — Ch. 13
- Safety. — Ch. 8
- sail area matters more than weight. — Ch. 18
- Sales and use tax — Ch. 16
- same — Ch. 38
- Same curve. — Ch. 36
- same day — Ch. 26
- Same day — Ch. 31
- same period of project completion — Ch. 33
- same two numbers — Ch. 14
- Samples — Ch. 25
- samples statistically by lot — Ch. 38
- Sanitary and vent. — Ch. 10
- Sanitation and its placement — Ch. 18
- saw-cutting for MEP penetrations — Ch. 13
- Say it out loud at the pre-construction meeting — Ch. 37
- say nothing — Ch. 41
- Scaffold engineering — Ch. 25
- scaffolds are shared. — Ch. 22
- Scaffolds. — Ch. 24
- scale — Ch. 7
- scan the receiving structure — Ch. 39
- Scan-to-BIM — Ch. 39
- Schedule — Ch. 11 7
- schedule — Ch. 36 7
- Schedule and duty to man — Ch. 16
- schedule and the cost report — Ch. 21
- Schedule commitments — Ch. 17
- schedule driver — Ch. 37
- schedule gate — Ch. 37
- Schedule impact — Ch. 35
- Schedule impact. — Ch. 7
- schedule implication — Ch. 10
- schedule narrative — Ch. 29
- schedule of values — Ch. 13 32 4
- Schedule of values — Ch. 17 28
- schedule pressure index — Ch. 24
- schedule pressure is a hazard. — Ch. 38
- Schedule pressure is a hazard. — Ch. 40 8
- schedule recovery — Ch. 6
- Schedule requirements — Ch. 15
- schedule risk — Ch. 13
- Schedule risk analysis and generative options — Ch. 39
- Schedule status against baseline — Ch. 26
- Schedule training before you need it — Ch. 40
- scheduled — Ch. 30
- scheduled work with a pass/fail — Ch. 36
- scheduled. — Ch. 30
- Schedules — Ch. 7
- schedules — Ch. 7
- Schedules of countable things — Ch. 7
- Scheduling / project controls — Ch. 42
- Scheduling and phasing studies — Ch. 11
- Scheduling and sequencing — Ch. 36
- Scheduling logic — Ch. 39
- Scheduling technique. — Ch. 37
- SCHEMATIC DESIGN ESTIMATE — Ch. 11
- Scissor lift — Ch. 21
- scissor lift — Ch. 24
- scope — Ch. 22 31
- Scope — Ch. 39
- Scope and exclusions — Ch. 16
- scope and outcomes. — Ch. 42
- Scope and standard — Ch. 23
- scope change — Ch. 3
- Scope creep and the relationship — Ch. 37
- scope creep and the relationship — Ch. 37
- SCOPE CUT — Ch. 11
- scope cut made under time pressure — Ch. 11
- Scope gap — Ch. 25
- scope gap — Ch. 25
- Scope gap between trades — Ch. 12
- Scope gaps between subcontracts — Ch. 41
- Scope gaps live between subcontracts — Ch. 19
- scope gaps live between subcontracts — Ch. 19
- scope matrix — Ch. 10
- Scope of cleanup — Ch. 18
- Scope of the change — Ch. 31
- scope reduction — Ch. 11
- scope sheet — Ch. 13 16
- scope sheet failure — Ch. 16
- Scope sheets — Ch. 31
- scored — Ch. 27
- Screen — Ch. 27
- screen — Ch. 27 39
- screen. — Ch. 27
- SDI — Ch. 5
- SDI approach, total — Ch. 16
- sealant joints. — Ch. 9
- seam — Ch. 7
- Searching. — Ch. 18
- Seasonal testing — Ch. 40
- Seat belts — Ch. 21
- Secant / tangent pile wall — Ch. 22
- Secant or tangent pile wall — Ch. 8
- Second — Ch. 37 41
- Second crew, stacked. — Ch. 24
- second identical job. — Ch. 42
- second list of things somebody has to go fix. — Ch. 27
- second shift — Ch. 40
- Second shift. — Ch. 24
- Second, authority. — Ch. 24
- Second, backfill protection. — Ch. 9
- Second, crews C and D collide. — Ch. 38
- Second, information. — Ch. 33
- Second, nobody owns it. — Ch. 9
- Second, tell them exactly where it is — Ch. 31
- Second, test your retrieval. — Ch. 36
- Second, the contract is usually unit price — Ch. 38
- Second, the efficiency loss. — Ch. 20
- Second, the foreman is the whole ballgame. — Ch. 20
- Second, the schedule of values. — Ch. 17
- Second-shift discount — Ch. 29
- Section — Ch. 7
- SectionFormat — Ch. 7
- Sector rotation as a hedge. — Ch. 42
- Security — Ch. 37
- Security and neighbors — Ch. 15
- see note — Ch. 18
- Segmental — Ch. 38
- Segregate it at the time. — Ch. 33
- Segregate the cost — Ch. 38
- segregated and marked storage — Ch. 16
- Selection criteria — Ch. 22
- selections schedule — Ch. 37
- selectivity. — Ch. 34
- Self-assessment. — Ch. 42
- Self-consolidating concrete (SCC). — Ch. 22
- Self-erecting tower crane — Ch. 21
- self-normalizing. — Ch. 20
- self-perform — Ch. 16
- Self-perform changes everything. — Ch. 42
- self-perform content — Ch. 15
- Self-perform direct cost — Ch. 31
- Self-perform operations — Ch. 42
- Self-perform superintendent — Ch. 1
- self-perform the majority of the value — Ch. 38
- self-performs the majority of the dollar value — Ch. 38
- send an email summarizing the call — Ch. 25
- Send one person who can decide. — Ch. 37
- Send the letter. Every time. — Ch. 5
- Send written notice. — Ch. 31
- Senior PM / project executive — Ch. 1
- Senior project manager — Ch. 42
- senior project manager — Ch. 42
- Sep 18, Year 2 — Ch. 10
- Sep 25 — Ch. 32
- Sep 3 — Ch. 32
- Separate fact from position. — Ch. 26
- Separate the report from the conduct. — Ch. 24
- Separation — Ch. 18
- September 15 — Ch. 32
- September 18 — Ch. 24 33 40
- September 18 of Year 2 — Ch. 3
- September 18, Year 2 — Ch. 10 14 29 33 34 36 6
- September 18, Year 2. — Ch. 4
- September 24 — Ch. 40
- September 24 of Year 2 — Ch. 17
- September 24, Year 2 — Ch. 10 4
- September 25, Year 1 — Ch. 32
- September 27, Year 2 — Ch. 30
- September 28, Year 1 — Ch. 16
- September 29, Year 2 — Ch. 24
- September 5 — Ch. 32
- Sequence — Ch. 11
- sequence of operations — Ch. 10
- Sequence validation — Ch. 35
- Sequence validation. — Ch. 35
- sequences — Ch. 8
- Sequencing. — Ch. 36 8
- serial verification chain — Ch. 40
- Serious — Ch. 24
- service — Ch. 10
- services — Ch. 16
- set anchor bolts with a rigid template — Ch. 8
- set of decisions — Ch. 35
- sets — Ch. 35
- Setup. — Ch. 33
- seven or eight minutes — Ch. 15
- seventy days — Ch. 32
- seventy-one days — Ch. 29
- SFCA — Ch. 12
- shape — Ch. 18
- Shared with defined rules — Ch. 14
- shared, consumable asset — Ch. 29
- She owns some of the penetrations. — Ch. 9
- Shear studs — Ch. 8
- sheet number — Ch. 7
- Sheet piling — Ch. 22 8
- SHGC — Ch. 9
- shift to the owner — Ch. 4
- Shift work and night work. — Ch. 20
- shifts — Ch. 33
- Shifts the risk of owner nonpayment — Ch. 32
- shipping/delivery — Ch. 17
- Shop drawings — Ch. 25
- Shop drawings, product data, and samples. — Ch. 7
- Shore release — Ch. 22
- shore-release form — Ch. 22
- Shores in a stack must line up vertically. — Ch. 22
- Shores removed too early or out of sequence — Ch. 22
- Shoring and reshoring — Ch. 25
- Short duration on site — Ch. 37
- Short tons and metric tonnes. — Ch. 12
- short, stated window to object — Ch. 38
- Short-interval / look-ahead — Ch. 14
- shortened pay cycle — Ch. 16
- Show me the self-perform productivity factors. — Ch. 28
- shows up in your WIP schedule — Ch. 4
- Shrinkage — Ch. 12
- Shrinkage factor — Ch. 8
- Sign-off authority and what sign-off means — Ch. 35
- Sign-off is a document. — Ch. 10
- signal — Ch. 41
- Signed the same day — Ch. 26
- silence — Ch. 20
- Silence is agreement. — Ch. 26
- Silica — Ch. 5
- Silica, noise, and heat — Ch. 38
- Silica. — Ch. 9
- Simultaneity Trap — Ch. 39
- single — Ch. 34
- single named person — Ch. 26
- single stream change — Ch. 36
- Single-family — Ch. 2
- single-project cap — Ch. 34
- Single-project limit — Ch. 34
- single-project or aggregate bonding capacity — Ch. 15
- Single-source components. — Ch. 16
- site — Ch. 24
- Site conditions for cranes. — Ch. 8
- site earthwork — Ch. 38
- site knowledge — Ch. 24
- Site logistics and lift studies — Ch. 11
- Site logistics and phasing. — Ch. 35
- Site logistics plan — Ch. 17
- Site logistics planning — Ch. 39
- Site restoration — Ch. 40
- Site rules — Ch. 17
- site utilities — Ch. 38
- Site utilities are delivered at 500. — Ch. 35
- site work — Ch. 37
- Site work does not go away. — Ch. 37
- Site-specific logistics safety — Ch. 24
- site-specific safety plan — Ch. 17
- Site-specific safety plan — Ch. 24
- site-specific safety plan (SSSP) — Ch. 24
- sitework and foundations — Ch. 17
- six — Ch. 24
- Six 10-hour days. — Ch. 24
- six elevated floors — Ch. 36
- six elevated floors at 16,500 SF each — Ch. 22
- Six failure modes and their fixes. — Ch. 6
- six more work days — Ch. 14
- Six of the fifteen are due before NTP — Ch. 17
- Six things to carry out of this chapter. — Ch. 29
- six to seven times — Ch. 38
- six to ten codes — Ch. 28
- six-foot-wide primary route — Ch. 18
- six-mile — Ch. 21
- six-week look-ahead — Ch. 14
- sixty houses a year — Ch. 37
- sixty-eight — Ch. 14
- Sixty-one cubic yards. — Ch. 20
- Sixty-two days from the beam to the check — Ch. 32
- size — Ch. 11
- size test used as a proxy for a competence test. — Ch. 19
- size, scope, and a result — Ch. 42
- Size. — Ch. 10
- Skew. — Ch. 6
- Skip a step and you may impair the bond. — Ch. 5
- Slab on grade also involves — Ch. 8
- Sleeves and firestopping — Ch. 10
- Sleeves and penetrations — Ch. 16
- Slide-in bridge construction — Ch. 38
- Slip forms — Ch. 22
- Slips, trips, and falls on the same level. — Ch. 18
- Sloping / benching — Ch. 22
- Sloping and benching — Ch. 8
- Slow crew D — Ch. 38
- Slow to decide, and prone to changing decisions — Ch. 37
- Slump — Ch. 8
- Slurry (diaphragm) wall — Ch. 8
- Small contractor — Ch. 42
- Small crews, no safety program — Ch. 37
- small denominators are noisy — Ch. 28
- Small denominators lie. — Ch. 30
- Small reciprocities. — Ch. 41
- Small tools and consumables — Ch. 12
- Sofia Marchetti — Ch. 42
- soft — Ch. 14 36
- Soft (preferential) logic — Ch. 14
- soft clash — Ch. 10
- Soft clash — Ch. 35
- soft clash with a code dimension attached — Ch. 35
- Soft subtotal — Ch. 36
- software — Ch. 37
- Soil classification governs the allowable slope — Ch. 22
- Soil evidence — Ch. 15
- Soil nailing — Ch. 8
- Soldier pile and lagging — Ch. 22 8
- some are as short as 48 or 72 hours — Ch. 33
- Some states have none at all. — Ch. 5
- Some states have none. — Ch. 20
- somebody being somewhere dangerous. — Ch. 39
- Sophisticated subs will refuse — Ch. 32
- sort all 1,200 into the four categories — Ch. 40
- sort the list first. — Ch. 23
- Sort the list first. — Ch. 40
- Sort, Set in order, Shine, Standardize, Sustain — Ch. 27
- source — Ch. 31
- Source — Ch. 40
- Source control — Ch. 36
- Source separation. — Ch. 36
- Space and access — Ch. 27 41
- Spearin doctrine — Ch. 3 5
- Spec — Ch. 37
- special inspection record — Ch. 40
- Special inspector — Ch. 23
- special provisions — Ch. 38
- specialization — Ch. 20
- Specialty (needle beam, outrigger, bracket) — Ch. 22
- Specialty exhaust — Ch. 10
- Specialty trade contractor — Ch. 42
- Specific and factual — Ch. 41
- specific to this elevation — Ch. 24
- specification — Ch. 36 7
- specification and submittal item — Ch. 35
- Specifications — Ch. 4 7
- specified — Ch. 36
- specified in-place strength — Ch. 23
- specified strength — Ch. 22
- Specify strength at 56 or 90 days instead of 28 — Ch. 36
- Speed up crew C through the rock — Ch. 38
- Spending the largest sum of their life — Ch. 37
- SPI — Ch. 30
- SPI is not schedule. — Ch. 30
- split the activities by area — Ch. 29
- split the crew — Ch. 37
- splitting the disputed activities by area — Ch. 29
- Spoil, equipment, and material must be set back — Ch. 8
- sprawl and double handling — Ch. 18
- spread — Ch. 15
- Spread (isolated) footing — Ch. 8
- Sprinkler — Ch. 35
- Sprinkler mains — Ch. 10
- SPT blow count (N-value) — Ch. 8
- SPT blow counts (N-values) — Ch. 8
- Square feet of slab to cubic yards. — Ch. 12
- Square feet to square yards. — Ch. 12
- Stability before release. — Ch. 8
- stable property of how we build — Ch. 24
- Staff subtotal — Ch. 13
- Stage walk at each milestone — Ch. 37
- staged in the mockup room, not the hoist lobby — Ch. 18
- Staging and crane — Ch. 15
- standard drawings — Ch. 38
- standard of quality — Ch. 9
- standard specifications — Ch. 38
- standby — Ch. 33
- Standby and idle cost — Ch. 13
- standby rates are lower than operating rates — Ch. 33
- standing in front of it — Ch. 23
- standing neutral — Ch. 33
- Standing water. — Ch. 22
- standpipe — Ch. 10
- start — Ch. 40
- Start and end on time — Ch. 26
- Start at the required-on-site date. — Ch. 25
- start dates tied to substantial completion — Ch. 40
- Start No Earlier Than (SNET) — Ch. 14
- Start No Later Than (SNLT) — Ch. 14
- start three more houses — Ch. 37
- Start-to-Finish — Ch. 14
- Start-to-Start — Ch. 14
- started — Ch. 27
- Starting from the baseline — Ch. 29
- starting it earlier — Ch. 40
- starts — Ch. 4
- starving legitimate risk response — Ch. 6
- state or local jurisdiction adopts — Ch. 36
- State plans may set lower triggers. — Ch. 24
- State the effective date — Ch. 11
- State the event and its date. — Ch. 26
- State the impact — Ch. 26
- stated design wind speed — Ch. 22
- stated explicitly — Ch. 17
- Stated hierarchy — Ch. 7
- stated, testable, and owned. — Ch. 12
- statement of compliance — Ch. 20
- Statement of position — Ch. 31
- statement of special inspections — Ch. 23
- states the actual measurement — Ch. 25
- states the conflict without arguing — Ch. 7
- states which one it used on each line. — Ch. 28
- static water penetration — Ch. 9
- status — Ch. 26
- Status — Ch. 27 7
- Status distributed — Ch. 26
- Statute — Ch. 5
- statute of limitations — Ch. 40
- statute of repose — Ch. 40
- Stay-in-place metal deck — Ch. 22
- stays open — Ch. 7
- Steel erection — Ch. 17
- steel erection — Ch. 24 29
- steel erection start slipped 23 calendar days — Ch. 40
- Steel erection. — Ch. 22
- Steel laydown — Ch. 17
- steering a distribution — Ch. 11
- Step 2 needs a definition. — Ch. 29
- Step 6 is where the money and the danger meet. — Ch. 22
- Step-down — Ch. 32
- Stick-built — Ch. 9
- Still costs money. — Ch. 12
- still present — Ch. 30
- stipend — Ch. 15 3
- stipulated sum — Ch. 4
- Stockpile measurement — Ch. 39
- Stockpiling — Ch. 18
- stockpiling is correct — Ch. 18
- stop — Ch. 4
- Stop at 17. — Ch. 29
- stop shipping — Ch. 5
- Stop the cover. — Ch. 23
- Stop this specific wall. — Ch. 7
- stop work and notify — Ch. 6
- Stop-work authority — Ch. 24
- stop-work authority named out loud — Ch. 41
- Stop. — Ch. 38
- Storage — Ch. 16
- Storage and inter-job transport. — Ch. 21
- stored materials — Ch. 32
- stored on site. — Ch. 39
- Storefront — Ch. 9
- Storm. — Ch. 10
- Stormwater — Ch. 5
- Stormwater and low-impact development. — Ch. 36
- Stormwater discharge from the site — Ch. 38
- stormwater permit issued — Ch. 17
- Stormwater Pollution Prevention Plan — Ch. 17
- stormwater pollution prevention plan (SWPPP) — Ch. 36
- strategic pursuit — Ch. 15
- Stripping — Ch. 8
- Stripping and reshoring — Ch. 8
- Strong — Ch. 33
- stronger than a measured mile — Ch. 31
- Struck by falling object — Ch. 24
- Struck by flying object — Ch. 24
- Struck by swinging / hoisted load — Ch. 24
- Struck by vehicle / mobile equipment — Ch. 24
- struck-by — Ch. 21
- Struck-by — Ch. 24
- Struck-by heavy equipment — Ch. 38
- Struck-by. — Ch. 18 8
- structural — Ch. 10
- structural and fixable — Ch. 20
- Structural capacity. — Ch. 36
- Structural engineer — Ch. 1
- Structural fill and rock. — Ch. 15
- structural performance — Ch. 9
- Structural steel — Ch. 36 8
- structural steel frame — Ch. 36
- structurally produces gaps — Ch. 16
- structure — Ch. 12
- Structure — Ch. 22 35
- structure and enclosure — Ch. 17
- Structure the SOV to be billable — Ch. 32
- subcontract — Ch. 16 28
- Subcontract awarded by Jun 9, Year 1 — Ch. 10
- Subcontracted direct cost — Ch. 31
- Subcontracted work — Ch. 31
- Subcontractor — Ch. 1
- Subcontractor bonds — Ch. 5
- Subcontractor collusion — Ch. 15
- Subcontractor coordination meeting — Ch. 26
- Subcontractor default — Ch. 6
- subcontractor default insurance — Ch. 19 6
- Subcontractor default insurance (SDI) — Ch. 16
- Subcontractor Default Insurance (SDI) — Ch. 5
- subcontractor exception — Ch. 5
- subcontractor expectation memo — Ch. 19
- Subcontractor kickoff — Ch. 26
- Subcontractor kickoff meeting(s) — Ch. 17
- Subcontractor Management Plan — Ch. 19
- Subcontractor market outreach — Ch. 11
- subcontractor performance and payment bond — Ch. 16
- Subcontractor requirements and flow-down — Ch. 24
- Subcontractors — Ch. 36
- Subcontractors price a known shopper higher. — Ch. 13
- Subcontracts and quotes — Ch. 12
- Submission — Ch. 15
- Submit on time, every time — Ch. 32
- submittal — Ch. 22
- Submittal 08-1200-C — Ch. 27
- submittal and fabrication lead time — Ch. 9
- Submittal deadlines — Ch. 17
- submittal due date — Ch. 25
- submittal lead time — Ch. 8
- Submittal log — Ch. 37
- submittal of the COR — Ch. 31
- Submittal or approval — Ch. 27
- submittal-due-from-sub date — Ch. 17
- Submittal-to-installation chain — Ch. 23
- Submittals — Ch. 7
- submittals — Ch. 7
- Submittals and approvals — Ch. 27
- Submittals and RFIs visible to the field — Ch. 39
- Submittals and scheduling — Ch. 13
- substance use disorder — Ch. 41
- substantial completion — Ch. 1 16
- Substantial completion — Ch. 10 4 40
- SUBSTANTIAL COMPLETION — Ch. 40
- Substantial completion (SC) — Ch. 40
- substantial completion September 18 — Ch. 40
- substantial completion within 26 months of award — Ch. 3
- substantial deductible — Ch. 5
- Substantially complete 3 years ago — Ch. 11
- substitution request — Ch. 11
- Subsurface utility engineering (SUE) — Ch. 38
- Subsurface. — Ch. 11
- Subtotal — Ch. 1 11 12 13 28 3 31 4
- Subtotal before bond — Ch. 12
- Subtotal before contingency — Ch. 28
- Subtotal direct cost — Ch. 38
- Subtotal E — Ch. 11
- Subtotal F — Ch. 11
- Subtotal, direct cost — Ch. 9
- Subtotal, five jobs — Ch. 2
- Subtotal, these four items — Ch. 4
- Subtract delivery time. — Ch. 25
- Subtract fabrication or manufacturing time — Ch. 25
- Subtract installation lead. — Ch. 25
- Subtract the approval cycle — Ch. 25
- Success criterion (pre-registered) — Ch. 39
- sue Kessler — Ch. 5
- Sum every column two ways. — Ch. 13
- Sum of expected durations — Ch. 6
- Sum of most-likely durations — Ch. 6
- sump pumping — Ch. 8
- Sumps and open pumping — Ch. 22
- Superintendent — Ch. 1 20 42
- Superintendent (Margo) — Ch. 18
- Supervision dilution — Ch. 29
- Supervision ratio. — Ch. 20
- Supplementary cementitious materials (SCMs) — Ch. 36
- Supplementary conditions — Ch. 4 7
- Supplementation — Ch. 19
- Supplier / fabricator — Ch. 1
- Suppliers and fabricators — Ch. 2
- supply — Ch. 41
- Support functions do not scale. — Ch. 20
- Sureties — Ch. 2
- Surety — Ch. 1
- surety — Ch. 16 5
- surety bond — Ch. 34
- Survey control — Ch. 18
- Surveying — Ch. 13
- Suspended (swing) scaffolds — Ch. 9
- Suspended (two-point swing stage) — Ch. 22
- Suspension — Ch. 4
- suspension of the work — Ch. 6
- Suspension of work — Ch. 33
- Suspension trauma — Ch. 24
- Sustainable Sites — Ch. 36
- sustained — Ch. 29
- Sweeping — Ch. 18
- Swell — Ch. 12
- Swell factor — Ch. 8
- Swing-radius barricading — Ch. 21
- SWPPP — Ch. 17 5 8
- SWPPP permit issued — Ch. 17
- SY at plan thickness — Ch. 38
- symptom — Ch. 19
- system — Ch. 14 24 31 7
- System / modular — Ch. 22
- System / NDL warranty — Ch. 9
- system and building element — Ch. 7
- System cost per LCY — Ch. 21
- System cost per loose cubic yard — Ch. 21
- Systemic — Ch. 24
- Systems testing — Ch. 23
- T&M ticket TM-0141 opened. — Ch. 26
- TAB — Ch. 10
- TAB complete — Ch. 40
- TAB report issued and reviewed — Ch. 40
- TAB report not issued — Ch. 40
- tacky mats — Ch. 18
- tag — Ch. 22
- Taiichi Ohno — Ch. 27
- Take off in the order the work gets built. — Ch. 12
- Take the second crew — Ch. 29
- Takeover — Ch. 5
- takes — Ch. 15
- Takt — Ch. 27
- Takt time planning — Ch. 27
- talk itself delivered in the language of the crew — Ch. 24
- tapered — Ch. 9
- Tapered insulation — Ch. 9
- Target level drives it nonlinearly. — Ch. 36
- Target price / target value delivery. — Ch. 4
- Target Value Design (TVD) — Ch. 11
- target value design (TVD) — Ch. 27
- Target value design. — Ch. 3
- TCO on September 17 — Ch. 40
- TCPI — Ch. 30
- TCPI to BAC — Ch. 30
- Teach-back — Ch. 24
- Teach-back is the highest-value item on that list — Ch. 41
- Technical brilliance without communication. — Ch. 42
- techniques of construction and installation — Ch. 25
- technology — Ch. 10
- technology adoption plan — Ch. 39
- Telehandler — Ch. 21
- Telematics — Ch. 21
- Tell people what to do next — Ch. 14
- Tell Wei Chen today — Ch. 27
- Temperature. — Ch. 22
- temporary bracing — Ch. 22
- Temporary bracing — Ch. 25
- temporary capping and testing — Ch. 16
- Temporary certificate of occupancy issued — Ch. 40
- temporary coalition — Ch. 39
- Temporary columns and posts — Ch. 22
- Temporary enclosure — Ch. 22
- Temporary facilities and utilities — Ch. 13
- Temporary facilities removal — Ch. 40
- Temporary heat — Ch. 18 22
- Temporary lighting. — Ch. 18
- Temporary or conditional CO (TCO) — Ch. 40
- Temporary power and GFCI discipline. — Ch. 18 24
- Temporary power discipline. — Ch. 10
- temporary power permit — Ch. 40
- Temporary protection — Ch. 13 16
- Temporary protection comes off. — Ch. 40
- Temporary utilities — Ch. 16 17
- temporary utilities beyond the trailer — Ch. 17
- Temporary utilities transfer — Ch. 40
- Temporary work — Ch. 35
- ten — Ch. 7
- Ten minutes on day nine — Ch. 33
- Ten things to check before anyone mobilizes — Ch. 5
- ten to fifteen minutes — Ch. 26
- ten to twenty times working capital — Ch. 34
- ten-hour days, six days a week — Ch. 20
- Tender — Ch. 5
- Termination and supplementation — Ch. 16
- Termination for cause — Ch. 4
- Termination for convenience — Ch. 4
- Tessa Bright Homes — Ch. 37
- Test and balance, air and water — Ch. 40
- Test and inspection reports — Ch. 40
- Test each option against the whole problem — Ch. 10
- Test the forecast with TCPI. — Ch. 30
- tested, listed assembly — Ch. 7
- Testing — Ch. 23
- Testing and inspection — Ch. 16
- Testing and inspection reports — Ch. 26
- tests — Ch. 35
- Text message — Ch. 26
- that day — Ch. 31
- That is a 16.5 percent difference — Ch. 20
- That is a good job — Ch. 42
- That is achievable — Ch. 30
- That is the whole instrument. — Ch. 41
- That is the whole lesson of this section. — Ch. 36
- That is what a root cause looks like. — Ch. 23
- That is why the meeting matters. — Ch. 26
- That is wrong. — Ch. 37
- That lease expires October 1, Year 2. — Ch. 29
- That method cannot produce an overrun. Ever. — Ch. 28
- That ratio is the lesson. — Ch. 28
- That was the defect. — Ch. 29
- That works. — Ch. 20
- the 20th — Ch. 32
- the 25th — Ch. 32
- The ability to bid at all. — Ch. 24
- the absence of a recorded injury — Ch. 24
- The actual costs were reasonable. — Ch. 33
- The agenda went out before, and it is followed. — Ch. 41
- The agenda. — Ch. 19
- The aging report. — Ch. 25
- The agreement — Ch. 15 7
- The AHJ final inspections and life-safety walk — Ch. 40
- The AHJ is not your adversary. — Ch. 1
- The airside. — Ch. 10
- The allowances are guesses. — Ch. 3
- The amendments are where people get hurt. — Ch. 2
- The answer is no, until you have the paper. — Ch. 22
- The anticipated effect — Ch. 33
- The arithmetic that frames it. — Ch. 15
- The arithmetic you must be able to do cold — Ch. 37
- The assignment. — Ch. 40
- The assumptions. — Ch. 12
- The authority — Ch. 41
- The back-check capacity. — Ch. 40
- The bad RFI. — Ch. 25
- The balanced bid — Ch. 4
- The ball-in-court report. — Ch. 25
- The batch ticket and the placement record. — Ch. 23
- The bathroom and kitchen plan — Ch. 37
- The bid leaves early. — Ch. 13
- The bid or estimate was realistic. — Ch. 33
- The bid total does not move. — Ch. 38
- The big one. — Ch. 36
- The billing cycle is monthly, not continuous. — Ch. 2
- The bottom of the stack matters. — Ch. 22
- The budget was never tested — Ch. 11
- the budgeted value of 48,000 CY. — Ch. 30
- The buffer gets consumed silently — Ch. 6
- The builder finances the gap. — Ch. 37
- the builder is the owner. — Ch. 37
- the building — Ch. 37
- The building is now energized for real. — Ch. 40
- The building permit — Ch. 17
- The burden multiplier. — Ch. 11
- The burdened-rate checklist — Ch. 20
- The burdened-rate trap. — Ch. 31
- The cascading markup problem. — Ch. 31
- The cast. — Ch. 1
- The Certificate of Insurance (COI). — Ch. 5
- the change since the last accepted update — Ch. 29
- the change was built before it was priced — Ch. 1
- The change. — Ch. 31
- The chart is not a target. — Ch. 21
- The City — Ch. 4
- The City pays — Ch. 4
- The claim and the defense were the same document. — Ch. 33
- The classification is stale. — Ch. 22
- the clause — Ch. 4
- The clause is an unenforceable penalty — Ch. 33
- The clean handoff. — Ch. 19
- The clock starts earlier than you think. — Ch. 33
- The CM who inflates the early budget. — Ch. 11
- The cold joint. — Ch. 18
- The commitment is enforceable. — Ch. 38
- The comp bar. — Ch. 5
- The completed-contract method. — Ch. 34
- The compound clock — Ch. 1
- The concept. — Ch. 33
- the conflict is almost never about personality — Ch. 41
- The conflict. — Ch. 9
- The conflicts that never existed. — Ch. 35
- The constraint — Ch. 41
- The contingency is visible — Ch. 3
- The contract documents — Ch. 7
- The contract is part of that system. — Ch. 4
- the contract must say which — Ch. 5
- The contract provision — Ch. 33
- the contract sets the percentages. — Ch. 31
- The contract type — Ch. 3
- The contract usually dictates the path — Ch. 33
- the contractor — Ch. 10
- the contractor is absorbing scope silently — Ch. 31
- The contractor was not responsible — Ch. 33
- The control budget — Ch. 28
- The control network — Ch. 17
- The controlling employer — Ch. 19
- The controlling path — Ch. 29
- The conversions you must know cold — Ch. 8
- The coordination obligation. — Ch. 19
- The coordination touch — Ch. 18
- The core structure of any work zone — Ch. 38
- The corrected triangle. — Ch. 1
- The correcting employer — Ch. 19
- The correction period — Ch. 40
- The corridor above the ceiling — Ch. 10
- The cost of time itself — Ch. 12
- The cost trend, decisively. — Ch. 30
- The cost-code structure. — Ch. 17
- The counterpoint, which is also true. — Ch. 36
- The CPM procedure, complete, on one page. — Ch. 14
- The craft workforce — Ch. 1
- The craft workforce is aging. — Ch. 2 20
- The craft workforce is the row people forget. — Ch. 1
- The crane — Ch. 18
- The creating employer — Ch. 19
- The credential — Ch. 42
- The credibility of the method is the damages. — Ch. 33
- The crew is under more pressure — Ch. 22
- The crew waiting on it is four line items, — Ch. 39
- The crews are the same crews. — Ch. 37
- The critical path moved. — Ch. 14
- The critical path moves. — Ch. 14
- The criticism. — Ch. 36
- The daily huddle. — Ch. 24
- The daily operator inspection — Ch. 21
- the daily quantity report completion rate. — Ch. 20
- The data date — Ch. 30
- the data, not the geometry. — Ch. 35
- The deadline for reporting — Ch. 41
- The decision that keeps getting deferred. — Ch. 26
- The definition. — Ch. 1
- The delay clause and its flow-down. — Ch. 19
- The delay taxonomy. — Ch. 29
- The delivery method — Ch. 3
- The delivery request form — Ch. 18
- The design itself — Ch. 36
- The design professional in writing — Ch. 23
- The design professional of record, in writing — Ch. 23
- The designer who under-designs to hit a number. — Ch. 11
- The designer. — Ch. 7
- The diagnostic order when a labor code goes bad — Ch. 20
- The dignity provisions. — Ch. 41
- The direct cost. — Ch. 39
- The direct costs of an injury — Ch. 24
- The disaster avoided — Ch. 39
- The Displaced Burden — Ch. 39
- The distribution by trade. — Ch. 40
- The distribution matrix. — Ch. 17
- The document — Ch. 12
- The documentation package — Ch. 36
- The documentation vocabulary you need. — Ch. 36
- The dollar value of the error. — Ch. 35
- The door clock — Ch. 1
- The duct gives way. — Ch. 35
- The economic loss rule — Ch. 5
- The economics are not close. — Ch. 32
- The eight constraint categories — Ch. 27
- The eight rules — Ch. 23
- The eight rules of reading a set — Ch. 7
- The eight things worth remembering. — Ch. 16
- The electrical room — Ch. 10
- The elevator certificates — Ch. 40
- The elevator subcontractor pulled its field crew — Ch. 33
- the energy model used — Ch. 36
- the engineer, not you and not the lab. — Ch. 23
- the entire closeout ran with zero float — Ch. 40
- The estimate — Ch. 28
- The ethical line, stated precisely. — Ch. 32
- The event or condition — Ch. 33
- The event. — Ch. 26
- the excavator governs and never waits on a truck. — Ch. 38
- The exceptions have a name and a date. — Ch. 19
- The execution plan decides whether any of it pays — Ch. 35
- The exposing employer — Ch. 19
- the extended-GC number is the one people forget — Ch. 1
- The factory needs continuous volume. — Ch. 37
- The fee — Ch. 4
- The fee is disclosed — Ch. 3
- The fee is largely earned. — Ch. 40
- the fee is not the profit — Ch. 2
- The feedback is immediate and physical. — Ch. 42
- The field mockup — Ch. 9
- The field of the membrane almost never leaks. — Ch. 9
- The final payment clause. — Ch. 40
- The financial reference card. — Ch. 34
- The finish-to-start assumption — Ch. 27
- the finishing of it — Ch. 40
- The fire alarm final acceptance test — Ch. 40
- The fire chief. — Ch. 3
- The first and third are staffing decisions — Ch. 41
- The first build determines the second. — Ch. 11
- The first house of a new plan. — Ch. 37
- The five defects that make float disappear. — Ch. 14
- The five formulas — Ch. 20
- The five layers of a change order price. — Ch. 31
- The five money buckets, one line each. — Ch. 6
- The five segments and their governing risk — Ch. 37
- The five sentences worth memorizing. — Ch. 14
- The five-foot line. — Ch. 7
- The five-minute rating — Ch. 20
- The five-question test for any risk row. — Ch. 6
- The fix is a one-page rental log — Ch. 21
- The fix is a one-page revision log per community — Ch. 37
- The fix is not to work harder in the last month. — Ch. 40
- The fixed constraints — Ch. 17
- The floor line at the CMU-to-wood-frame change — Ch. 9
- the foreman learns that the plan is fiction. — Ch. 27
- The foremen and superintendents — Ch. 29
- The form matters. — Ch. 31
- The four clocks, for triage. — Ch. 1
- The four conditions. — Ch. 27
- The four dispositions and who signs — Ch. 23
- The four estimates at completion — Ch. 30
- The four formulas. — Ch. 12
- The four lines. — Ch. 15
- The four numbers to carry in your head. — Ch. 6
- The four questions every owner is really asking. — Ch. 15
- The four rules that fix a meeting — Ch. 26
- The four sentences. — Ch. 1
- The four sources of leverage, in order. — Ch. 19
- The four sources, and who can change each — Ch. 5
- The four-word system. — Ch. 27
- The framework, in five questions. — Ch. 21
- The framework, in one table. — Ch. 33
- The garage. — Ch. 15
- The gas scope shrinks or disappears. — Ch. 36
- The gating list. — Ch. 25
- The GC. This becomes general conditions. — Ch. 13
- The genuine cost is complexity and financing — Ch. 3
- The genuine value is life-cycle alignment — Ch. 3
- The GMP proposal — Ch. 11
- The go/no-go model. — Ch. 15
- The good RFI. — Ch. 25
- the grease waste line and interceptor — Ch. 16
- The gym ceiling — Ch. 10
- The gymnasium roof-to-wall and parapet — Ch. 9
- The habit to start now. — Ch. 3
- The hardest date on the job. — Ch. 38
- The healthy packages. — Ch. 30
- The heavy-civil example. — Ch. 8
- The hiring hall and referrals. — Ch. 20
- The honest assessment. — Ch. 3
- The honest counterargument — Ch. 24
- the hours are not the commitment. — Ch. 41
- The hours are real. — Ch. 42
- the house — Ch. 37
- The idle-equipment trap. — Ch. 31
- The impact statement — Ch. 25
- The impact to date. — Ch. 26
- The indirect costs — Ch. 24
- The industry in six facts — Ch. 2
- The injunction is the risk. — Ch. 21
- The inspection. — Ch. 18 9
- the instruction traveled outside a contract line. — Ch. 1
- The insurance. — Ch. 5
- The interior sequence has two hold points, — Ch. 9
- the internal hours — Ch. 39
- The internal project team meeting — Ch. 26
- The Kessler subcontract — Ch. 5
- The key plan and the match lines. — Ch. 7
- The keying meeting always happens too late. — Ch. 9
- The kitchen hood and its makeup air — Ch. 10
- The known, priced problem. — Ch. 30
- The largest beneficiary is not Kestrel. — Ch. 27
- The largest single source of bias in the system. — Ch. 30
- The last person — Ch. 40
- The layers. — Ch. 38
- The learning curve. — Ch. 20
- The lesson. — Ch. 18 5
- the life-cycle column is empty or hand-waved. — Ch. 11
- The lifecycle, in nine phases. — Ch. 1
- The line on the schedule simply was not there. — Ch. 38
- The liquidated damages clause. — Ch. 40
- The list is distributed daily, by subcontractor, — Ch. 23
- The locker-room plumbing chase — Ch. 10
- The log. — Ch. 40
- the logs. — Ch. 8
- the low bidder wins. — Ch. 16
- the magnitude is genuinely uncertain — Ch. 19
- The mapping is many-to-many and you must own it. — Ch. 30
- The marginal daily cost — Ch. 22
- The market changes everything. — Ch. 42
- The market. — Ch. 37
- the marks agree with the model — Ch. 39
- The material/personnel hoist — Ch. 18
- The measure has to change with the job. — Ch. 41
- The measure of success is not the phone call. — Ch. 41
- The mechanism. — Ch. 19 39
- The medical gas gives way. — Ch. 35
- The meeting calendar. — Ch. 17
- The meta-lesson. — Ch. 19
- The meter clock — Ch. 1
- The method of measurement — Ch. 38
- The middle is a fixed-duration purchase. — Ch. 10
- the milestone by which it must be collected — Ch. 40
- the mill rolling slot date — Ch. 8
- The Miller Act — Ch. 5
- The mistakes with the biggest price tags — Ch. 8
- The money is not lost. It is late by thirty days. — Ch. 32
- the monitoring record is your defense. — Ch. 17
- The monthly checklist, in date order. — Ch. 32
- The most underrated choice on this list — Ch. 42
- The next job. — Ch. 40
- The nine rules — Ch. 37
- The nine things to carry out of this chapter. — Ch. 32
- The noise line. — Ch. 30
- The north arrow. — Ch. 7
- The notice date — Ch. 31
- the notice log lives next to the schedule update. — Ch. 29
- The numbers that should live in your head. — Ch. 1
- The numbers to carry. — Ch. 15
- The objective function — Ch. 17
- The observed condition, stated factually — Ch. 25
- The occupied building next door. — Ch. 17
- the one job that should worry you — Ch. 34
- The one sentence — Ch. 2
- The one sentence. — Ch. 10
- The one-page version. — Ch. 11
- The only number that requires judgment. — Ch. 28
- The opening two sentences — Ch. 41
- The opening two sentences. — Ch. 41
- the optimum size and why. — Ch. 20
- The other one that is legally required — Ch. 42
- The other surface. — Ch. 39
- The outcome — Ch. 41
- The outcome you want — Ch. 41
- The outcome you want. — Ch. 41
- The overtime arithmetic that people get wrong — Ch. 20
- The owner is moving in. — Ch. 40
- The pace self-adjusts. — Ch. 20
- The paid quantity goes down. — Ch. 38
- The paper is the job. — Ch. 18
- The pattern. — Ch. 39
- the paver must never stop. — Ch. 38
- The people who will do the work. — Ch. 27
- The percentage-of-completion method. — Ch. 34
- The performance (laboratory) mockup — Ch. 9
- the perimeter only — Ch. 12
- The period is short. — Ch. 29 31
- The person who does not talk at all. — Ch. 26
- The person who talks too much. — Ch. 26
- the person who was there — Ch. 26
- The phone rings on weekends. — Ch. 42
- The pipe gives way. — Ch. 35
- The pipeline is thinner than the demand. — Ch. 2 20
- The planning fallacy. — Ch. 6
- the plant cannot feed the pump you rented. — Ch. 21
- The point of the exercise. — Ch. 10
- The practical control — Ch. 36
- The pre-bid meeting. — Ch. 7
- The pre-installation conference — Ch. 26
- The pre-punch (yours). — Ch. 23
- The pre-task plan — Ch. 24
- The preliminary notice is your list. — Ch. 32
- The prequalification consequence, worked. — Ch. 24
- The pressure is measurable and public — Ch. 41
- The prevailing-wage checklist — Ch. 20
- The prevention. — Ch. 5
- The problem. — Ch. 39
- The product never changes. — Ch. 37
- The project directory. — Ch. 17
- The project duration is 103 work days. — Ch. 14
- The project engineer — Ch. 27
- the project is built twice. — Ch. 23
- The project labor agreement (PLA). — Ch. 20
- The project manager — Ch. 28
- The project manager who earns field credibility. — Ch. 42
- The project record will be read by lawyers. — Ch. 25
- The project. — Ch. 3
- The projects or experiences — Ch. 42
- The punch process — Ch. 19
- the quantity that ends up in the building — Ch. 12
- The question you ask after an incident — Ch. 24
- The range is enormous. — Ch. 36
- The rankings completely inverted. — Ch. 13
- the reason the first two were tolerated. — Ch. 29
- The reason to recall this here — Ch. 33
- The record-keeping requirement. — Ch. 18
- The reference — Ch. 25
- The reference card. — Ch. 30
- the regulation is the floor, not the program. — Ch. 24
- the regulatory minimum is a floor, not a target. — Ch. 18
- The relationship clock — Ch. 1
- the relationship must survive — Ch. 41
- The relationship. — Ch. 18
- The relationships end. — Ch. 42
- The remaining billable value is small — Ch. 32
- The remedies differ. — Ch. 33
- The removal sequence is part of the design. — Ch. 22
- The Repeatability Assumption — Ch. 39
- The required response date — Ch. 25
- The requirement — Ch. 23
- The reshoring scheme is an engineered design. — Ch. 22
- The result, assembled. — Ch. 33
- The retention test. — Ch. 3
- The return is somewhere else. Three places. — Ch. 39
- The return ratio is roughly 125 to 1 — Ch. 26
- The revision clouds. — Ch. 7
- The revision level and the revision block. — Ch. 7
- The revision-cloud walk. — Ch. 7
- the RFI line is the softest number on it. — Ch. 35
- The right answer is Option 1 — Ch. 21
- The risk moved to whoever is left holding it. — Ch. 11
- The risk occurs — Ch. 6
- The risk that creates — Ch. 21
- The roof — Ch. 10 23
- The roof is the flashings. — Ch. 9
- The routing priority convention — Ch. 10
- The rule. — Ch. 14
- The runner-up, and it is worth naming. — Ch. 36
- the savings split matters — Ch. 3
- The scaffold plank — Ch. 41
- The schedule and the coordination process — Ch. 19
- The schedule is not being updated. — Ch. 29
- The schedule of values is front-loaded. — Ch. 30
- The schedule of values. — Ch. 17
- the schedule was not wrong. — Ch. 35
- The scheduling point is the one people miss. — Ch. 9
- The scope boundary. — Ch. 12
- The selection method — Ch. 3
- The separate time notice was never sent at all. — Ch. 31
- the sequence — Ch. 37
- The sequence never changes. — Ch. 37
- The setup. — Ch. 18
- The sheet number. — Ch. 7
- The Simultaneity Trap — Ch. 39
- The site visit — Ch. 6
- The site. — Ch. 17
- The situation. — Ch. 10 11 21 23 24 33 37 39
- The slot. — Ch. 37
- The sort. — Ch. 40
- the source of most litigation — Ch. 7
- The specialist trap, and how to avoid it. — Ch. 42
- The specific question — Ch. 25
- The specificity. — Ch. 40
- the speed at which problems are detected. — Ch. 34
- The spoil setback. — Ch. 22
- The staff is still there. — Ch. 32
- The stairs — Ch. 18
- the standard for the remaining 388 — Ch. 19
- The status column has only four values — Ch. 16
- The statute of limitations — Ch. 25
- The statute of repose — Ch. 25
- The steel delay — Ch. 42
- The steel delay. — Ch. 1
- The sub cannot absorb it — Ch. 6
- The sub does not price it — Ch. 6
- The subcontractor coordination meeting — Ch. 26
- the subcontractors — Ch. 25
- The submittal and procurement log. — Ch. 17
- The submittal log and the RFI process. — Ch. 37
- The substantial completion clause. — Ch. 40
- The summary page. — Ch. 32
- The superintendent stopping work. — Ch. 37
- The superintendent who learns the money. — Ch. 42
- the surety takes weeks to investigate. — Ch. 5
- The system fix, which is the real answer. — Ch. 23
- The systemic move, which is the actual lesson. — Ch. 41
- the TAB report. — Ch. 40
- The target role — Ch. 42
- the team and the approach — Ch. 15
- The team is temporary and turns over constantly — Ch. 41
- The team. — Ch. 40
- The technology was never the problem. — Ch. 39
- The test — Ch. 24
- The test record itself. — Ch. 23
- The thesis. — Ch. 15
- The three arithmetic facts to carry in your head — Ch. 2
- The three continuous activities. — Ch. 1
- The three ethical lines, named. — Ch. 19
- The three ITP point types — Ch. 23
- The three measurements. — Ch. 39
- The three questions. — Ch. 15
- The three sentences to carry out of this chapter — Ch. 20
- The three things. — Ch. 19
- The threshold, restated. — Ch. 19 6
- the tie goes to the party defending. — Ch. 33
- The time. — Ch. 31
- The toolbox talk — Ch. 24
- the trade is handed down. — Ch. 42
- The traffic control plan (TCP) — Ch. 38
- The trap. — Ch. 29
- The tray gives way. — Ch. 35
- The truth is whatever the record can support — Ch. 25
- The two capability gaps — Ch. 42
- The two ladders, on one page. — Ch. 42
- The two lines. — Ch. 6
- The unbalanced bid — Ch. 4
- The undocumented rate was the mistake. — Ch. 12
- The unit of measure — Ch. 38
- The unit price carried forward — Ch. 13
- The unit-price bid schedule — Ch. 38
- The Unread Dashboard — Ch. 39
- The update, in four inputs and one rule. — Ch. 29
- The value engineering was the model. — Ch. 11
- The variable choices — Ch. 17
- The vocabulary, straight — Ch. 23
- The waterside — Ch. 10
- The weekend problem. — Ch. 18
- The weekly work plan and constraint log — Ch. 29
- The weights carry all the meaning. — Ch. 3
- the whole number — Ch. 13
- The Willow Street Community Center — Ch. 36
- The Willow Street Community Center. — Ch. 29
- The WIP schedule, in one place. — Ch. 34
- the work is not held hostage to a negotiation. — Ch. 31
- The work is real and it stays built. — Ch. 42
- The work moves you. — Ch. 42
- The work must conform to the contract documents. — Ch. 23
- Their fee is fixed early and their effort is not. — Ch. 2
- Then the two structural costs — Ch. 24
- Then write the basis-of-quantities page — Ch. 12
- There are cliffs no daily rate compensates — Ch. 40
- There are no liquidated damages for lateness — Ch. 37
- There are three reviewers, not one. — Ch. 25
- There are two critical paths. — Ch. 29
- There is a closeout line. — Ch. 32
- There is exactly one current set. — Ch. 7
- there is no national permit list. — Ch. 17
- There is no pay item for this. — Ch. 38
- There is no retention. — Ch. 37
- there is no universally correct system. — Ch. 8
- There was no revised job hazard analysis (JHA). — Ch. 31
- Thermal — Ch. 9
- thermal — Ch. 9
- Thermal breaks. — Ch. 9
- thermal bridges — Ch. 9
- Thermal bridging — Ch. 36
- Thermal. — Ch. 9
- Thermaline Insulation — Ch. 19
- These are not universal constants. — Ch. 12
- They are frequently wrong — Ch. 38
- They are not a claims methodology. — Ch. 20
- They are not substitutes for each other. — Ch. 23
- they can be gamed — Ch. 24
- They do not compound cleanly. — Ch. 20
- They have not been scaled to the size of the gap — Ch. 20
- They interact with the building code. — Ch. 7
- They were never two different tables. — Ch. 24
- thin margin on a large number. — Ch. 15
- Thin supervision. — Ch. 24
- third — Ch. 6
- Third, escalate to the owner in writing — Ch. 31
- Third, hindsight contamination. — Ch. 33
- Third, several steps are queues, not durations. — Ch. 40
- Third, the fix is visible on the chart itself. — Ch. 38
- third-party liability claims against you — Ch. 5
- Third-party verification — Ch. 10
- thirty to fifty times — Ch. 9
- thirty-four days — Ch. 29
- This box does not exist. — Ch. 29
- This checkpoint joins them. — Ch. 30
- This is how people get hurt. — Ch. 4
- this is learned, not innate. — Ch. 41
- This is not concurrency. — Ch. 33
- This is the dangerous one. — Ch. 26
- This is the estimate. Write it down. — Ch. 12
- This is the failure point. — Ch. 35
- this is the gate, and it fails it. — Ch. 39
- This is the most honest method available — Ch. 30
- This is the part that will teach you the most — Ch. 33
- This is the real ceiling — Ch. 2
- This is the rung that pays today — Ch. 35
- this month and last month — Ch. 29
- This one is substantially yours — Ch. 36
- This proposal carries no cost or time impact. — Ch. 25
- this week — Ch. 19 41
- those statutes vary substantially by state. — Ch. 4
- three — Ch. 20 21 28 29
- three codes you are worried about — Ch. 28
- Three consecutive periods — Ch. 28
- three cost codes — Ch. 42
- three documents — Ch. 5
- three leadership skills you are weakest in. — Ch. 41
- Three of five screened out. — Ch. 27
- Three paths through it. — Ch. 1
- Three points is not a margin. — Ch. 3
- three practices you would keep — Ch. 37
- three qualified, competitive bidders per trade. — Ch. 13
- Three relationships to build — Ch. 42
- three scope gaps — Ch. 13
- three separate decisions — Ch. 3
- Three to four hours. — Ch. 27
- three to four weeks. — Ch. 40
- three weeks before it would have hurt. — Ch. 27
- three you would abandon — Ch. 37
- Three, and this is the one that costs people. — Ch. 16
- Three-hundred-sixty-degree walkthrough capture — Ch. 39
- three-party — Ch. 5
- Three. — Ch. 17 22 32 36 39 5
- Threshold concept. — Ch. 10 12 14 19 25 27 3 33 4 6 7
- Threshold with sharing — Ch. 4
- throughput — Ch. 37
- Thursday — Ch. 1
- tie the dollars to the event — Ch. 33
- Tie this back to the steel acceleration. — Ch. 19
- Tie-ins. — Ch. 21
- Tiebacks (anchors) — Ch. 22
- Tier-3 illustrative composite — Ch. 18 24 8
- Tilt-up — Ch. 8
- Time — Ch. 11
- time — Ch. 12 31 33 37 6
- time but not money — Ch. 33
- Time extension — Ch. 29
- time extension — Ch. 29 6
- Time impact — Ch. 31
- time impact — Ch. 5
- time impact analysis — Ch. 29
- time impact analysis (TIA) — Ch. 29 31
- Time impact analysis (TIA) — Ch. 33
- time only, no money — Ch. 33
- Time to revenue. — Ch. 2
- Time your presentation against the point weights. — Ch. 15
- time-and-material (T&M) ticket — Ch. 31
- Time-and-material tickets — Ch. 26
- time-location chart — Ch. 38
- Time. — Ch. 38
- Timely written notice, every time — Ch. 33
- Times — Ch. 32
- Timing — Ch. 34
- timing and leverage. — Ch. 7
- Timing is contractual. — Ch. 7
- to buy one day. — Ch. 20
- to date — Ch. 26
- to this site — Ch. 24
- to-complete performance index (TCPI) — Ch. 30
- today — Ch. 40
- together, on the deck, in forty minutes — Ch. 24
- Tolerance — Ch. 11
- tolerance stack-up. — Ch. 8
- Tomorrow she goes to the other builder — Ch. 37
- TON — Ch. 12 38
- Too coarse — Ch. 28
- Too fine — Ch. 28
- too high — Ch. 21
- too low — Ch. 21
- Tool crib and check-out — Ch. 18
- toolbox talk — Ch. 24
- Toolbox talk — Ch. 26
- Toolbox talk relevance — Ch. 24
- tools — Ch. 35
- Tools and material handling — Ch. 20
- Top ten subtotal — Ch. 19
- Top-down. — Ch. 6
- top-five risk-register entry — Ch. 17
- TOTAL — Ch. 11 13 25 31 35
- Total — Ch. 12 15 16 17 18 19 20 21 22 23 24 25 26 27 30 32 33 35 36 38 39 40 41 6 7 9
- total — Ch. 14
- Total AC — Ch. 30
- Total added controls — Ch. 24
- Total adjustments — Ch. 13
- Total architectural — Ch. 7
- TOTAL ASSETS — Ch. 34
- TOTAL BID — Ch. 13 38
- Total bid — Ch. 38
- total bid — Ch. 38
- Total bid at estimated quantities — Ch. 4
- Total change order request — Ch. 31
- Total commodity-exposed scope — Ch. 4
- Total completed and stored to date — Ch. 32
- Total contract sum — Ch. 4
- Total cost — Ch. 29 37 38
- Total cost if we accelerate — Ch. 29
- Total cost incurred — Ch. 31
- total cost method — Ch. 33
- total cost method last — Ch. 33
- Total cost of acceleration — Ch. 14
- Total cost of quality — Ch. 23
- Total cost of the 5-day cycle — Ch. 22
- TOTAL COST OF WORK — Ch. 16
- Total cost to the project — Ch. 18
- Total cost to this job — Ch. 22
- Total craft — Ch. 26
- Total current assets — Ch. 34
- Total current liabilities — Ch. 34
- Total cycle — Ch. 37
- Total cycle time — Ch. 8
- TOTAL DIRECT COST OF WORK — Ch. 13
- Total drawn from contingency — Ch. 28
- Total earned less retainage — Ch. 32
- Total enabling cost — Ch. 29
- Total estimated cost — Ch. 34
- Total estimated cost at completion — Ch. 34
- Total EV — Ch. 6
- Total expected retained loss — Ch. 6
- Total exposure — Ch. 21 22
- Total exposure, Option A — Ch. 9
- Total exposure, Option B — Ch. 9
- Total fleet cost — Ch. 8
- Total float — Ch. 14
- total float — Ch. 14
- Total float (TF) — Ch. 14
- total float on the framing activity at the start — Ch. 33
- Total float, this update against the last five — Ch. 29
- Total foundation formwork — Ch. 12
- TOTAL GENERAL CONDITIONS — Ch. 13 4
- Total in warranty — Ch. 23
- TOTAL INSIDE THE GMP — Ch. 36
- TOTAL INSURANCE AND BONDS — Ch. 13
- Total labor cost variance — Ch. 20 30
- Total labor hours, both locations — Ch. 39
- Total liabilities — Ch. 34
- TOTAL LIABILITIES AND EQUITY — Ch. 34
- Total logged exposure — Ch. 7
- Total misses — Ch. 27
- Total non-productive — Ch. 20
- Total on estimated quantities — Ch. 15
- Total one-time mobilization — Ch. 17
- Total open — Ch. 40
- Total owning and operating cost (no operator) — Ch. 13
- TOTAL PAID — Ch. 38
- Total paid — Ch. 4
- Total penalty — Ch. 21
- Total pending-change exposure — Ch. 31
- total pending-change exposure — Ch. 31
- Total performed, not invoiced, not in the report — Ch. 28
- Total prefabricated cost — Ch. 39
- Total premium — Ch. 5
- Total prevention cost — Ch. 23
- Total priced exposure — Ch. 11
- TOTAL PROJECT BUDGET — Ch. 11
- Total provable cost lost — Ch. 31
- Total Recordable Incident Rate (TRIR) — Ch. 24
- TOTAL RECOVERED — Ch. 38
- TOTAL REQUIRED CLEARANCE BELOW ANCHOR — Ch. 24
- Total retainage — Ch. 32
- Total revenue on the shaft item — Ch. 38
- total rigging weight — Ch. 21
- Total savings below the GMP — Ch. 6
- Total self-perform — Ch. 20
- Total self-perform concrete labor — Ch. 28
- Total shortfall — Ch. 38
- Total slip — Ch. 33
- Total soft cost to ask the question — Ch. 7
- Total spread cost — Ch. 38
- Total suspended — Ch. 21
- Total to fix now — Ch. 23
- Total truck cycle — Ch. 38
- Total uncompleted bonded work — Ch. 2 34
- Total vertical construction cost — Ch. 37
- Total weekly cost — Ch. 41
- Total, 12 weeks — Ch. 22
- Total, absorbed entirely by Kestrel — Ch. 15
- Total, nine packages — Ch. 16
- Totals — Ch. 26 31 33 34 4
- TOTALS — Ch. 32
- tower-crane rental invoice — Ch. 1
- Toyota Production System (TPS) — Ch. 27
- TPO — Ch. 9
- traceability — Ch. 14
- Track currency, not attendance. — Ch. 24
- Trade — Ch. 7
- Trade contracts and payment. — Ch. 37
- Trade flow and work-zone planning. — Ch. 35
- Trade partner interviews — Ch. 6
- Trade permits — Ch. 17
- Trade stacking — Ch. 19 24 27 29 31
- trade stacking — Ch. 29
- Trade stacking and congestion. — Ch. 20
- trades — Ch. 37
- Traffic and pedestrians — Ch. 15
- traffic control plan — Ch. 17
- Trailer at the southwest, inside Gate 1 — Ch. 17
- Trailers — Ch. 17
- Training courses, not certifications. — Ch. 42
- Training currency — Ch. 24
- Training records — Ch. 40
- transcription — Ch. 25
- transfer — Ch. 18 32 6
- Transfer — Ch. 6
- transformer — Ch. 17
- Translated core documents — Ch. 41
- transmittal — Ch. 25
- transmittal dates and the review-cycle log — Ch. 9
- Transmittal with acknowledgment. — Ch. 7
- Transport — Ch. 27
- Transport limits govern module size — Ch. 39
- Transport. — Ch. 37
- Transposition or spreadsheet formula — Ch. 12
- Travel — Ch. 18 20
- Travel. — Ch. 18
- treatment given — Ch. 24
- Treats the owner like a buyer. — Ch. 37
- Trellis Engineering — Ch. 25
- Trench and excavation collapse. — Ch. 24
- trench backfill and compaction in the 5-foot zone — Ch. 16
- Trench box (shield) — Ch. 8
- Trench shield (trench box) — Ch. 22
- Trenchless methods — Ch. 38
- Trend beats level. — Ch. 30
- Trentwood Mechanical — Ch. 15
- trespass — Ch. 21
- Trial batch during preconstruction — Ch. 36
- Trigger — Ch. 33 40
- trigger conditions — Ch. 18
- tripled — Ch. 30
- Trough. — Ch. 2
- Truck entrance — Ch. 17
- Truck route — Ch. 17
- Truck routes. — Ch. 18
- truck to crane to final position — Ch. 18
- Trucks in rotation — Ch. 21
- Trucks per hour — Ch. 21
- true concurrency — Ch. 29
- true north — Ch. 7
- Trusses — Ch. 8
- Try it. — Ch. 10 19 3 35
- Tube and coupler — Ch. 22
- tuition or credential repayment — Ch. 42
- turnaround expectations in days — Ch. 17
- twelve months — Ch. 37
- Twelve months of actions with dates. — Ch. 42
- twelve months of measured operating performance — Ch. 36
- twice-weekly — Ch. 41
- Twin — Ch. 35
- two — Ch. 16 29 6
- two critical paths — Ch. 14
- two framing crews — Ch. 37
- Two honest cautions. — Ch. 29
- Two horizontal control monuments — Ch. 18
- two inspection hold points — Ch. 10
- two or more — Ch. 41
- two parking spaces the adjacent clinic uses — Ch. 1
- two people read it back digit by digit — Ch. 13
- two percent — Ch. 21
- two sets of gang forms. — Ch. 39
- two taglines — Ch. 24
- two to four years — Ch. 9
- two trucks — Ch. 18
- two work days — Ch. 14
- two-day inter-trade buffer — Ch. 37
- two-party — Ch. 5
- two-sentence justification — Ch. 15 3
- two-stage wellpoint system — Ch. 22
- Two-touch rule. — Ch. 23 40
- Two. — Ch. 17 22 32 36 39 5
- Type — Ch. 7
- Type I — Ch. 38 8
- Type I, decisively — Ch. 38
- Type II — Ch. 38 8
- Type II is hard. — Ch. 38
- type of construction activity — Ch. 18
- Typical cost — Ch. 33
- Typical duration — Ch. 33 40
- Typical use — Ch. 3
- U-factor — Ch. 9
- U.S. Bureau of Labor Statistics. — Ch. 42
- U.S. Green Building Council (USGBC) — Ch. 36
- Umbrella / excess liability — Ch. 5
- un-fixable at that point — Ch. 37
- unbalanced — Ch. 38
- Unbalanced bidding — Ch. 13
- unbalanced bidding — Ch. 38 4
- Unbalanced rates — Ch. 38
- Unbilled change work — Ch. 34
- Unbundle packages. — Ch. 19
- Uncapped consequential damages — Ch. 15
- Uncertainty — Ch. 6
- uncertainty retiring — Ch. 11
- unchanged — Ch. 38
- Uncharacteristic conflict or anger — Ch. 41
- Unclear or conflicting contract documents — Ch. 23
- uncompleted bonded work — Ch. 2
- Unconditional — Ch. 32 5
- unconditional — Ch. 32 5
- Under 50 days — Ch. 31
- under investigation — Ch. 23
- Under the membrane is where the money is. — Ch. 9
- Under two hours, total — Ch. 25
- Under-billing — Ch. 34
- under-billings — Ch. 34
- Under-documents. — Ch. 37
- Under-reporting — Ch. 24
- under-resourcing quality and safety — Ch. 6
- Under-schedules the line. — Ch. 37
- Under-slab plumbing, under test — Ch. 37
- under-slab vapor barrier — Ch. 8
- under-specifies — Ch. 3
- Underbillings — Ch. 16
- Underestimates coordination. — Ch. 37
- Underpinning — Ch. 22
- understated — Ch. 4
- Understates early effort. — Ch. 28
- Unflagged deviation — Ch. 25
- Uniform Commercial Code (UCC) — Ch. 5
- uniform, adequate limits — Ch. 5
- UniFormat — Ch. 11 7
- UniFormat. — Ch. 7
- unimpacted — Ch. 31
- Unimpacted (the measured mile) — Ch. 33
- Union work is a different build-up. — Ch. 12
- Unit costs — Ch. 12
- unit number — Ch. 37
- unit of measure — Ch. 38
- unit price — Ch. 2 38 7
- Unit price — Ch. 4
- unit price book — Ch. 3
- Unit prices — Ch. 11 15
- unit prices — Ch. 15
- Unit rate — Ch. 20
- unit rate — Ch. 28
- Unit rate / productivity — Ch. 28
- unit rate against a measurable quantity — Ch. 37
- unit repetition — Ch. 37
- unit-price — Ch. 37 38 8
- unit-price heavy-civil contract — Ch. 37
- Unitized — Ch. 9
- Units complete — Ch. 30
- Units in place. — Ch. 32
- Units installed — Ch. 28
- University program placement data. — Ch. 42
- unknown — Ch. 24
- Unknown — Ch. 38
- Unknown conditions and disruption — Ch. 37
- unless your contract says otherwise — Ch. 40
- Unloading method — Ch. 18
- Unprotected leading edges and deck openings. — Ch. 8
- Unread Dashboard — Ch. 39
- unreadiness — Ch. 27
- unscreened work plans manufacture stacking. — Ch. 27
- Unsophisticated subs will sign — Ch. 32
- Untrained. — Ch. 37
- Unused talent — Ch. 27
- unusual nature — Ch. 38
- Unusual or adverse weather — Ch. 33
- upper sheet lapping over the lower — Ch. 23
- upside — Ch. 6
- upside is capped by the contract — Ch. 15
- usability — Ch. 28
- Use as is — Ch. 23
- use CO monitoring — Ch. 22
- Use man-hours per unit as your primary measure. — Ch. 20
- Use the actual table for your assembly. — Ch. 36
- useless — Ch. 29
- user cost — Ch. 38
- Using payment leverage to force a settlement. — Ch. 31
- Utilities — Ch. 15
- Utility conflicts — Ch. 6
- Utility connection and service applications — Ch. 17
- utility location and protection — Ch. 6
- utility responsibility matrix — Ch. 17
- Utility service applications — Ch. 17
- VAC — Ch. 30
- validity date — Ch. 12
- value — Ch. 11 27
- value engineering — Ch. 3
- Value engineering (VE) — Ch. 11
- Value engineering / value analysis — Ch. 11
- Value engineering is now scope cutting. — Ch. 11
- Vapor — Ch. 9
- vapor — Ch. 9
- variable — Ch. 21
- Variable — Ch. 38
- Variable subtotal — Ch. 21
- Variance — Ch. 28
- Variance at completion — Ch. 30
- Variance. — Ch. 28
- Variances — Ch. 30
- variation clause. — Ch. 4
- variation in estimated quantity — Ch. 6
- variation threshold — Ch. 8
- Varies enormously — Ch. 32
- varies enormously by state — Ch. 42
- varies significantly by jurisdiction — Ch. 3
- Varies substantially by jurisdiction and contract — Ch. 33
- varies substantially by state. — Ch. 2
- Varies. — Ch. 5
- vary by jurisdiction — Ch. 29
- vary by jurisdiction and by contract form. — Ch. 29
- vary by state — Ch. 42
- vary considerably — Ch. 3
- vary enormously by state — Ch. 42
- vary enormously by state and city. — Ch. 42
- vary significantly by state — Ch. 15
- vary substantially by jurisdiction — Ch. 40
- vary substantially by state and change over time — Ch. 13
- Vary the mix by element. — Ch. 36
- varying by state — Ch. 5
- VAV — Ch. 10
- VDC — Ch. 1 10 35
- VDC / BIM — Ch. 42
- VDC / BIM manager — Ch. 1
- VDC scope — Ch. 7
- VE-02 — Ch. 11
- VE-12 — Ch. 11
- VE-14 — Ch. 11
- VE-15 — Ch. 11
- Vegetated (green) roofs — Ch. 36
- Vegetation. — Ch. 39
- Vehicle — Ch. 42
- vehicle allowance tax treatment — Ch. 42
- vehicle intruding into the work space — Ch. 38
- ventilate as the manufacturer requires — Ch. 22
- venue — Ch. 4
- verbal go-ahead on a Thursday — Ch. 25 26
- verbal go-ahead on a Thursday. — Ch. 5
- Verdict on April 16, week 7 — Ch. 25
- Verification and close-out — Ch. 23
- Verification of installed work against the model. — Ch. 39
- verified by trying to start it — Ch. 24
- Verify before you bid, not after you buy — Ch. 16
- verify by state — Ch. 5
- Verify the one that governs your project. — Ch. 5
- Verify your jurisdiction. — Ch. 5
- Verify your state. — Ch. 5
- Verify yours. — Ch. 5
- Vertical dead load — Ch. 22
- Vertical live load — Ch. 22
- Very fast — Ch. 8
- Very high — Ch. 4 8
- Very high per element — Ch. 8
- Very limited grounds — Ch. 5
- Very narrow grounds only — Ch. 33
- Very widely, and for years. — Ch. 39
- Vibration and airblast monitoring — Ch. 38
- Vibration and impact — Ch. 22
- virtual design and construction — Ch. 1
- visible — Ch. 1
- visible before they are occupied — Ch. 22
- Visitors — Ch. 26
- Visual communication — Ch. 41
- Visual management — Ch. 27
- VOC content or emissions data — Ch. 36
- vocabulary and frameworks. — Ch. 42
- void — Ch. 36
- Void or restricted in many states — Ch. 5
- Voids more valid claims than any other clause. — Ch. 4
- volatile for small firms. — Ch. 16
- volume — Ch. 34
- volume buying — Ch. 5
- voluntary 18 percent participation target — Ch. 19
- W-1 — Ch. 6
- W-2 — Ch. 6
- Wage determination — Ch. 15
- wage determination — Ch. 20
- Wage theft. — Ch. 20
- Waiting — Ch. 18 19 20 27
- waiver — Ch. 33
- waiver matrix — Ch. 32
- Waiver of consequential damages — Ch. 4
- Waiver of subrogation. — Ch. 5
- Waivers and releases — Ch. 33
- waives the claim. — Ch. 5
- walk it out loud — Ch. 14
- walkaround — Ch. 24
- Wall panels — Ch. 37
- wall surface area — Ch. 35
- Warranties — Ch. 16 25 40
- Warranties and guarantees — Ch. 40
- Warranty — Ch. 16 7
- warranty — Ch. 7
- Warranty item — Ch. 23 40
- Wash-out and tire wash — Ch. 17
- waste — Ch. 27
- Waste — Ch. 35
- Waste management — Ch. 13
- waste management plan — Ch. 36
- Water — Ch. 9
- Water and wastewater plants — Ch. 38
- water control layer — Ch. 9
- Water Efficiency — Ch. 36
- Water in the building damages her work. — Ch. 9
- Water reuse. — Ch. 36
- Water, air, vapor, thermal — Ch. 36
- Water, atmosphere, and adjacent structures — Ch. 22
- Water-cement ratio (w/c) — Ch. 8
- water-main relocation — Ch. 17
- water-resistive barrier (WRB) — Ch. 9
- Water. — Ch. 39
- waterproofing — Ch. 8
- We used all five. — Ch. 24
- Weakest, and frequently rejected. — Ch. 33
- Wearables — Ch. 39
- Weather — Ch. 27 6
- Weather and temperature. — Ch. 20
- Weather belongs in the calendar. — Ch. 14
- Weather calendars — Ch. 14
- weather triggers — Ch. 18
- weather window — Ch. 8
- Weather. — Ch. 11 21 26
- weathervanes out of service — Ch. 21
- week 14 — Ch. 3
- Week 28 is where you make the phone call — Ch. 20
- week 34 — Ch. 14 28
- week 49 — Ch. 19
- Weekly — Ch. 40
- weekly certified payrolls — Ch. 20
- Weekly gross — Ch. 20
- weekly manpower reporting with a stated minimum — Ch. 16
- weekly work plan and the six-week look-ahead — Ch. 29
- weekly work plan for the week of April 6. — Ch. 27
- Weekly written update — Ch. 37
- weeks — Ch. 22
- Weeks — Ch. 23
- weeks 34 through 36 — Ch. 14 29
- weeks before dried-in — Ch. 9
- Wei Chen — Ch. 28
- Weighed versus computed. — Ch. 38
- Weight tickets go missing. — Ch. 36
- weight tickets, not intentions. — Ch. 18
- weighted average date of the spend — Ch. 11
- Weighted milestones — Ch. 30
- weighted scoring model — Ch. 15
- Weighted total (max 130) — Ch. 3
- well — Ch. 25 38
- WELL — Ch. 36
- Wellpoints — Ch. 22
- wellpoints — Ch. 8
- Westbrook Ambulatory Surgery Center — Ch. 42
- Wet work before absorptive materials. — Ch. 36
- wet-pipe sprinkler system — Ch. 10
- Wetlands and waters — Ch. 5
- what — Ch. 19
- What a good week looks like — Ch. 24
- What a hazard is — Ch. 24
- What a normal PPC looks like. — Ch. 27
- What a real one contains. — Ch. 24
- What a stale scaffold tag means — Ch. 24
- What a takeover actually looks like. — Ch. 19
- What actually works — Ch. 20
- What configuration — Ch. 7
- What gets challenged, and how you substantiate it — Ch. 31
- What happened next on Northgate. — Ch. 33
- What has genuinely succeeded — Ch. 37
- what I need from the trade before me. — Ch. 27
- what I need from them, and by when. — Ch. 1
- What information to provide — Ch. 40
- What is an emergency — Ch. 40
- What is covered and what is not — Ch. 40
- What is the consequence of late notice — Ch. 33
- What it actually costs. — Ch. 18
- What it cannot see. — Ch. 39
- what it costs if you ignore it for 24 hours — Ch. 1
- What it costs. — Ch. 22
- What it does not mean. — Ch. 41
- What it is — Ch. 36
- What it is NOT for — Ch. 35
- What it means for the job. — Ch. 28
- What it means for you — Ch. 36
- What Kestrel advised. — Ch. 26
- What Kestrel is doing. — Ch. 26
- What Kestrel needs from Meridian. — Ch. 26
- What Kestrel pays for it. — Ch. 19
- what load class — Ch. 22
- What Margo actually said to Yolanda Prieto. — Ch. 19
- What product — Ch. 7
- What quality — Ch. 7
- What starts the clock — Ch. 33
- What submittals — Ch. 7
- What the contract says. — Ch. 1 10 11 12 13 14 15 16 17 18 19 2 20 21 22 23 24 25 26 28 29 30 31 32 33 34 35 36 37 38 39 4 40 41 42 5 6 7 8 9
- What the failure actually cost — Ch. 23
- What the price includes — Ch. 38
- What the support does to the neighbors. — Ch. 22
- What this chapter gives you. — Ch. 22 36 6
- What those four numbers mean, in plain English. — Ch. 37
- What to do in a boom. — Ch. 42
- What to do in a downturn. — Ch. 42
- What warranty — Ch. 7
- what was physically done — Ch. 31
- What we understood you to direct. — Ch. 26
- What will hurt you — Ch. 3
- what you approved for payment — Ch. 30
- What you are doing — Ch. 31
- What you are doing about it — Ch. 33
- What you did about it — Ch. 26
- What you do if it goes badly. — Ch. 41
- What you hand the AHJ — Ch. 36
- what you need from the trade before you — Ch. 27
- What you need to know before you start. — Ch. 41
- What you need to know first. — Ch. 41
- what you put in their place to protect yourself. — Ch. 37
- What you reward is what you get. — Ch. 41
- What you will check — Ch. 41
- what you would do in the first hour — Ch. 38
- What you write down becomes the truth. — Ch. 41
- What your contract says. — Ch. 25
- When — Ch. 23
- when — Ch. 41
- when hours go down, the hourly burden goes up. — Ch. 20
- When it surfaces, it surfaces with a name on it. — Ch. 23
- When safety is decided — Ch. 24
- when status is a document, it becomes a record. — Ch. 26
- When the builder is engaged — Ch. 3
- When the rate is not contractually fixed — Ch. 33
- When updated — Ch. 24
- when you act — Ch. 33
- Where — Ch. 18 23 26 7
- where — Ch. 41 7
- Where intermediate form is void. — Ch. 5
- Where it came from. — Ch. 39
- Where it landed. — Ch. 31
- Where lump sum goes wrong. — Ch. 4
- Where projects get hurt — Ch. 36
- where the absence hurts. — Ch. 37
- Where the line falls is a matter of state law. — Ch. 5
- Where the line is. — Ch. 15 4
- Where the money went in this chapter — Ch. 23 37 7
- where the record lives — Ch. 24
- Where the rows come from, — Ch. 6
- Where you look for the cause — Ch. 24
- Whether the item is on the sheet. — Ch. 12
- Whether the units are right. — Ch. 12
- which — Ch. 19 20
- Which crews were sent home or redeployed — Ch. 18
- Which documents govern — Ch. 35
- which jobs are in each pile — Ch. 34
- which level of the hierarchy — Ch. 24
- which one — Ch. 7
- which permit governs it in your jurisdiction — Ch. 22
- which question matters — Ch. 37
- Which specific activities were affected — Ch. 18
- which subpart owns which topic — Ch. 24
- Which system, and who designs it. — Ch. 22
- who — Ch. 22
- Who — Ch. 26
- Who absorbed it — Ch. 4
- Who attends. — Ch. 19
- who can stop work — Ch. 24
- who controls the operator — Ch. 21
- Who decides — Ch. 33
- Who does it — Ch. 39
- who from the installing crew must attend — Ch. 23
- who has authority to direct the contractor — Ch. 31
- who has the authority to release it — Ch. 23
- Who holds the design contract — Ch. 3
- who inspects it — Ch. 22
- Who must be there — Ch. 23
- Who must receive the notice — Ch. 33
- Who owns cost overrun above the contract price — Ch. 3
- Who owns design errors and omissions — Ch. 3
- who owns float — Ch. 29
- Who owns it. — Ch. 27
- Who owns layout in each subcontract — Ch. 17
- Who owns safety — Ch. 24
- who owns the scaffold — Ch. 22
- who owns this risk, and who captures this benefit — Ch. 39
- who owns which risk — Ch. 39
- who owns which risk and what that costs. — Ch. 4
- Who pays — Ch. 13
- who pays for standby time — Ch. 22
- Who reads it — Ch. 24
- Who runs it — Ch. 36
- who signed it. — Ch. 9
- Who struggles — Ch. 1
- who talks to the public, and who does not — Ch. 24
- Who to call — Ch. 40
- who verifies — Ch. 24
- whole distribution — Ch. 15
- whole problem — Ch. 41
- Whole-building air-leakage test (blower door) — Ch. 9
- Whole-building air-leakage testing — Ch. 36
- whose direction — Ch. 31
- whose float was it — Ch. 31
- Why — Ch. 26
- why — Ch. 27
- Why excessive over-billing is a warning. — Ch. 34
- Why it is a bad idea anyway. — Ch. 4
- Why it is normal, and often healthy. — Ch. 34
- Why it is shaped that way. — Ch. 41
- Why no other work was available — Ch. 18
- Why the agency rejects it. — Ch. 38
- Why the percentage fee is genuinely dangerous. — Ch. 4
- Why this matters for your notebook. — Ch. 18 24
- Why this works. — Ch. 1 10 11 12 13 14 15 17 18 19 21 22 23 24 25 26 27 28 29 3 30 31 32 34 35 36 37 38 39 4 40 41 42 5 6 7 8
- Why you round down. — Ch. 27
- Why zero days. — Ch. 31
- Widely, on coordinated projects. — Ch. 39
- Widely. — Ch. 39
- will not enforce it. — Ch. 5
- Willful — Ch. 24
- Willow Street Community Center — Ch. 1 14 15 18 2 24 26 27 3 32 4 41 5 8 9
- win work — Ch. 42
- wind limit — Ch. 24
- Wind limits for crane operation — Ch. 18
- Wind on a tall form or a flying table — Ch. 22
- Window — Ch. 39
- Window total — Ch. 33
- windows — Ch. 33
- Windows / contemporaneous period analysis — Ch. 33
- Winter conditions — Ch. 16
- Winter conditions. — Ch. 15
- WIP — Ch. 37 5
- wish — Ch. 35
- with — Ch. 24
- with age in days — Ch. 26
- with amendments. — Ch. 36
- with defensible logic — Ch. 33
- with one resubmittal allowance included — Ch. 25
- with stated assumptions — Ch. 35
- withdrawal, not correction. — Ch. 15
- within — Ch. 11
- without ever lifting the pen. — Ch. 36
- Without looking back — Ch. 12
- Witness point (W) — Ch. 23
- Wk 24 (Thu) — Ch. 31
- Wk 26 — Ch. 31
- wood-framed second floor — Ch. 8
- work — Ch. 16 21
- work breakdown structure (WBS) — Ch. 14
- work days — Ch. 14 27
- work days (WD) — Ch. 14
- work days 6 through 17 — Ch. 14
- Work days at 9 hr — Ch. 21
- Work hours and noise. — Ch. 18
- Work hours. — Ch. 11
- Work in waters and wetlands — Ch. 38
- Work over and near water — Ch. 38
- Work package / trade / subcontractor — Ch. 23
- work proceeds — Ch. 23
- Work rules and jurisdiction. — Ch. 20
- Work sampling — Ch. 20
- Work the crossovers. — Ch. 21
- Work-hour restrictions and noise ordinances. — Ch. 17
- work-in-progress schedule — Ch. 34
- Work-zone intrusion — Ch. 38
- workable backlog — Ch. 27
- Worked, on Northgate. — Ch. 33
- Worker classification — Ch. 20
- Worker height below the D-ring — Ch. 24
- Workflow / 4D clash — Ch. 35
- workflow clash — Ch. 10
- Working capital — Ch. 16 19 2 34
- working capital, not competence. — Ch. 42
- working days — Ch. 38
- Working hours — Ch. 37
- working radius — Ch. 21
- Working-capital turnover — Ch. 34
- Working-capital turnover says stop. — Ch. 34
- working-day charges — Ch. 38
- Working-day contract time — Ch. 38
- workmanship and coordination — Ch. 36
- workplace management, not clinical advice. — Ch. 41
- worse — Ch. 38
- worse, and permanent. — Ch. 36
- Worst fit — Ch. 4
- Worst. — Ch. 34
- Wrap-ups. — Ch. 24
- Write in a re-scoping mechanism. — Ch. 36
- Write it in the field, not in the trailer. — Ch. 26
- Write it so a hostile reader stays fair. — Ch. 33
- Write the method on the report. — Ch. 28
- Write the NCR — Ch. 23
- write the one-sentence justification. — Ch. 30
- Write the scope sheet before you invent the bids. — Ch. 13
- written brace-release — Ch. 22
- Written confirmation of the calculation basis — Ch. 36
- written contingency — Ch. 38
- Written notice — Ch. 18
- written notice — Ch. 5
- Written notice of a change — Ch. 25
- Written notice with a cure period — Ch. 40
- written question for the question period. — Ch. 15
- written release from the erection engineer — Ch. 22
- written request within a stated period — Ch. 38
- written strength result in hand — Ch. 22
- Written subcontract change order — Ch. 25
- written talks — Ch. 24
- written wall-bracing plan — Ch. 22
- Wrong-sized program for the project — Ch. 35
- year — Ch. 38
- YELLOW — Ch. 22
- YES — Ch. 14 29
- yes — Ch. 15 5
- Yes — Ch. 22 25 31 35 38 5
- Yes, all four. — Ch. 24
- Yes, immediately, visually — Ch. 35
- Yes, it is a change — Ch. 31
- Yes, it is a nonconformance. — Ch. 23
- Yes. — Ch. 24 40
- Yes. Select. — Ch. 10
- Yolanda Prieto — Ch. 19
- You — Ch. 16 5
- you — Ch. 33 39 5
- You are 1,600 lb over. The pick fails. — Ch. 21
- You are a coordinator. — Ch. 19
- You are a risk aggregator. — Ch. 19
- You are accountable for — Ch. 3
- You are an integrator. — Ch. 19
- You are designing against an unknown structure. — Ch. 22
- you are holding a superseded sheet — Ch. 7
- You are not ready to file. — Ch. 33
- you are ordinarily the controlling employer. — Ch. 19
- you assign the cause internally. — Ch. 41
- you build with people — Ch. 40
- you build with people, not with materials — Ch. 23
- you build with people, not with materials. — Ch. 1 20 41
- You build with people. — Ch. 37
- you can see it coming from inside the schedule — Ch. 14
- You cannot coordinate the hoisting or the crane. — Ch. 14
- you cannot get back to it. — Ch. 9
- You cannot plan on the forgiving version. — Ch. 5
- You cannot practice consequence. — Ch. 42
- You cannot price your way out of a clause. — Ch. 15
- You cannot prove a delay in it. — Ch. 14
- You cannot prove the counterfactual. — Ch. 27
- You cannot report status honestly. — Ch. 14
- You cannot resequence a problem you find late. — Ch. 9
- You cannot see it — Ch. 6
- you cannot self-resolve a conflict. — Ch. 25
- You cannot self-resolve this. — Ch. 7
- You cannot sequence enclosure by area. — Ch. 14
- You control the list. — Ch. 40
- You did, and you do. — Ch. 32
- You do not need to have swung a hammer — Ch. 1
- You do not pay on the drone number. — Ch. 39
- You do not stop writing tickets. — Ch. 31
- You find the pattern while it is small. — Ch. 40
- You get one chance below grade. — Ch. 9
- you get the market you build. — Ch. 15
- You give notice of the event, not of the number. — Ch. 29 33
- You have just given away the impact claim — Ch. 33
- you have not made a blunder — Ch. 11
- you have to model it before you can measure it. — Ch. 41
- You know your walkaway. — Ch. 33
- You look at transitions. — Ch. 9
- you might be wrong — Ch. 41
- You must break the right cylinders. — Ch. 22
- You owe the more demanding of the two, always. — Ch. 7
- You spend your money where it can win. — Ch. 33
- you still stamped it. — Ch. 39
- you take the work back. — Ch. 41
- You will run a project on paper. — Ch. 1
- you. — Ch. 19
- You. — Ch. 20 7
- Your best people are gone. — Ch. 40
- Your best subs stop bidding. — Ch. 13
- Your credibility becomes an asset. — Ch. 33
- Your deliverable has four parts. — Ch. 28
- Your deliverable has six parts. — Ch. 29
- your entire remaining retention — Ch. 40
- Your four tasks. — Ch. 37
- Your leverage is — Ch. 3
- your organization — Ch. 21
- your own — Ch. 27
- your own crew — Ch. 27
- your own job cost history — Ch. 6
- Your own network. — Ch. 42
- your own review and transmittal time — Ch. 17
- your own summary — Ch. 42
- your pipeline — Ch. 20
- Your pre-punch. — Ch. 40
- Your project completion date did not move. — Ch. 29
- Your project. — Ch. 31
- Your proposed solution — Ch. 25
- your proposed solution with a reason — Ch. 25
- Your published schedule — Ch. 6
- your reputation on changes is a priced asset. — Ch. 31
- Your RFI log is a reputation. — Ch. 25
- Your role starts — Ch. 3
- Your subcontractors have sent their B-crews. — Ch. 40
- Your task. — Ch. 15 17 18 2 24
- Your tasks. — Ch. 29 6
- Your three options. — Ch. 24
- yours — Ch. 22
- Yourself — Ch. 42
- zero — Ch. 14 39
- zero days — Ch. 3
- zero days of float anywhere in the chain. — Ch. 16
- zero dollars. — Ch. 39
- zero float — Ch. 16 29
- zero for every activity in this network — Ch. 14
- zero mandatory constraints. — Ch. 14
- zero recordable injuries — Ch. 24
- zones — Ch. 27