Index

Generated from key terms defined across the book. Chapter numbers link to the chapter.

  • A 4D sequence for one hard week — Ch. 35
  • A backup pump. — Ch. 21
  • A building grid — Ch. 18
  • a bulletin is not a directive — Ch. 7
  • A caution about the personal diary. — Ch. 26
  • A certificate of insurance is not coverage. — Ch. 5
  • A change in appearance, weight, or hygiene — Ch. 41
  • a change order that has not been written — Ch. 28
  • a checklist — Ch. 6
  • A clean example. — Ch. 15
  • A close-in release is a hold point. — Ch. 23
  • A code that has not moved in three months — Ch. 28
  • A comparison to historical normals — Ch. 18
  • A construction change directive — Ch. 25
  • A coordination process that stops at sign-off — Ch. 35
  • A cost cap. — Ch. 39
  • a cost code, opened before the impact happens. — Ch. 31
  • A date — Ch. 27
  • A dedicated make-ready or production manager — Ch. 27
  • A design error or omission. — Ch. 31
  • A detail callout — Ch. 7
  • A drawing log with revision levels. — Ch. 7
  • A duration of roughly 1 to 20 work days. — Ch. 14
  • A facilitator who is not the boss. — Ch. 27
  • A failure sends you back to find the source — Ch. 36
  • A fee in dollars, not a percentage. — Ch. 4
  • A field mockup — Ch. 23
  • A fixed budget. — Ch. 3
  • A fixed window — Ch. 39
  • A genuine opportunity to cure — Ch. 19
  • A hidden or differing site condition. — Ch. 31
  • A hidden-exclusion bid — Ch. 12
  • A hold point mislabeled as a witness point. — Ch. 23
  • A humane schedule is a health intervention — Ch. 41
  • A hungry contractor makes bad decisions — Ch. 2
  • A kill criterion — Ch. 39
  • a lag is a duration with no owner. — Ch. 14
  • A laser level / rotating laser — Ch. 18
  • A laser plummet — Ch. 18
  • A layout robot — Ch. 18
  • A layout verification step. — Ch. 7
  • A life event you know about — Ch. 41
  • A low number is a question, not an answer. — Ch. 13
  • A material-handling plan is a safety plan. — Ch. 18
  • a measured strength instead of a fixed duration. — Ch. 39
  • A miss is safe to declare. — Ch. 27
  • a model you cannot trust is worse than no model, — Ch. 39
  • a money question — Ch. 31
  • A monthly cut-off memo — Ch. 28
  • a name and a number on every tag and every badge — Ch. 24
  • a named human owner — Ch. 27
  • A named interpreter for incidents and discipline — Ch. 41
  • A named owner — Ch. 39
  • A named person — Ch. 27
  • A named person and a date — Ch. 26
  • A near-miss report is never a disciplinary event. — Ch. 24
  • A necessary framing before anything else. — Ch. 41
  • A neutral can say things the parties cannot. — Ch. 33
  • A note on the fee arithmetic — Ch. 24
  • a number made comfortable instead of true. — Ch. 11
  • A number without a source is worth zero. — Ch. 33
  • A one-way consequential damages waiver. — Ch. 15
  • A performance mockup — Ch. 23
  • A phase and its end milestone. — Ch. 27
  • A phased opening. — Ch. 3
  • A plan revision mid-community. — Ch. 37
  • A pre-registered success criterion — Ch. 39
  • A pre-submittal meeting for complex packages. — Ch. 25
  • A project benchmark — Ch. 18
  • A project with no agreed origin will waste weeks. — Ch. 35
  • A qualified bid — Ch. 12
  • A queue is visible on the ground. — Ch. 37
  • A quote excluded something — Ch. 12
  • A quoted material price has a shelf life. — Ch. 12
  • a rate — Ch. 38
  • A ratio of about 23 to 1 — Ch. 41
  • A relationship in which bad news travels early — Ch. 33
  • A request — Ch. 33
  • A right in the subcontract. — Ch. 19
  • A round number in the forecast column — Ch. 28
  • A savings split worth having. — Ch. 3
  • a schedule of collection dates. — Ch. 40
  • a scope question — Ch. 31
  • A scope-gap hunt finds double-buys too. — Ch. 16
  • A section callout — Ch. 7
  • A shared risk/reward pool. — Ch. 3
  • A shopped price gets recovered in scope. — Ch. 13
  • A single controlled gate — Ch. 18
  • A single planner holds the model — Ch. 27
  • A spare-parts strategy — Ch. 21
  • A specific, finishable deliverable — Ch. 27
  • A spotter with one job — Ch. 21
  • A state matter — Ch. 42
  • A statement of your entitlement position — Ch. 29
  • A statutory notice deadline is a wall. — Ch. 5
  • A stop-point decision — Ch. 21
  • A structured document review — Ch. 6
  • A subcontractor in distress. — Ch. 28
  • A submittal log is a schedule. — Ch. 25
  • a substantiated impact component — Ch. 31
  • A substitution transfers risk to you. — Ch. 7
  • A surety is not an insurer. — Ch. 5
  • A threshold test — Ch. 18
  • A time impact analysis inserts a fragnet — Ch. 33
  • a time question — Ch. 31
  • A total station — Ch. 18
  • A verb-noun-location name. — Ch. 14
  • A walk of the building — Ch. 29
  • A wall. — Ch. 27
  • A warning about double counting. — Ch. 6
  • A witness point mislabeled as a hold point. — Ch. 23
  • A word on EIFS, — Ch. 9
  • A written authorization threshold — Ch. 4
  • A written definition of the cost of the work — Ch. 4
  • A written notice of the backcharge — Ch. 19
  • A written pour plan — Ch. 21
  • A-1 — Ch. 7
  • A-103 — Ch. 25
  • A-107 — Ch. 25
  • A-118. — Ch. 26
  • A-119. — Ch. 26
  • A-120. — Ch. 26
  • A-121. — Ch. 26
  • A-122. — Ch. 26
  • A-421 — Ch. 25
  • A. Value concentration — Ch. 39
  • A/E — Ch. 3
  • AACE International — Ch. 11 29 42
  • AAN — Ch. 25
  • Abatement. — Ch. 24
  • ABC — Ch. 42
  • ability to influence the outcome — Ch. 6
  • ability to influence what the building costs — Ch. 1
  • Able to hold two incompatible facts at once. — Ch. 1
  • abnormal — Ch. 33
  • about 1.3 to 1. — Ch. 35
  • About 7 hours of elapsed time, once — Ch. 23
  • About the work, never the person — Ch. 41
  • Above 1.00 — Ch. 24
  • above 1.00 — Ch. 38
  • above-ceiling inspection — Ch. 9
  • ABOVE-CEILING INSPECTION (HOLD POINT) — Ch. 9
  • Above-ceiling MEP — Ch. 9
  • above-ceiling rough-in inspection — Ch. 10
  • Absence — Ch. 41
  • Absenteeism and turnover. — Ch. 20
  • Absenteeism rises — Ch. 20
  • Absorb it, and say so out loud. — Ch. 33
  • Absorption rate and cycle time — Ch. 37
  • Accelerated bridge construction (ABC) — Ch. 38
  • Acceleration — Ch. 29 31
  • Acceleration (directed) — Ch. 33
  • Acceleration costs — Ch. 33
  • Accept — Ch. 11 16 6
  • accept — Ch. 6
  • Accept as modified — Ch. 11
  • Accept partial — Ch. 16
  • Acceptance testing. — Ch. 8
  • Acceptance. — Ch. 23
  • accepted — Ch. 31 40
  • ACCEPTED TOTAL (13 items) — Ch. 11
  • Access — Ch. 11 15
  • Access above hard ceilings — Ch. 10
  • Access and egress. — Ch. 18
  • Access and housekeeping — Ch. 22
  • Access and material availability. — Ch. 20
  • Access credentials — Ch. 40
  • access from below for service. — Ch. 10
  • Access panels — Ch. 16
  • Access. — Ch. 22 8
  • Accountability does not transfer to a tool. — Ch. 39
  • Accounting — Ch. 28
  • Accounting looks backward and must be right. — Ch. 28
  • Accounts payable coding — Ch. 28
  • accrual — Ch. 28
  • accrual schedule — Ch. 28
  • accruals — Ch. 28
  • Accruals are not optional. — Ch. 28
  • Accrue. — Ch. 30
  • ACI — Ch. 8
  • ACI 318 — Ch. 8
  • ACI 347 — Ch. 22 8
  • ACI publishes guidance for both — Ch. 8
  • Action — Ch. 25
  • action — Ch. 25
  • Action / owner / due — Ch. 7
  • Actions. — Ch. 26
  • Activity — Ch. 27
  • activity — Ch. 28
  • Activity count and average duration — Ch. 14
  • Activity duration — Ch. 14
  • Activity G. — Ch. 27
  • activity hazard analysis (AHA) — Ch. 24
  • activity-on-node (AON) — Ch. 14
  • actual — Ch. 28
  • actual charged hours on real jobs — Ch. 20
  • Actual cost (AC) — Ch. 30
  • actual cost, tracked separately — Ch. 40
  • Actual finishes — Ch. 29
  • actual hours charged — Ch. 30
  • actual losses — Ch. 24
  • Actual margin — Ch. 38
  • actual measured quantities — Ch. 4
  • Actual starts — Ch. 29
  • Actual unit rate — Ch. 28
  • Actual unit rate. — Ch. 28
  • actually accelerated — Ch. 29
  • ACWP — Ch. 30
  • add — Ch. 31
  • Add a second hoist. — Ch. 18
  • Add a telehandler for levels 1 and 2. — Ch. 18
  • Added indirect cost — Ch. 29
  • Addenda — Ch. 15 4 7
  • Addenda govern over the base documents — Ch. 7
  • addendum — Ch. 25
  • Addendum — Ch. 25 7
  • Addendum 3 — Ch. 13
  • addendum log — Ch. 15
  • adding capacity — Ch. 37
  • Additional insured status. — Ch. 5
  • Addressed correctly — Ch. 31
  • adds — Ch. 39
  • Adequate forces — Ch. 6
  • Adjacent clinic operations. — Ch. 11
  • Adjacent occupancy — Ch. 15
  • adjusted — Ch. 33
  • Administrative — Ch. 17 24
  • Admixtures — Ch. 8
  • Admixtures. — Ch. 22
  • Adversarial pressure — Ch. 3
  • Advertisement — Ch. 15
  • Advertisement / invitation — Ch. 15
  • Aerial lifts and scissor lifts. — Ch. 24
  • Affidavit of payment of debts and claims — Ch. 40
  • After — Ch. 24
  • after — Ch. 26
  • After you cross it — Ch. 31
  • After you understand this — Ch. 10 14 27 28 3 4
  • After you understand this, — Ch. 19 25 6
  • After you understand this, here is how you think. — Ch. 32
  • After-hours and weekend protocol — Ch. 18
  • against — Ch. 38
  • against the sequences of operations — Ch. 40
  • AGC — Ch. 42
  • Agenda 1 — Ch. 23
  • Agenda 2 — Ch. 23
  • Agenda 3 — Ch. 23
  • Agenda 4 — Ch. 23
  • Agenda 5 — Ch. 23
  • Agenda 6 — Ch. 23
  • Agenda 7 — Ch. 23
  • Agenda 8 — Ch. 23
  • aggregate — Ch. 34
  • Aggregate available — Ch. 34
  • Aggregate available today — Ch. 2
  • aggregate billing position — Ch. 34
  • Aggregate program — Ch. 34
  • Aggregate size — Ch. 8
  • aging report — Ch. 31
  • Agree the coordinate origin in week one. — Ch. 35
  • Agree this in writing before energization. — Ch. 40
  • agreed — Ch. 33
  • Agreement — Ch. 4
  • Aha moment. — Ch. 1 10 11 12 13 14 15 16 17 19 2 20 21 22 23 24 25 26 27 28 29 30 32 33 34 36 37 38 40 41 42 5 6 8 9
  • Ahead and efficient — Ch. 30
  • Ahead but paying for it — Ch. 30
  • AHJ — Ch. 17 25 36 5
  • AHJ enforces the adopted, amended version — Ch. 36
  • AHJ inspection — Ch. 18
  • AIA A101 — Ch. 4
  • AIA A102 — Ch. 4
  • AIA A133 — Ch. 4
  • AIA A201 — Ch. 4
  • AIA G702 / G703 — Ch. 4
  • Air — Ch. 9
  • Air barrier benchmark installation (first 200 SF) — Ch. 23
  • Air barrier continuity — Ch. 36
  • air barrier continuity plan. — Ch. 36
  • air control layer — Ch. 9
  • Air entrainment — Ch. 8
  • air infiltration — Ch. 9
  • air leakage rate — Ch. 7
  • Air-change rates. — Ch. 10
  • Air-contaminant testing — Ch. 36
  • Aircraft registration — Ch. 39
  • Airports — Ch. 38
  • Airspace authorization — Ch. 39
  • AISC — Ch. 8
  • all — Ch. 20
  • all 44,000 BCY — Ch. 8
  • All earthwork — Ch. 17
  • all eleven of those people look busy. — Ch. 20
  • All five — Ch. 33
  • all four — Ch. 9
  • All ground disturbance — Ch. 17
  • All money in writing, before the work — Ch. 37
  • All of them are management habits — Ch. 5
  • all three — Ch. 12
  • All three bidders exclude lead-lined board. — Ch. 13
  • All-in monthly cost — Ch. 21
  • All-or-nothing — Ch. 33
  • All-terrain (AT) crane — Ch. 21
  • Allocated internal rate — Ch. 21
  • Allocation — Ch. 1
  • Allocation. — Ch. 16
  • allowable bearing pressure — Ch. 8
  • allowable cost — Ch. 11
  • allowance — Ch. 12 4 7
  • Allowance — Ch. 4
  • Allowances — Ch. 11 15
  • allowances — Ch. 37
  • Almost certainly not. — Ch. 5
  • Almost certainly yes — Ch. 19
  • altered — Ch. 24
  • alternate — Ch. 4
  • Alternates — Ch. 15
  • alternates — Ch. 7
  • alternating by floor — Ch. 27
  • Aluminum — Ch. 36
  • always a local question — Ch. 36
  • always analyze Type I first. — Ch. 38
  • Always. — Ch. 28
  • Amara Boateng — Ch. 10 40
  • amount and times — Ch. 26
  • Amount billed to date — Ch. 34
  • An allowance of anticipated adverse weather days — Ch. 18
  • an audit tests the WIP schedule. — Ch. 34
  • an EAC is not a claim. — Ch. 30
  • An early bad CPI is probably the number. — Ch. 30
  • An independent estimate. — Ch. 3
  • An occupied adjacent clinic. — Ch. 3
  • an offer — Ch. 19
  • An order-of-precedence clause — Ch. 13
  • An owner-directed change. — Ch. 31
  • An RFI response that adds scope is a change. — Ch. 25
  • An unrecognized cost overrun — Ch. 34
  • Analyzing delay after the fact. — Ch. 27
  • anchor bolt and embed submittal — Ch. 16
  • Anchor bolts and embeds — Ch. 25
  • Anchor bolts and embeds. — Ch. 25
  • Anchor tolerance. — Ch. 9
  • anchor-bolt and embed package — Ch. 8
  • Anchorage. — Ch. 24
  • Anchoring. — Ch. 6
  • Anchors installed at truss set — Ch. 37
  • and — Ch. 13 14 23 24 25 27 29 33 35 5
  • And act the same day — Ch. 15
  • and foreman — Ch. 23
  • And here is the moment. — Ch. 29
  • And here is the wrinkle nobody tells you about. — Ch. 12
  • and hours — Ch. 26
  • And it adds one genuinely new risk. — Ch. 12
  • And it helps every other trade on the line — Ch. 37
  • And it is blind above the top box — Ch. 6
  • And it shows the deferred items — Ch. 40
  • And look at the last row of the negative period. — Ch. 32
  • and modeled — Ch. 36
  • and near-miss reporting has fallen to one. — Ch. 41
  • And notice the incentive shift. — Ch. 38
  • And now the part I want you to actually keep. — Ch. 24
  • And now the part that a manager must not duck. — Ch. 39
  • And one option that does not work. — Ch. 21
  • And Pri bought speed. — Ch. 31
  • And put the offset on the same page. — Ch. 31
  • And that is the go/no-go implication. — Ch. 34
  • And the 8 days you own. — Ch. 33
  • And the crew has mentally moved on. — Ch. 40
  • and the crew who will do the work — Ch. 23
  • And the finding that mattered. — Ch. 22
  • And the honest note. — Ch. 42
  • And the one that indicts management directly. — Ch. 20
  • And the one with no arithmetic. — Ch. 6
  • And the page was incomplete. — Ch. 29
  • And the sentence to keep. — Ch. 19
  • And the social pressure. — Ch. 6
  • And the weight is real. — Ch. 42
  • and then keep evaluating anyway — Ch. 33
  • and time — Ch. 31
  • And use your notice provisions. — Ch. 36
  • and version — Ch. 36
  • And what Dani got wrong. — Ch. 42
  • And what Meridian gave up. — Ch. 3
  • and wrote the rule — Ch. 35
  • and you hold the documentation for each one — Ch. 36
  • and you need the relationship intact — Ch. 41
  • And you still finish late — Ch. 6
  • anhydrous calcium chloride test — Ch. 9
  • Announce the number. — Ch. 39
  • Annual / discretionary bonus — Ch. 42
  • Answer each before you read the response. — Ch. 24
  • Answer fast. — Ch. 37
  • Answer four questions. — Ch. 19 7
  • anti-indemnity statutes — Ch. 16 24
  • Anticipated adverse weather days — Ch. 6
  • Anticipation — Ch. 1
  • Any deviation from the standard. — Ch. 37
  • any float. — Ch. 37
  • Anything that blocks a life-safety route loses — Ch. 18
  • Anything with a truck already rolling wins — Ch. 18
  • APM on a smaller job — Ch. 42
  • Apparent savings — Ch. 16
  • Appeal rights are extremely limited — Ch. 33
  • Appealable — Ch. 33
  • application for payment — Ch. 32
  • Apply — Ch. 11
  • appointments measured in minutes — Ch. 18
  • Apportioned effort — Ch. 30
  • Apportionment by cause — Ch. 33
  • Appraisal — Ch. 23
  • Apprentice — Ch. 20 42
  • Apprenticeship. — Ch. 20
  • Approved as noted — Ch. 25
  • approved as noted — Ch. 25
  • Approved change orders move BAC. — Ch. 30
  • Approved changes — Ch. 28
  • approved sealed design — Ch. 25
  • approved submittal — Ch. 23
  • approximate industry heuristic — Ch. 34
  • approximate industry heuristics, hedged — Ch. 34
  • Apr 1 — Ch. 29
  • Apr 11 — Ch. 29
  • Apr 14 — Ch. 27
  • Apr 15 — Ch. 29
  • Apr 22 — Ch. 27
  • Apr 8 — Ch. 27
  • April 1 — Ch. 27
  • April 14 — Ch. 27
  • April 14, Year 1 — Ch. 25 9
  • April 15, Year 1 — Ch. 25
  • April 16, Year 1 — Ch. 25
  • April 21 — Ch. 16 29
  • April 25, Year 2 — Ch. 5
  • April 6 through April 15 — Ch. 33
  • April 7 — Ch. 25 29
  • April 7. — Ch. 40
  • April 8, Year 2 — Ch. 27
  • April 9 through April 15 — Ch. 33
  • April 9, Year 1 — Ch. 9
  • Arbitration — Ch. 33 5
  • Arbitration is no longer necessarily cheap. — Ch. 33
  • Arch / ceilings — Ch. 35
  • archaeology — Ch. 40
  • Architect — Ch. 1
  • Architect and engineer decisions. — Ch. 36
  • architectural — Ch. 10
  • Architectural precast panels — Ch. 13
  • architecture — Ch. 26
  • Architecture. — Ch. 42
  • Are permanent fall-protection anchors designed in — Ch. 11
  • area — Ch. 14
  • areas — Ch. 35
  • argue about line by line — Ch. 11
  • Article 2 of the Uniform Commercial Code (UCC) — Ch. 16
  • Artificial intelligence — Ch. 39
  • as certified — Ch. 32
  • As good as the estimator — Ch. 28
  • as installed — Ch. 23
  • As Late As Possible — Ch. 14
  • as the work happens — Ch. 36
  • As-built — Ch. 7
  • As-built capture at closeout. — Ch. 39
  • As-built drawings — Ch. 35
  • As-built model — Ch. 35
  • As-built progress at data date 150 — Ch. 29
  • as-built survey — Ch. 16
  • As-builts and closeout submittals — Ch. 16
  • as-builts lie. — Ch. 8
  • As-builts monthly, tied to the pay application — Ch. 25
  • As-planned vs. as-built — Ch. 33
  • Asbestos — Ch. 5
  • asbestos — Ch. 5
  • Ashfield. — Ch. 15
  • ASHRAE Standard 90.1 — Ch. 10 36
  • ASI — Ch. 25 7
  • Ask for the change before you spend the money. — Ch. 15
  • Ask for the time separately from the money — Ch. 38
  • ask the direct question in your review — Ch. 42
  • Ask the foremen first. — Ch. 41
  • Ask what is under the mat. — Ch. 21
  • Ask who owns it under the subcontracts — Ch. 10
  • Ask your foreman. They know. Almost nobody asks. — Ch. 20
  • ASP — Ch. 42
  • Asphalt paving temperature — Ch. 38
  • assemblies — Ch. 38
  • assembly — Ch. 11 39 9
  • Assembly / location — Ch. 7
  • Assembly total — Ch. 11 36
  • Assertion. — Ch. 32
  • asset — Ch. 34
  • ASSETS — Ch. 34
  • Assign a buddy — Ch. 24
  • assigned to a subcontractor by name. — Ch. 36
  • Assistant project manager — Ch. 1
  • Assistant project manager (APM) — Ch. 42
  • assume responsibility — Ch. 7
  • Assume you are not. — Ch. 5
  • Assumptions — Ch. 11
  • assumptions — Ch. 12
  • assured equipment grounding conductor program — Ch. 18 24
  • at any level. — Ch. 36
  • at award and again at mobilization — Ch. 5
  • at least as effective — Ch. 24
  • at least four times the maximum intended load — Ch. 22
  • at least roughly 200 to 400 man-hours. — Ch. 28
  • at or below 4.5 MH/LF — Ch. 39
  • at substantial completion — Ch. 40
  • at the building line — Ch. 16
  • at the end of each working day — Ch. 26
  • at the load center you actually have — Ch. 21
  • at the package level, this month. — Ch. 30
  • at the start of — Ch. 23
  • at the start of the project — Ch. 33
  • at the wall, by the two trades involved, — Ch. 27
  • At three days, take the week. — Ch. 21
  • At three weeks, take the month. — Ch. 21
  • at transitions — Ch. 36
  • Attach the prime contract. — Ch. 16
  • Attach the rate schedule. — Ch. 4
  • Attachment matters as much as the membrane. — Ch. 9
  • Attachments — Ch. 29
  • Attic stock and extra materials — Ch. 40
  • Attrition of reliability — Ch. 41
  • audit — Ch. 11
  • Audit — Ch. 34
  • Aug 1 — Ch. 29
  • Aug 27, Year 1 — Ch. 29
  • Aug 4 — Ch. 29
  • Auger boring / jack-and-bore — Ch. 38
  • Auger-cast piles — Ch. 8
  • August 17, Year 1 — Ch. 16
  • August 18, Year 3 — Ch. 40
  • August 2, Year 1 — Ch. 16 25
  • August 24, Year 2 — Ch. 6
  • August 27 — Ch. 10 29 8
  • August 27 instead of August 4, Year 1 — Ch. 14
  • August 27, Year 1 — Ch. 29 39 4 8
  • August 3, Year 1 — Ch. 16
  • August 31 — Ch. 32
  • August 4 — Ch. 29 39 4
  • August 4 of Year 1 — Ch. 21
  • August 4 to August 27 of Year 1 — Ch. 26
  • August 4 to August 27, Year 1 — Ch. 2 25
  • August 4, Year 1 — Ch. 10 16 39 8
  • authority — Ch. 17 31
  • authority having jurisdiction — Ch. 17 5
  • authority having jurisdiction (AHJ) — Ch. 40
  • Autodesk Construction Cloud — Ch. 39
  • Availability — Ch. 11 21
  • availability — Ch. 21
  • Available cavity — Ch. 10
  • Avoid — Ch. 6
  • award date — Ch. 25
  • Award or protest — Ch. 15
  • award-by date — Ch. 25
  • Awarded 3/10 — Ch. 16
  • Awarded 3/12 — Ch. 16
  • Awarded 3/17 — Ch. 16
  • Awarded 3/18 — Ch. 16
  • Awarded 3/19 — Ch. 16
  • Awarded 3/20 — Ch. 16
  • Awarded 3/6 — Ch. 16
  • Awarded 3/7 — Ch. 16
  • B (LS 5), C (LS 9) — Ch. 14
  • B first, A as a bridge. — Ch. 37
  • B-9, and it is 140 feet away — Ch. 8
  • B. Adoption surface — Ch. 39
  • B2010 Exterior Walls — Ch. 7
  • B2020 Exterior Windows — Ch. 7
  • B3010 Roof Coverings — Ch. 7
  • BAC — Ch. 30
  • back — Ch. 9
  • back to you, in their own words — Ch. 41
  • back-schedule — Ch. 10
  • back-schedule each one from the date it gates — Ch. 17
  • Backcharge — Ch. 19 40
  • Backcharge rights — Ch. 16
  • Backcharges you will not recover. — Ch. 28
  • Backer rod is not filler. — Ch. 9
  • backfill — Ch. 8
  • Backflow preventer certification — Ch. 40
  • backing up — Ch. 24
  • Backlog — Ch. 13 2
  • Backlog in months — Ch. 2
  • Backlog says sell. — Ch. 34
  • Backlog-to-working-capital — Ch. 16
  • Backshoring. — Ch. 22
  • backward-looking — Ch. 16
  • Bad forecasting culture. — Ch. 34
  • Badging and orientation stickers — Ch. 18
  • balanced — Ch. 38
  • Balanced rates — Ch. 38
  • Band — Ch. 15
  • Bank — Ch. 8
  • Bank (BCY) — Ch. 21
  • bank measure — Ch. 12 8
  • Bar chart (Gantt) — Ch. 14
  • Bar sizes follow the eighth-inch rule. — Ch. 8
  • Bare rental — Ch. 21
  • barrier — Ch. 9
  • BAS — Ch. 10
  • Base bid — Ch. 13
  • Base bid as submitted — Ch. 13
  • base hourly rate — Ch. 20
  • base of the wall below the window — Ch. 9
  • Base of wall — Ch. 9
  • Base salary — Ch. 42
  • Base subject to contingency — Ch. 6
  • Base unit cost — Ch. 11
  • Base wage — Ch. 20
  • base wage — Ch. 20
  • Baseline — Ch. 29
  • Baseline CPM schedule — Ch. 17
  • Baseline float — Ch. 29
  • baseline requirements, not credentials. — Ch. 42
  • Basic (fundamental) commissioning — Ch. 40
  • basic rate of pay — Ch. 20
  • Basis for recommendation. — Ch. 16
  • basis of estimate — Ch. 13
  • basis of payment — Ch. 4
  • Basis of proposal — Ch. 15
  • bays — Ch. 8
  • BCWP — Ch. 30
  • BCWS — Ch. 30
  • be careful what you write. — Ch. 5
  • Be concrete. — Ch. 41
  • Be consistent. — Ch. 41
  • Be honest about what you cannot influence. — Ch. 36
  • be slow to start the ladder and fast to climb it. — Ch. 19
  • Bea Salgado — Ch. 6
  • Became critical — Ch. 14
  • Because they did the arithmetic. — Ch. 33
  • Bedding and backfill are structural, not cleanup. — Ch. 38
  • before — Ch. 16 21 23 24 26 31 4 5 9
  • before anybody knew there would be an argument. — Ch. 26
  • before award — Ch. 15
  • Before each shift — Ch. 22
  • before each shift — Ch. 24
  • before it is buried. — Ch. 35
  • before move-in overwhelms the facilities staff — Ch. 40
  • before production fabrication starts. — Ch. 9
  • before the building ever opens — Ch. 36
  • before the first worker performs the first task — Ch. 17
  • before the GMP is even final — Ch. 9
  • Before you cross this threshold — Ch. 24 31
  • Before you understand this — Ch. 10 14 27 28 4
  • Before you understand this, — Ch. 19 25 6
  • Before you understood this — Ch. 3
  • Before. — Ch. 37
  • behavior and collaborative capability — Ch. 15
  • behind — Ch. 36 9
  • Behind and over — Ch. 30
  • Behind but efficient — Ch. 30
  • Being right. — Ch. 42
  • Believing — Ch. 34
  • Bellweather flatbed in — Ch. 18
  • below — Ch. 37
  • Below 1.00 — Ch. 24
  • below 1.00 — Ch. 38
  • Below 300 decline — Ch. 15
  • below 60 — Ch. 16
  • below the line rate — Ch. 37
  • below-grade waterproofing damage during backfill — Ch. 9
  • Benchmark (first-work) installation — Ch. 23
  • benchmark installation — Ch. 23
  • Beneficial occupancy — Ch. 40
  • Benefit funds. — Ch. 20
  • Best fit — Ch. 4
  • Best for — Ch. 33
  • Best. — Ch. 33
  • better — Ch. 38
  • Better numbers at buyout. — Ch. 32
  • Between projects — Ch. 28
  • BID AMOUNT — Ch. 12
  • Bid and P&P bonds — Ch. 5
  • bid bond — Ch. 15
  • Bid bond — Ch. 5
  • Bid form — Ch. 15
  • bid form — Ch. 15
  • bid package — Ch. 16
  • Bid peddling — Ch. 13 15 16
  • bid protest — Ch. 15
  • Bid protests — Ch. 5
  • Bid rate — Ch. 38
  • Bid rotation — Ch. 15
  • bid schedule — Ch. 38
  • Bid shopping — Ch. 13 15 16
  • bid shopping — Ch. 15 2
  • Bid unit price — Ch. 38
  • bid-day requirement — Ch. 36
  • Bid-tab spread, decoded. — Ch. 15
  • bilateral — Ch. 38
  • Bilingual delivery of every toolbox talk — Ch. 41
  • Bilingual signage where it matters — Ch. 41
  • Bill accurately the first time — Ch. 32
  • BIM — Ch. 1 35
  • BIM / VDC planning — Ch. 11
  • BIM execution plan — Ch. 35
  • binary — Ch. 27
  • Bioretention areas and rain gardens — Ch. 36
  • Blast plan — Ch. 38
  • Blasting — Ch. 38
  • blasting — Ch. 38
  • Blocking and backing — Ch. 16
  • blower door test — Ch. 37
  • blower door test and a duct leakage test — Ch. 37
  • Bluebeam — Ch. 39
  • Bodies cannot do it. — Ch. 20
  • bolts up — Ch. 8
  • Bond and insurance costs — Ch. 33
  • Bond and insurance. — Ch. 31
  • bond around the lien — Ch. 5
  • bonded public — Ch. 5
  • Bonding — Ch. 13 19
  • Bonding capacity — Ch. 2
  • bonding program — Ch. 5
  • booked today — Ch. 40
  • boom lift — Ch. 24
  • Boom lift (articulating or telescopic) — Ch. 21
  • Boom lift BL-3 — Ch. 26
  • Boom pump — Ch. 21
  • Boom. — Ch. 2
  • boring logs — Ch. 38
  • Boring logs — Ch. 8
  • both — Ch. 11
  • Both are serious findings. — Ch. 34
  • Both are written instruments. — Ch. 26
  • both arguments have real content. — Ch. 20
  • both chains are drawn heavy — Ch. 29
  • both faces of the wall — Ch. 12
  • both sign — Ch. 31
  • Both systems complete at that corner. — Ch. 27
  • both things, separately, in the same package — Ch. 29
  • Both, and this is where it breaks — Ch. 7
  • Bottom-up. — Ch. 6
  • Bought budget — Ch. 28
  • Bound the extent. — Ch. 23
  • boundary — Ch. 7
  • bounds the extent honestly — Ch. 23
  • Brace release — Ch. 22
  • braces removed early — Ch. 22
  • branch — Ch. 10
  • Branch duct, flex duct, small pipe — Ch. 10
  • Branch wiring — Ch. 10
  • break and eating areas — Ch. 18
  • Break the alignment into two work zones — Ch. 38
  • Break the package up. — Ch. 13
  • BREEAM — Ch. 36
  • Brenner Street Parking Structure — Ch. 34
  • brevity — Ch. 14
  • Bricklaying machine — Ch. 39
  • Bridges and structures — Ch. 38
  • Bridging documents — Ch. 3
  • Bring a bigger crane. — Ch. 21
  • Bring a plan, not just a number. — Ch. 29
  • Bring the schedule — Ch. 31
  • Broad form — Ch. 5
  • bubble — Ch. 7
  • Bucket capacity — Ch. 21
  • Budget — Ch. 28
  • Budget load and cost-code structure — Ch. 17
  • Budget man-hours — Ch. 20
  • budget overrun — Ch. 11
  • budget transfer — Ch. 28
  • buffer — Ch. 37
  • buffer between trades across eleven houses — Ch. 37
  • buffer space — Ch. 38
  • build requirement with a test attached. — Ch. 36
  • Build the project-specific plan — Ch. 15
  • Build the remaining seven. — Ch. 4
  • Build these seven pieces. — Ch. 14
  • Buildability — Ch. 11
  • building automation system — Ch. 10
  • Building dried-in / enclosed — Ch. 9
  • building dried-in, March 28, Year 2. — Ch. 27
  • building dried-in. — Ch. 27
  • building information modeling — Ch. 1
  • Building information modeling (BIM) — Ch. 35
  • Building product disclosure and optimization — Ch. 36
  • Built-up (BUR) — Ch. 9
  • Bulletin — Ch. 25 7
  • bulletin or proposal request — Ch. 25
  • burden multiplier — Ch. 11
  • burdened — Ch. 11 31
  • burdened rate — Ch. 12
  • Burdened saving — Ch. 11
  • burn ratio — Ch. 6
  • Burnout is a genuine, structural problem — Ch. 42
  • Business auto — Ch. 5
  • Business development / preconstruction — Ch. 42
  • But be honest about what that is worth. — Ch. 21
  • But look at the timing. — Ch. 2
  • But several will get you an interview — Ch. 42
  • But the tickets are the credit. — Ch. 36
  • buy or rent — Ch. 22
  • Buy that person every time. — Ch. 20
  • Buy the credit back elsewhere — Ch. 36
  • Buy the switchgear three weeks earlier — Ch. 16
  • buyer under contract — Ch. 37
  • buying — Ch. 7
  • Buying the job — Ch. 13
  • Buying the job low to make it up on changes. — Ch. 31
  • Buying work — Ch. 2
  • Buyout — Ch. 16
  • buyout — Ch. 36
  • by 3/12 — Ch. 26
  • by 3/13 — Ch. 26
  • by 3/15 — Ch. 26
  • by 3/20 — Ch. 26
  • By area — Ch. 16
  • by area — Ch. 27
  • By CSI trade — Ch. 16
  • by elevation — Ch. 29
  • by name and by function — Ch. 33
  • by name and by shift — Ch. 24
  • By phase — Ch. 16
  • By system — Ch. 16
  • byproducts of the work — Ch. 40
  • C-2 — Ch. 7
  • C. Work displacement — Ch. 39
  • Cable tray — Ch. 10
  • calculated — Ch. 14
  • calculated result — Ch. 37
  • Calculation methods drift. — Ch. 36
  • Calculations / delegated design — Ch. 25
  • Caldwell Structural (engineer of record) review — Ch. 8
  • Caldwell Structural review (contractual period) — Ch. 16
  • Caldwell was not late. — Ch. 8
  • calendar — Ch. 14
  • calendar days — Ch. 1 27 29
  • calendar days (CD) — Ch. 14
  • Calendars, practically. — Ch. 14
  • Call the vendor — Ch. 27
  • Cameras with recorded, remotely monitored feeds — Ch. 18
  • Can — Ch. 23
  • Can prevent it. — Ch. 40
  • can travel with a load — Ch. 21
  • cannot audit an open book. — Ch. 4
  • cannot be manufactured on demand. — Ch. 42
  • cap the mobilization pay item — Ch. 38
  • Capacity — Ch. 13 34
  • capacity — Ch. 37
  • capacity and their cash. — Ch. 2
  • capacity ceiling — Ch. 37
  • Capacity is indexed on radius, not boom length. — Ch. 21
  • Capacity. — Ch. 5
  • capillary voids — Ch. 8
  • Capital — Ch. 34
  • capital economics — Ch. 21
  • capital or finance lease — Ch. 21
  • Capital. — Ch. 5
  • capped pursuit budget — Ch. 15
  • Capture every wall before it closes. — Ch. 39
  • capturing it in a structured form as it arrives — Ch. 35
  • Cardinal box truck in — Ch. 18
  • Cardinal Mechanical and Summit Roofing — Ch. 25
  • Cardinal Mechanical bought out and licensed — Ch. 17
  • career-path clarity — Ch. 20
  • carefully study and compare — Ch. 7
  • Carpenter — Ch. 20
  • Carried in the estimate — Ch. 12
  • Carried in the GMP (rounded) — Ch. 6
  • carry — Ch. 37
  • Carry a qualified allowance and say so out loud. — Ch. 13
  • Carrying cost and timing — Ch. 37
  • case study 2 — Ch. 11
  • Casework and specialties — Ch. 9
  • Cash flow is not profit. — Ch. 40
  • cash flow is not profit. — Ch. 40
  • Cash is a fact about Friday — Ch. 32
  • Cash troughs happen where production decelerates — Ch. 32
  • Cash, end of year — Ch. 34
  • cash-flow and default risk — Ch. 13
  • cash-flow curve — Ch. 14 32
  • Cast-in-place — Ch. 8
  • Cast-in-place concrete — Ch. 23 8
  • Cast-in-place on falsework — Ch. 38
  • Categories are counted and trended, — Ch. 27
  • Categorize the causes. — Ch. 37
  • Category — Ch. 27
  • Caught in or between equipment. — Ch. 24
  • Caught-in/between — Ch. 24
  • caught-in/caught-between — Ch. 21
  • Caulking and sealants — Ch. 16
  • Causation — Ch. 33
  • causation — Ch. 33
  • Causation and damages. — Ch. 33
  • Causation. — Ch. 25 33
  • cause — Ch. 19
  • CCD — Ch. 25 7
  • CCIP — Ch. 5
  • CCM — Ch. 42
  • CCP — Ch. 42
  • CD / WD — Ch. 12
  • CDC — Ch. 41
  • ceiling — Ch. 37
  • Ceiling grid — Ch. 9
  • Ceiling tile — Ch. 9
  • Ceilings are at 350 for coordination, not 300. — Ch. 35
  • Ceilings, soffits, bulkheads — Ch. 35
  • Cement type, slump, and mix constituents. — Ch. 22
  • center of rotation — Ch. 21
  • center-of-glass — Ch. 9
  • CEP — Ch. 42
  • certainty — Ch. 4
  • Certificate of Occupancy — Ch. 17
  • Certificate of occupancy — Ch. 40
  • Certificate of occupancy (CO) — Ch. 40
  • Certificates — Ch. 40
  • certification — Ch. 36 4
  • certification is a joint product. — Ch. 36
  • Certification is a premium — Ch. 36
  • Certifications and test reports — Ch. 25
  • Certified — Ch. 32
  • certified diversion rate — Ch. 36
  • Certified payroll — Ch. 38
  • certified payrolls — Ch. 5
  • Certified, Silver, Gold, and Platinum — Ch. 36
  • CFO — Ch. 1
  • Chain of custody — Ch. 26
  • Chain-of-custody certification for wood — Ch. 36
  • change — Ch. 22 31
  • Change — Ch. 38
  • Change in contractor result — Ch. 4
  • change order — Ch. 11 17 25 26
  • Change order — Ch. 25
  • Change Order — Ch. 7
  • Change order (CO) — Ch. 31 33
  • Change order request / proposal (COR or PCO) — Ch. 33
  • Change orders — Ch. 16 37
  • change orders. — Ch. 2
  • change to the contract documents — Ch. 11
  • Changed means and methods — Ch. 29
  • Changes — Ch. 4
  • Changes (directed) — Ch. 33
  • Changes only by change order. — Ch. 32
  • Changes to the model — Ch. 29
  • Chapter 13 detailed estimate — Ch. 42
  • Chapter 14 CPM schedule — Ch. 42
  • Chapter 16 buyout log — Ch. 42
  • Chapter 18 site logistics plan — Ch. 42
  • Chapter 24 site-specific safety plan — Ch. 42
  • Chapter 28 cost report — Ch. 42
  • Chapter 31 priced change orders — Ch. 42
  • Chapter 33 delay analysis — Ch. 42
  • Character — Ch. 34
  • character — Ch. 38
  • Character. — Ch. 5
  • characteristic failure mode — Ch. 10
  • Characteristic failure mode — Ch. 3
  • Charge the owner for the as-built deliverable. — Ch. 39
  • chargeable — Ch. 38
  • Chart values are gross. — Ch. 21
  • Check the columns before you go on. — Ch. 32
  • Check the data date and the footing. — Ch. 30
  • Check the footing. — Ch. 30
  • Check the result — Ch. 36
  • Check whether the constraint is creating float. — Ch. 14
  • Check your procurement code. — Ch. 5
  • Check your understanding. — Ch. 1 10 11 12 13 14 15 16 17 18 19 2 20 21 22 23 24 25 26 27 28 29 3 30 31 32 33 34 35 36 37 38 39 4 40 41 42 5 6 7 8 9
  • check yours — Ch. 40
  • check. — Ch. 12
  • Chief estimator — Ch. 1
  • chief executive — Ch. 42
  • Chilled beams — Ch. 10
  • CHST — Ch. 42
  • Circadian fatigue. — Ch. 24
  • Circular. — Ch. 28
  • Cisterns and rainwater harvesting — Ch. 36
  • Cite something. — Ch. 23
  • cited her own track record — Ch. 41
  • cites — Ch. 23
  • cites every source precisely — Ch. 7
  • City of Rivermont Parks & Recreation. — Ch. 2
  • Civil engineering. — Ch. 42
  • Claim — Ch. 31 33
  • claim — Ch. 33
  • claim against your payment bond — Ch. 5
  • Claims are not a moral failure. — Ch. 33
  • Clarification — Ch. 25
  • Clarifications of scope — Ch. 15
  • clash matrix — Ch. 35
  • class — Ch. 24
  • Class 1 — Ch. 11
  • Class 4 — Ch. 11
  • Class 5 — Ch. 11
  • Classification is where the risk lives. — Ch. 38
  • Classification. — Ch. 38
  • Classify — Ch. 38
  • Cleanup — Ch. 16
  • Cleanup and debris removal — Ch. 16
  • clear assumptions page — Ch. 31
  • Clear risk allocation, priced — Ch. 33
  • Clearing — Ch. 8
  • climate zone — Ch. 36
  • clogs permanently — Ch. 36
  • close out — Ch. 42
  • Close the loop out loud. — Ch. 20
  • Closeout — Ch. 13
  • closeout plan — Ch. 39
  • closeout sub-network built at notice to proceed — Ch. 40
  • Closeout submittals — Ch. 25
  • closing conference — Ch. 24
  • Cloud / collaborative platforms — Ch. 14
  • cluster targets — Ch. 11
  • CM / general contractor — Ch. 1
  • CM as agent — Ch. 3
  • CM as Agent (CMa) — Ch. 3
  • CM at Risk — Ch. 16 3 5
  • CM at risk — Ch. 3
  • CM at Risk (CMAR) — Ch. 11
  • CM at risk. — Ch. 3
  • CMa — Ch. 3
  • CMAA — Ch. 42
  • CMAR — Ch. 3
  • CMU first floor — Ch. 8
  • co-location — Ch. 27
  • Co-location. — Ch. 3
  • COBie — Ch. 35
  • code — Ch. 36
  • Code path may be non-standard — Ch. 36
  • Code variation. — Ch. 37
  • coefficient — Ch. 3
  • cold joint — Ch. 1 21 8
  • cold joint in the middle of a structural deck — Ch. 21
  • Cold weather. — Ch. 8
  • Cold-weather protection — Ch. 18
  • Collapse of structures and materials. — Ch. 24
  • Collect by — Ch. 40
  • collect-by — Ch. 40
  • collective bargaining agreement (CBA) — Ch. 20
  • Colton Reyes — Ch. 37
  • column — Ch. 32
  • column line C-4 — Ch. 26
  • Columns and pier caps — Ch. 38
  • Combined daily exposure — Ch. 17
  • Combined footing — Ch. 8
  • Combustion equipment indoors. — Ch. 36
  • comfort, not a proof. — Ch. 31
  • Comfortable with people who are not like them. — Ch. 1
  • Commercial / Institutional — Ch. 2
  • commercial aviation activity — Ch. 39
  • Commercial General Liability (CGL) — Ch. 5
  • Commercial judgment across jobs you do not run — Ch. 42
  • commercial kitchen — Ch. 40
  • commercially useful and reliable — Ch. 42
  • Commingled processing. — Ch. 36
  • commissioned, and actually functional — Ch. 36
  • Commissioning — Ch. 10 36
  • Commissioning (Cx) — Ch. 36 40
  • Commissioning agent — Ch. 1
  • Commissioning agent (CxA) — Ch. 23
  • commissioning agent (CxA) — Ch. 36
  • Commissioning meeting — Ch. 26
  • Commissioning report — Ch. 40
  • Commissioning start — Ch. 10
  • Commissioning support — Ch. 36
  • commitment — Ch. 16 27
  • commitment problem — Ch. 19
  • commitments made — Ch. 27
  • Committed — Ch. 28
  • Committed cost — Ch. 28
  • Committed far below budget, late in the job — Ch. 28
  • Common law — Ch. 5
  • Common law fills the gaps. — Ch. 5
  • Common trap — Ch. 40
  • Communicating with an owner and a lender. — Ch. 27
  • Communication — Ch. 1
  • Community notification. — Ch. 17
  • Compacted — Ch. 8
  • Compacted (CCY) — Ch. 21
  • compacted measure — Ch. 8
  • Company size changes everything. — Ch. 42
  • compensable — Ch. 25
  • Compensable — Ch. 29
  • Compensable or non-compensable — Ch. 33
  • Compensation. — Ch. 42
  • Competence credibility. — Ch. 41
  • Competency includes authority. — Ch. 24
  • competent person — Ch. 22 24 38 8
  • Competing schedules — Ch. 41
  • Competition for shared temporary systems. — Ch. 24
  • Competitive design-build. — Ch. 3
  • Competitive sealed bidding — Ch. 5
  • Compilation — Ch. 34
  • Complaint — Ch. 24
  • Complementary / no hierarchy — Ch. 7
  • Complementary bidding — Ch. 15
  • complete — Ch. 27
  • complete but not conforming or not acceptable — Ch. 23
  • complete to the corridor 3-C header — Ch. 27
  • Complete, coordinated contract documents — Ch. 33
  • complete, Level 2 Zone D — Ch. 27
  • complete, Zone B exam-room pod only — Ch. 27
  • completed — Ch. 5
  • completed operations — Ch. 5
  • Completeness and non-duplication. — Ch. 13
  • Component prefabrication — Ch. 39
  • components — Ch. 37
  • composite cleanup crew — Ch. 18
  • Compressing — Ch. 20
  • Compute four things. — Ch. 22
  • computed — Ch. 38
  • Computer vision on site photos — Ch. 39
  • Concealed conditions — Ch. 6
  • concealment — Ch. 23
  • Concrete — Ch. 36
  • Concrete batch tickets — Ch. 26
  • Concrete cold weather — Ch. 38
  • Concrete design mixes — Ch. 25
  • Concrete design mixes. — Ch. 25
  • Concrete hot weather — Ch. 38
  • concrete masonry unit — Ch. 22
  • Concrete maturity sensors — Ch. 39
  • Concrete pavement — Ch. 38
  • Concrete pour — Ch. 18
  • concurrency — Ch. 31 33
  • concurrent — Ch. 29
  • Concurrent — Ch. 33
  • Concurrent delay — Ch. 29 33
  • Condensation. — Ch. 9
  • condition of payment — Ch. 29
  • condition precedent — Ch. 2 32 33 38 4
  • Conditional — Ch. 32 5
  • conditional — Ch. 32 5
  • Conduit, cable tray, low voltage — Ch. 10
  • Confined space — Ch. 38
  • Confined space. — Ch. 10
  • Confined spaces multiply. — Ch. 36
  • confirming letter — Ch. 26 31
  • CONFIRMING LETTER CL-026 — Ch. 26
  • confirming letter the same day — Ch. 26
  • conformance — Ch. 20
  • Conformance. — Ch. 23
  • Congestion — Ch. 29
  • Congestion. — Ch. 24
  • Connecting. — Ch. 8
  • Connections — Ch. 8
  • Connections are engineered and structural. — Ch. 9
  • Connectors and hold-downs — Ch. 8
  • ConsensusDocs — Ch. 4
  • consent of surety — Ch. 16
  • Consent of surety — Ch. 40
  • Consequence named, honestly — Ch. 41
  • consequential damages waiver — Ch. 4 5
  • Consolidation — Ch. 8
  • Consolidation method. — Ch. 22
  • constraint — Ch. 14 8
  • Constraint — Ch. 27
  • Constraint log — Ch. 27
  • constraint log — Ch. 27
  • constraints — Ch. 21
  • Constructability findings are now change orders. — Ch. 11
  • Constructability input on the imaging suite. — Ch. 3
  • Constructability review — Ch. 11
  • constructability review — Ch. 11 3
  • Construction (the GMP) — Ch. 11
  • Construction accounting and finance — Ch. 42
  • Construction activity pollution prevention — Ch. 36
  • Construction and demolition waste management — Ch. 36
  • construction change directive — Ch. 17 26 31
  • Construction change directive — Ch. 4
  • Construction contingency — Ch. 11 6
  • construction contingency went up — Ch. 11
  • Construction coordination or quantity extraction — Ch. 35
  • construction documents — Ch. 1
  • Construction indoor air quality — Ch. 36
  • Construction indoor air quality management plan — Ch. 36
  • Construction is not a factory. — Ch. 27
  • construction joint — Ch. 8
  • construction loan — Ch. 37
  • Construction management. — Ch. 42
  • construction manager as constructor — Ch. 4
  • construction manager at risk — Ch. 3
  • Construction model — Ch. 35
  • Construction observation — Ch. 40
  • construction put in place — Ch. 2
  • Construction stormwater permit and the SWPPP — Ch. 17
  • Construction waste management — Ch. 36
  • constructive acceleration — Ch. 19
  • Constructive acceleration — Ch. 29 33
  • Constructive change — Ch. 33
  • Consuming float is not extending the project. — Ch. 29
  • contact area — Ch. 12
  • contained — Ch. 30
  • Container — Ch. 18
  • Contaminated soil and materials — Ch. 38
  • contemporaneous — Ch. 33
  • Contemporaneous conflict documentation — Ch. 38
  • Contemporaneous cost records — Ch. 19
  • Contemporaneous cost records for the delay period — Ch. 33
  • Contemporaneous documentation. — Ch. 37
  • contemporaneously — Ch. 26
  • Content — Ch. 33
  • Contents — Ch. 24
  • Contest. — Ch. 24
  • Contingency — Ch. 11 13
  • Contingency drawdown ahead of percent complete — Ch. 28
  • Contingency is not money. It is an admission. — Ch. 11
  • Contingency is not padding. — Ch. 12
  • continuing effect — Ch. 33
  • continuing notice — Ch. 33
  • Continuing notice for ongoing impacts. — Ch. 33
  • continuity across every trade boundary — Ch. 36
  • Continuous (strip) footing — Ch. 8
  • Continuous air barrier — Ch. 36
  • Continuous insulation (CI) — Ch. 36
  • continuous insulation (CI) — Ch. 9
  • continuous work — Ch. 37
  • Contract — Ch. 5
  • Contract amount — Ch. 34
  • contract boundary — Ch. 2
  • Contract is the primary source — Ch. 5
  • contract markups — Ch. 31
  • Contract milestones — Ch. 14
  • Contract sum to date — Ch. 32
  • Contract the deliverable, not the activity. — Ch. 40
  • Contract time — Ch. 1 15 4
  • Contract time. — Ch. 11
  • Contraction. — Ch. 2
  • contractor — Ch. 17 21 4
  • Contractor — Ch. 31 4
  • Contractor B — Ch. 34
  • Contractor loses money on — Ch. 4
  • Contractor makes money by — Ch. 4
  • Contractor owns the float — Ch. 14
  • Contractor soft cost — Ch. 36
  • Contractor total — Ch. 36
  • Contractor-Controlled Insurance Program — Ch. 5
  • Contractor-engaged laboratory. — Ch. 23
  • contractor-owned float — Ch. 14
  • contractors fail while growing. — Ch. 2
  • Contractors pollution liability — Ch. 5
  • contractual — Ch. 36 7
  • Contractual allocation — Ch. 33
  • contractual representation — Ch. 7
  • Contributory — Ch. 24
  • Control — Ch. 39
  • control (contraction) joint — Ch. 8
  • control budget — Ch. 13 16
  • control of the critical path. — Ch. 13
  • Controlled access zones and overhead protection — Ch. 9
  • controlling — Ch. 24 3
  • Controlling — Ch. 29
  • controlling activity — Ch. 18
  • Controlling employer — Ch. 24
  • controlling employer — Ch. 5
  • controlling item — Ch. 38
  • controlling path — Ch. 29
  • Controls surfacing at commissioning — Ch. 10
  • converge or cross — Ch. 38
  • converges — Ch. 24
  • Conversation 1. — Ch. 41
  • Conversation 2. — Ch. 41
  • Conversation 3. — Ch. 41
  • Convert it. — Ch. 31
  • Convert pending changes fast — Ch. 32
  • Convert what you can into logic. — Ch. 14
  • Conveyor — Ch. 21
  • Coordinate the model. Verify the building. — Ch. 35
  • Coordination — Ch. 35
  • coordination — Ch. 9
  • Coordination conflict — Ch. 25
  • Coordination drawings / clash detection — Ch. 37
  • coordination requirement — Ch. 10
  • Coordination requirements — Ch. 17
  • coordination with the work of other trades — Ch. 25
  • Coordination. — Ch. 8
  • Corbin Life Sciences Building — Ch. 40
  • Cordova trailer in, unload direct — Ch. 18
  • corporate safety manual — Ch. 24
  • correcting — Ch. 24 3
  • Correcting employer — Ch. 24
  • Corrective action — Ch. 23
  • Corrective and preventive action — Ch. 23
  • Corrective-action closure time — Ch. 24
  • Cost — Ch. 20
  • cost — Ch. 24
  • cost and earned value — Ch. 29
  • Cost and schedule impact, and who bears it — Ch. 23
  • Cost and time usually run on different clocks. — Ch. 31
  • Cost cap — Ch. 39
  • cost code — Ch. 28
  • cost code structure — Ch. 13
  • Cost control — Ch. 28
  • Cost control is not accounting. — Ch. 28
  • Cost control looks forward and must be timely. — Ch. 28
  • Cost control that tells you the truth monthly — Ch. 33
  • cost curve — Ch. 32
  • cost driver — Ch. 10
  • Cost impact. — Ch. 7
  • cost incurred — Ch. 30
  • Cost incurred to date — Ch. 34
  • Cost loading — Ch. 14
  • Cost of capital. — Ch. 2 21
  • cost of claims, not exposure to hazard. — Ch. 16
  • cost of making a change — Ch. 1 6
  • Cost of one replacement — Ch. 20
  • Cost of the work — Ch. 13 31 4
  • cost of the work — Ch. 30
  • Cost of work — Ch. 13
  • cost of work — Ch. 16
  • Cost per SF per use — Ch. 22
  • cost per unit — Ch. 38
  • Cost per win — Ch. 15
  • Cost slope — Ch. 29
  • cost slope — Ch. 29
  • Cost status against budget — Ch. 26
  • Cost to complete — Ch. 28 29
  • cost to complete — Ch. 30
  • Cost to complete is the only judgment — Ch. 32
  • Cost to complete. — Ch. 28
  • Cost to date — Ch. 28
  • Cost to date outrunning percent complete — Ch. 28
  • cost type — Ch. 28
  • cost-loaded CPM schedule — Ch. 30
  • cost-loaded schedule — Ch. 30
  • cost-plus or GMP — Ch. 21
  • Cost-plus, fixed fee — Ch. 4
  • Cost-to-cost — Ch. 28
  • cost-to-cost — Ch. 34
  • Cottonwood Creek Bridge Replacement — Ch. 14 2 8
  • Count it. — Ch. 18
  • count the thing. — Ch. 31
  • Count the wasted trips. — Ch. 37
  • Count them. — Ch. 14
  • coupled — Ch. 22
  • Coursing. — Ch. 8
  • cover — Ch. 23
  • Cover — Ch. 8
  • cover board — Ch. 9
  • Covered work may be ordered uncovered. — Ch. 23
  • CPC — Ch. 42
  • CPI — Ch. 30
  • CPM — Ch. 1 27 35
  • CPM network — Ch. 14
  • CPM schedule — Ch. 37
  • CR-03 — Ch. 11
  • Crane — Ch. 17 18
  • Crane and bucket — Ch. 21
  • Crane and hoisting approvals — Ch. 17
  • Crane and pump demand goes up by 40 percent. — Ch. 22
  • Crane and rigging — Ch. 38
  • Crane at Pad A — Ch. 18
  • Crane at Pad C — Ch. 18
  • crane is at Pad A — Ch. 18
  • Crane selection — Ch. 8
  • Crane-trap sequence conflict — Ch. 35
  • Crane/lift on the north side of the footprint — Ch. 17
  • Crashing — Ch. 29
  • Crashing, in five moves. — Ch. 29
  • Crawler crane — Ch. 21
  • Created by a person with direct knowledge — Ch. 26
  • Created by you — Ch. 26
  • Created every single day — Ch. 26
  • creating — Ch. 24 3
  • Creating employer — Ch. 24
  • Credentials, honestly. — Ch. 42
  • Credibility — Ch. 41
  • credibility-sequencing — Ch. 41
  • credit — Ch. 36
  • credit instrument — Ch. 5
  • Credit the people, publicly. — Ch. 39
  • credits — Ch. 31
  • Credits money moved to a vendor as progress. — Ch. 28
  • crew — Ch. 20
  • crew assignment — Ch. 19
  • crew continuity as a hard constraint — Ch. 37
  • Crew cost per hour — Ch. 12
  • crew count — Ch. 37
  • Crew flexibility. — Ch. 20
  • Crew of 10 per week — Ch. 20
  • Crew size and the optimum crew. — Ch. 20
  • critical — Ch. 10 29 33
  • critical lift — Ch. 21
  • critical lighting. — Ch. 9
  • Critical or non-critical — Ch. 33
  • critical path — Ch. 14 33
  • critical path method — Ch. 1
  • Critical Path Method (CPM) — Ch. 14
  • Critical-path work beats float work — Ch. 18
  • critically jurisdiction-dependent — Ch. 5
  • cross — Ch. 37
  • Cross braces are not a ladder. — Ch. 22
  • cross-laminated timber (CLT) — Ch. 8
  • Cross-reference — Ch. 26
  • Crossline trailer 1 in — Ch. 18
  • Crossline trailer 2 in — Ch. 18
  • CSI MasterFormat — Ch. 11 13 7
  • CSP — Ch. 42
  • Cultural and archaeological resources — Ch. 38
  • Cumulative — Ch. 26
  • cumulative — Ch. 34
  • Cumulative (CY) — Ch. 38
  • Cumulative cash — Ch. 42
  • Cumulative fatigue. — Ch. 24
  • Cumulative impact — Ch. 31
  • Cumulative impact change order request — Ch. 31
  • Curing — Ch. 8
  • currency — Ch. 7
  • current actual — Ch. 28
  • Current assets — Ch. 34
  • current assets — Ch. 34
  • Current budget — Ch. 28
  • Current forecast — Ch. 29
  • Current liabilities — Ch. 34
  • current liabilities — Ch. 34
  • CURRENT PAYMENT DUE — Ch. 32
  • Current payment due — Ch. 32
  • Current ratio — Ch. 16 34
  • curtain wall — Ch. 9
  • Curtain wall shop drawings — Ch. 25
  • Curtain-wall shop drawings — Ch. 25
  • curtain-wall shop-drawing delay — Ch. 9
  • Curtis Boone — Ch. 31
  • Custom — Ch. 37
  • Cutoff walls — Ch. 22
  • cutoff walls with an interior pump — Ch. 8
  • Cutting and coring — Ch. 16
  • CWT — Ch. 12
  • cycle — Ch. 22 8
  • Cycle — Ch. 8
  • Cycle per form set — Ch. 39
  • Cycle time — Ch. 21
  • cycle time — Ch. 37
  • Cycle time and cash are the same variable. — Ch. 37
  • Cycle time and rate. — Ch. 37
  • cycle time goes up — Ch. 37
  • Cycle-based production estimating — Ch. 38
  • cycles — Ch. 38
  • cynicism — Ch. 41
  • D is a gate, not a score — Ch. 39
  • D is a gate, not a score. — Ch. 39
  • D. Absorb it — Ch. 33
  • D. Alcaraz — Ch. 20
  • D. Decision linkage — Ch. 39
  • daily — Ch. 38
  • daily cleanup and the waste stream — Ch. 17
  • Daily close-out — Ch. 37
  • daily crane pick schedule — Ch. 18
  • daily exposure — Ch. 26
  • Daily foreman huddle — Ch. 26
  • daily inspection procedure — Ch. 22
  • Daily progress photography with a protocol. — Ch. 26
  • daily quantity report — Ch. 20
  • daily report in full — Ch. 26
  • Daily reports — Ch. 29
  • Daily reports and time entry from the field — Ch. 39
  • daily, before the end of each shift — Ch. 18
  • Damage — Ch. 23 40
  • Damage and cleanup — Ch. 41
  • Damage to completed work — Ch. 23
  • damage to existing facilities — Ch. 6
  • damage waiver — Ch. 21
  • damaged by somebody else — Ch. 23
  • Damages — Ch. 33
  • damages — Ch. 33
  • Damages. — Ch. 25
  • Dampproofing — Ch. 8
  • Dams, levees, flood control — Ch. 38
  • Danforth Elementary School — Ch. 21
  • DART rate — Ch. 24
  • data date — Ch. 29
  • date — Ch. 26 31
  • date it must be complete — Ch. 23
  • date it was performed — Ch. 33
  • date the obligation was owed — Ch. 33
  • date the physical thing has to be on the site — Ch. 25
  • date-stamps the schedule impact — Ch. 9
  • Dated event — Ch. 31
  • Dated photographs — Ch. 36
  • Davis-Bacon Act — Ch. 2 20 38 5
  • Day 104 — Ch. 29
  • Day 110 — Ch. 29
  • Day 130 — Ch. 29
  • Day 143 — Ch. 29
  • day 201 — Ch. 29
  • Day 5 (the required response date). — Ch. 25
  • day 53 — Ch. 37
  • Day 8. — Ch. 25
  • Day 9 and after. — Ch. 25
  • days claimed versus days granted — Ch. 31
  • days out — Ch. 25
  • Days removed from the cycle. — Ch. 37
  • Days to weeks — Ch. 36
  • DBB — Ch. 3
  • DBE / MBE / WBE goals — Ch. 5
  • DBE participation. — Ch. 38
  • DBIA — Ch. 42
  • DDC — Ch. 10
  • De minimis — Ch. 24
  • Dead shores — Ch. 22
  • death or serious physical harm — Ch. 24
  • Debrief. — Ch. 15
  • Debt to net worth — Ch. 34
  • Debt-to-equity — Ch. 16
  • Dec Y1 — Ch. 32
  • decays — Ch. 36
  • Deceleration distance — Ch. 24
  • December 11, Year 1 — Ch. 25
  • December 12 — Ch. 16
  • December 21, Year 1 — Ch. 25
  • December 31, Year 1 — Ch. 25
  • Decide in the model, in writing, with a date. — Ch. 10
  • Decision due — Ch. 37
  • decision log — Ch. 26
  • decision with a price — Ch. 36
  • decision-making — Ch. 31
  • decision-manufacturing device — Ch. 26
  • decisions — Ch. 26
  • decisions first — Ch. 26
  • Decisions get made in the room. — Ch. 41
  • Decisions required from the owner — Ch. 26
  • Decisions required today — Ch. 26
  • decisions, commitments, and facts. — Ch. 26
  • Deck — Ch. 38
  • Declare every deviation in a cover letter — Ch. 25
  • Decline — Ch. 15
  • declines — Ch. 13
  • Decode the scoring matrix, day one. — Ch. 15
  • decreasing constraint — Ch. 10
  • dedicated limits — Ch. 5
  • deductible — Ch. 5
  • Deep callback to Chapter 4. — Ch. 38
  • Deep callback. — Ch. 3
  • Deep subcontracting tiers — Ch. 37
  • Deep wells — Ch. 22
  • deep wells with submersible pumps — Ch. 8
  • default and termination — Ch. 6
  • Default to retained logic — Ch. 29
  • defect — Ch. 16
  • Defects and rework — Ch. 27
  • deferred seasonal test — Ch. 40
  • deferred seasonal test plan — Ch. 40
  • deferred submittal — Ch. 10 25
  • defined scope — Ch. 4
  • defined term — Ch. 33
  • defined terms — Ch. 24
  • deflect under its own weight — Ch. 22
  • Degraded housekeeping. — Ch. 24
  • Del Ferraro — Ch. 14 38
  • delay — Ch. 16 25
  • Delay — Ch. 6
  • Delay / time extension — Ch. 4
  • Delay is not proportional to lateness. — Ch. 29
  • Delays and impacts — Ch. 29
  • delegated design — Ch. 25 35
  • delegated design responsibility — Ch. 10
  • Delegation and hard conversations — Ch. 42
  • Delegation is the only way people learn to manage — Ch. 41
  • Delete — Ch. 31
  • Deliveries received — Ch. 26
  • delivery and installation — Ch. 40
  • Delivery and offload — Ch. 16
  • Delivery and receiving tickets — Ch. 26
  • Demand is durable. — Ch. 42
  • demand lumpiness. — Ch. 2
  • Demolition permit — Ch. 17
  • Demolition robot — Ch. 39
  • denied or unanswered — Ch. 33
  • denied, or unreasonably deferred — Ch. 29
  • density gauge behind the rollers in real time — Ch. 38
  • Depreciation. — Ch. 21
  • derived demand — Ch. 2
  • Description of the nonconformance — Ch. 23
  • design — Ch. 40
  • design and price together — Ch. 15
  • Design and supervision. — Ch. 22
  • Design completeness — Ch. 11
  • Design contingency — Ch. 11
  • Design contingency is not carried. — Ch. 11
  • Design error or omission — Ch. 31 6
  • Design errors and omissions — Ch. 33
  • Design firm / CM agency / consultancy — Ch. 42
  • Design freeze far earlier than normal — Ch. 39
  • Design information — Ch. 27
  • design intent and documentation — Ch. 36
  • Design model — Ch. 35
  • design phase — Ch. 35
  • design problem to solve now — Ch. 11
  • design problem with constraints — Ch. 17
  • Design professional, in writing — Ch. 23
  • Design team field observation — Ch. 23
  • design to the estimate — Ch. 11
  • Design-assist engagement for facades and MEP. — Ch. 25
  • design-bid-build — Ch. 11 3 5
  • Design-Bid-Build — Ch. 3
  • Design-bid-build — Ch. 3
  • Design-bid-build (DBB) — Ch. 3
  • Design-bid-build, lump sum. 425 calendar days. — Ch. 3
  • Design-build — Ch. 15 3
  • Design-Build — Ch. 3
  • design-build — Ch. 3 5 7
  • Design-build (DB) — Ch. 3
  • design-build-operate-maintain (DBOM) — Ch. 3
  • Design-build. — Ch. 15
  • Design-builder — Ch. 3
  • design-builder — Ch. 3
  • Design-mix formulas — Ch. 25
  • design-team review time — Ch. 17
  • designed — Ch. 22
  • designed by a qualified person — Ch. 22
  • designed, shop-drawn, submitted system — Ch. 9
  • designers — Ch. 24
  • Destination — Ch. 18
  • Destination. — Ch. 18
  • detail — Ch. 14
  • Detail — Ch. 7
  • Details, thresholds, and timelines vary by state. — Ch. 17
  • Detection — Ch. 23
  • determination against criteria — Ch. 40
  • developer — Ch. 2
  • Development length — Ch. 8
  • deviations — Ch. 25
  • device-by-device functional test — Ch. 10
  • Dewatering — Ch. 38
  • dewatering runs 24 hours a day — Ch. 8
  • Dewatering shut-off — Ch. 22
  • Dewatering. — Ch. 15
  • diagnostic instrument — Ch. 41
  • Diagram (described). — Ch. 1 10 11 12 13 14 15 17 27 3 30 33 34 4 6 9
  • did — Ch. 7
  • did not remove too early. — Ch. 22
  • Difference — Ch. 29 32 37 38
  • Difference in processing alone — Ch. 23
  • different business — Ch. 37
  • Different incentives — Ch. 41
  • different measurements. — Ch. 36
  • different notice and claim deadlines. — Ch. 2
  • Differing / concealed site conditions — Ch. 6
  • Differing site condition — Ch. 31
  • differing site condition — Ch. 8
  • differing site conditions — Ch. 38 4 5
  • Differing site conditions — Ch. 38 4 6
  • Differing site conditions (DSC) — Ch. 33
  • Differing site conditions clause — Ch. 38
  • differing site conditions clause — Ch. 4
  • Differing site conditions. — Ch. 38
  • diffusion of responsibility — Ch. 26
  • digital twin — Ch. 35
  • Dilution of supervision — Ch. 19 31
  • Dimension lumber — Ch. 8
  • Dimensional accuracy at the interfaces — Ch. 39
  • dimensions — Ch. 25
  • Direct chute from the truck — Ch. 21
  • Direct cost — Ch. 13 22
  • direct cost — Ch. 31
  • Direct cost carried — Ch. 18
  • Direct cost claimed — Ch. 38
  • Direct cost of a two-week enclosure slip — Ch. 9
  • Direct cost of six hours — Ch. 21
  • Direct cost of the work — Ch. 4
  • DIRECT COST OF WORK — Ch. 11
  • Direct costs — Ch. 12
  • Direct hard cost — Ch. 36
  • Direct hire. — Ch. 20
  • direct schedule obligation to Kestrel — Ch. 40
  • Direct subtotal — Ch. 35 36 41
  • Direct work — Ch. 20
  • direct-fired — Ch. 22
  • Direct-to-install beats laydown. — Ch. 18
  • Directed acceleration — Ch. 29
  • Directed work — Ch. 31
  • Directing work verbally to avoid a paper trail. — Ch. 31
  • Direction requested. — Ch. 26
  • Direction that adds scope — Ch. 25
  • directional — Ch. 23
  • directive — Ch. 7
  • Directives received, including verbal ones — Ch. 26
  • Disadvantaged Business Enterprise — Ch. 38
  • Disallowed — Ch. 32
  • disclaimer — Ch. 38
  • Discovery scope — Ch. 33
  • discrete — Ch. 29
  • Dismantling. — Ch. 21
  • Displaced Burden — Ch. 39
  • disposition — Ch. 23
  • Dispute — Ch. 33
  • Dispute resolution — Ch. 16 4
  • Dispute Review Board — Ch. 5
  • dispute review board (DRB) — Ch. 33
  • Disruption — Ch. 33
  • Disruption makes the work less efficient — Ch. 33
  • Distribute daily, by subcontractor. — Ch. 40
  • Distributed by trade — Ch. 27
  • distributed, undocumented knowledge — Ch. 41
  • distribution — Ch. 10 38
  • distribution. — Ch. 35
  • division — Ch. 28
  • Division 01 — Ch. 15
  • division and section title — Ch. 23
  • Do not — Ch. 23
  • do not — Ch. 25
  • Do not adjudicate it in the field. — Ch. 19
  • Do not build a bulletin. — Ch. 7
  • Do not build new structure. — Ch. 36
  • Do not cost-load every activity. — Ch. 30
  • Do not let it get deleted quietly. — Ch. 4
  • Do not lose it. — Ch. 40
  • Do not make a commitment you do not control. — Ch. 41
  • do not memorize point values, look them up — Ch. 36
  • Do not memorize section numbers. — Ch. 7
  • Do not pretend to precision. — Ch. 11
  • Do not quote a single ratio as fact. — Ch. 24
  • Do not stack acceleration on acceleration. — Ch. 41
  • Do not use the number from your last job — Ch. 22
  • Do not use them as prices or promises. — Ch. 11
  • Do not use. — Ch. 22
  • Do not write legal conclusions. — Ch. 25
  • Do not write speculation or blame. — Ch. 25
  • Do that section before you read its answers — Ch. 42
  • Do the arithmetic before you decide — Ch. 33
  • document — Ch. 26
  • Document — Ch. 38
  • Document A says — Ch. 7
  • Document availability — Ch. 15
  • Document B says — Ch. 7
  • Document causation in real time. — Ch. 19
  • Document control — Ch. 25
  • Document management. — Ch. 17
  • Document review — Ch. 24
  • Document review and comparison — Ch. 39
  • document type — Ch. 26
  • document why — Ch. 14
  • Document-control procedure — Ch. 17
  • document-control setup — Ch. 7
  • documentation — Ch. 7
  • Documentation and records — Ch. 23
  • Documentation discipline — Ch. 39
  • documentation is the memory of the project — Ch. 26 7
  • Documentation is the memory of the project — Ch. 40
  • Documentation of the actual condition — Ch. 38
  • documentation or procurement — Ch. 36
  • documentation outcome. — Ch. 33
  • Documented failure to cure — Ch. 19
  • Documents and the job trailer — Ch. 40
  • Documents. — Ch. 11
  • does — Ch. 3 5
  • does not — Ch. 5
  • does not comply — Ch. 36
  • does not contain a dollar sign. — Ch. 29
  • Does not prove causation. — Ch. 33
  • does not solve the problem — Ch. 10
  • does the unit price include overhead and profit — Ch. 4
  • dollar consequence — Ch. 7
  • dollar exposure — Ch. 4
  • dollar for dollar — Ch. 28
  • Dollars, not days. — Ch. 30
  • Domestic water. — Ch. 10
  • door closers — Ch. 7
  • door leaves — Ch. 7
  • Doors, frames, hardware — Ch. 9
  • Double handling — Ch. 18
  • Double-bought. — Ch. 16
  • down — Ch. 11
  • downside is capped by nothing. — Ch. 15
  • downward from the anchorage point — Ch. 24
  • downward slope — Ch. 34
  • drainage — Ch. 9
  • Drains and overflows. — Ch. 9
  • drawing field — Ch. 7
  • Drawings — Ch. 4 7
  • draws — Ch. 37
  • DRB / standing neutral — Ch. 33
  • dried-in — Ch. 8
  • Dried-in is a certification, not a date. — Ch. 9
  • Dried-in is not additive. It is a gate. — Ch. 9
  • Drilled shafts — Ch. 38
  • Drilled shafts (caissons) — Ch. 8
  • drinking water — Ch. 18
  • Driven piles — Ch. 38 8
  • Drone earthwork volume — Ch. 39
  • Drone photogrammetric surface — Ch. 39
  • Drone progress and inspection — Ch. 39
  • Dry-in flashing — Ch. 37
  • dry-pipe system — Ch. 10
  • Drywall finishing and painting robots — Ch. 39
  • Drywall hang, tape, finish — Ch. 9
  • DSC — Ch. 38
  • DSC settlement — Ch. 38
  • Duct — Ch. 35
  • Duct and pipe insulation and sealing — Ch. 36
  • duct leakage test — Ch. 10 37
  • due Friday 11/21. — Ch. 26
  • Dumpsters — Ch. 17
  • Duration — Ch. 21
  • Duration and logic at the activity level — Ch. 27
  • during and after — Ch. 23 24
  • during design — Ch. 11
  • Dust and dirt. — Ch. 18
  • Dust control — Ch. 37
  • Dust, noise, and vibration monitoring. — Ch. 17
  • Dust, noise, work hours — Ch. 5
  • duties — Ch. 42
  • dynamic water penetration — Ch. 9
  • E 32 — Ch. 14
  • E-4 — Ch. 7
  • E-Verify — Ch. 5
  • each one — Ch. 41
  • Each one as its final inspection passes — Ch. 40
  • earlier — Ch. 14
  • Earlier warning. — Ch. 32
  • earliest — Ch. 3
  • early — Ch. 23
  • early release provision — Ch. 32
  • Early, documented utility coordination — Ch. 38
  • early, with options. — Ch. 42
  • early-completion schedule — Ch. 4
  • early-warning thresholds — Ch. 19
  • Earned man-hours — Ch. 20
  • earned schedule — Ch. 30
  • Earned schedule (ES) — Ch. 30
  • Earned value (EV) — Ch. 30
  • Earned value is measured at budget rates. — Ch. 30
  • Earthwork moisture — Ch. 38
  • Earthwork volume by photogrammetric survey — Ch. 39
  • economics of the callback. — Ch. 37
  • Eductor (ejector) systems — Ch. 22
  • effective rate — Ch. 20
  • Effective rate — Ch. 5
  • effective stress — Ch. 22
  • Efficiency factor — Ch. 21
  • efficiency loss — Ch. 20
  • egress — Ch. 8
  • Eichleay — Ch. 33
  • EIFS — Ch. 9
  • eight calendar days — Ch. 29
  • Eight calendar days of enclosure float — Ch. 35
  • eight to fourteen months — Ch. 9
  • EJCDC — Ch. 4
  • elapsed time — Ch. 23
  • elapsed-time (zero-based) convention — Ch. 14
  • Electric equipment — Ch. 21
  • electrical — Ch. 10
  • Electrical — Ch. 35
  • electrical buyout date — Ch. 17
  • Electrical clearance. — Ch. 22
  • electrical permit — Ch. 17
  • electrical rough-in — Ch. 24
  • Electrical service grows. — Ch. 36
  • Electrical. — Ch. 36
  • Electrocution — Ch. 24
  • Element A — Ch. 12
  • Element B — Ch. 12
  • elemental/UniFormat — Ch. 11
  • Elevated slab on metal deck — Ch. 12
  • Elevation — Ch. 7
  • elevation 1,243 — Ch. 38
  • elevator machine-room or hoistway equipment — Ch. 11
  • Elevator permits and inspections — Ch. 17
  • eleven — Ch. 40
  • eleven days — Ch. 10 26 29 41
  • eleven days instead of the planned five — Ch. 25
  • eleven feet six inches. — Ch. 35
  • eleven houses in process — Ch. 37
  • eleven houses in process at all times — Ch. 37
  • eleven logged decisions in forty minutes — Ch. 26
  • Eleven miles. — Ch. 36
  • eleven months — Ch. 38
  • Eliminate the height. — Ch. 24
  • Elimination — Ch. 24
  • elimination — Ch. 24
  • elimination or substitution — Ch. 24
  • Email — Ch. 26
  • Embodied carbon — Ch. 36
  • emergency — Ch. 10
  • emergency action plan — Ch. 17
  • Emergency action plan — Ch. 24
  • Emergency power system testing — Ch. 40
  • Emergency response degradation. — Ch. 24
  • Emissions tiers. — Ch. 21
  • Emotionally invested — Ch. 37
  • Emphasis Program — Ch. 24
  • employee — Ch. 20 5
  • Employee interviews — Ch. 24
  • employer — Ch. 5
  • empty — Ch. 21
  • EMR. — Ch. 24
  • EMV is a portfolio number, not a project number. — Ch. 6
  • enabling costs — Ch. 29
  • enclosure date — Ch. 18
  • end dams — Ch. 9
  • Endangered species — Ch. 5
  • endorsement attached to the policy. — Ch. 5
  • endorsement to the policy — Ch. 5
  • endorsements — Ch. 5
  • Energized work and arc flash. — Ch. 10 24
  • Energy and Atmosphere — Ch. 36
  • Energy and renewables — Ch. 38
  • Energy code — Ch. 36
  • Energy code compliance is not a premium. — Ch. 36
  • energy model — Ch. 36
  • ENERGY STAR — Ch. 36
  • enforceability is highly jurisdiction-dependent — Ch. 33
  • engaged and paid by the contractor — Ch. 7
  • Engineered lumber — Ch. 8
  • Engineered lumber (LVL, PSL, glulam) — Ch. 37
  • engineered suspended-scaffold design — Ch. 24
  • engineered-to-order — Ch. 16
  • Engineering — Ch. 24
  • Engineering News-Record (ENR) — Ch. 11
  • engineering survey by a competent person — Ch. 22
  • Enhanced commissioning — Ch. 40
  • Enhanced flush-out or contaminant testing — Ch. 36
  • Enormous. — Ch. 20
  • entire — Ch. 23
  • entirely within your control. — Ch. 18
  • Entitlement — Ch. 33
  • entitlement gate — Ch. 33
  • Entitlement. — Ch. 25 33
  • Envelope consultant — Ch. 23
  • Environment and administration — Ch. 22
  • Environmental and historic review — Ch. 17
  • Environmental monitoring — Ch. 39
  • environmental product declaration — Ch. 36
  • Environmental Product Declaration (EPD) — Ch. 36
  • Envision — Ch. 36
  • EPD for the specific mix from the specific plant. — Ch. 36
  • EPDM — Ch. 9
  • equipment — Ch. 10
  • Equipment — Ch. 27 31
  • equipment and its production rate — Ch. 38
  • Equipment and tools off site — Ch. 40
  • Equipment available — Ch. 27
  • Equipment by unit number — Ch. 26
  • Equipment is time-based. — Ch. 12
  • Equipment list and asset data — Ch. 40
  • equipment operating near energized lines — Ch. 24
  • Equipment records — Ch. 26
  • Equipment telematics — Ch. 39
  • Equipment. — Ch. 26
  • Erected tonnage — Ch. 12
  • Erection is fast and crane-dependent — Ch. 36
  • erection sequence drawing — Ch. 22
  • Erection. — Ch. 21
  • Erosion and sedimentation control — Ch. 36
  • Erosion of the last hour. — Ch. 24
  • Error and rework rise — Ch. 20
  • errors or omissions — Ch. 25
  • errors partially cancel — Ch. 11
  • escalate — Ch. 27
  • Escalate only un-bought scope. — Ch. 11
  • Escalate RFI 221 by phone, — Ch. 27
  • Escalate to the midpoint — Ch. 11
  • Escalate today if two or more are true — Ch. 41
  • Escalated — Ch. 27 35
  • Escalation — Ch. 11 13 18 33 6
  • escalation — Ch. 12 2
  • Escalation allowance — Ch. 13 6
  • escalation allowance — Ch. 6
  • Escalation forgotten — Ch. 12
  • Escalation is a named line, not a gamble. — Ch. 3
  • Escalation to midpoint of construction — Ch. 11
  • Escalation. — Ch. 11 25
  • Escrowed retention — Ch. 32
  • essential electrical system — Ch. 10
  • Estimate reconciliation — Ch. 11
  • Estimate the trade yourself, in detail — Ch. 13
  • Estimate to complete (ETC) — Ch. 30
  • Estimate. — Ch. 35
  • Estimated cost total — Ch. 4
  • Estimated gross profit — Ch. 34
  • estimated gross profit — Ch. 34
  • estimated gross profit percentage — Ch. 34
  • Estimated scrap value to the thief — Ch. 18
  • Estimated total (no cap) — Ch. 4
  • Estimating — Ch. 42
  • Estimating contingency — Ch. 6
  • estimating contingency — Ch. 6
  • Estimating judgment — Ch. 39
  • estimating miss — Ch. 40
  • Estimating support and historical cost analysis — Ch. 39
  • ETC — Ch. 30
  • EV charging. — Ch. 36
  • Evaluation — Ch. 15
  • Even flow is the central discipline. — Ch. 37
  • event — Ch. 6
  • Event and date. — Ch. 31
  • Events, in the order they happened. — Ch. 26
  • every — Ch. 15 23 24 27
  • Every — Ch. 17 23
  • Every accrual reverses automatically — Ch. 28
  • Every action item has a name and a date — Ch. 41
  • Every addendum — Ch. 15
  • every constraint on it has been removed — Ch. 29
  • Every curb, sleeve, and penetration DONE. Once. — Ch. 27
  • every eight and a half days — Ch. 37
  • every finding gets a name and a date — Ch. 40
  • Every layer has a different base. — Ch. 13
  • Every miss gets a reason — Ch. 27
  • every number needs a unit and a measure. — Ch. 8
  • Every one of those is real work with real cost. — Ch. 38
  • Every package has a named human being. — Ch. 16
  • Every project is a prototype. — Ch. 27
  • Every reason gets a category — Ch. 27
  • Every scaffold on the job has an owner — Ch. 22
  • every scope gap between trade contracts. — Ch. 3
  • every single week — Ch. 38
  • every tier — Ch. 40
  • Every trade models its own work. — Ch. 10
  • Every unresolved item comes due at once — Ch. 32
  • Every weight ticket — Ch. 36
  • every year, forever — Ch. 37
  • Everybody could have predicted the sign. — Ch. 29
  • Everybody, already. — Ch. 39
  • Everything else — Ch. 2 36
  • evidence of insurance — Ch. 16
  • exactly — Ch. 26 32
  • exactly 37 cubic yards — Ch. 12
  • Exactly one current set — Ch. 25
  • exactly the same profit. — Ch. 34
  • Exactly what happens. — Ch. 41
  • exam-room pod — Ch. 27
  • excavation — Ch. 24
  • Excavation and trench collapse — Ch. 38
  • excavation and trenching — Ch. 10
  • excavation support is usually a delegated design. — Ch. 8
  • Excavation support removal — Ch. 22
  • Excavation with slopes and shoring — Ch. 35
  • excavator — Ch. 38
  • exceptions only — Ch. 26
  • exclude — Ch. 22
  • excludes — Ch. 23
  • Exclusion documentation — Ch. 36
  • Exclusions — Ch. 15
  • Exclusions. — Ch. 11
  • exclusive remedy — Ch. 4 5
  • Excusable — Ch. 29
  • Excusable and compensable — Ch. 29 33
  • excusable and compensable — Ch. 31 33
  • Excusable and compensable. — Ch. 29
  • excusable but non-compensable — Ch. 18
  • excusable but not established — Ch. 31
  • excusable delay — Ch. 29 6
  • Excusable delay — Ch. 33
  • Excusable or non-excusable — Ch. 33
  • Excusable, non-compensable — Ch. 29
  • Excusable, non-compensable. — Ch. 29
  • Executed wk 32 — Ch. 31
  • Executive escalation — Ch. 5
  • Executive negotiation — Ch. 33
  • Exhibit A to an executed contract — Ch. 16
  • Existing utilities. — Ch. 15
  • Existing utility records are frequently wrong — Ch. 38
  • Exoskeleton — Ch. 39
  • expected — Ch. 14
  • expected losses — Ch. 24
  • Expected monetary value (EMV) — Ch. 6
  • experience modification factor — Ch. 20
  • experience modification rate (EMR) — Ch. 12 16 2 24 42
  • explain what they cannot tell you. — Ch. 24
  • explicit and public — Ch. 41
  • Explicit cold-weather language — Ch. 13
  • explicitly who pays and who benefits. — Ch. 39
  • Exploit — Ch. 6
  • exposing — Ch. 24 3
  • Exposing employer — Ch. 24
  • express — Ch. 37
  • Extend hoist hours. — Ch. 18
  • extended field overhead — Ch. 33
  • extended general conditions — Ch. 33
  • extended general-conditions daily rate — Ch. 4
  • extending — Ch. 20
  • exterior finish — Ch. 37
  • External failure — Ch. 23
  • extra work — Ch. 38
  • F (36) — Ch. 14
  • F (6) — Ch. 14
  • F (EF 69), I (EF 73) — Ch. 14
  • F has free float of 4. — Ch. 14
  • F is enormous. — Ch. 14
  • F-4 formwork. — Ch. 12
  • fabrication — Ch. 39
  • fabrication duration — Ch. 17
  • Fabrication is digital and precise — Ch. 36
  • Fabrication model — Ch. 35
  • fabrication processes — Ch. 25
  • fabrication-level — Ch. 39
  • fabrication-release milestone tied to sign-off — Ch. 10
  • face-sealed — Ch. 9
  • Facilities and services subtotal — Ch. 13
  • Fact — Ch. 28
  • Fact. — Ch. 26
  • Factories need continuous volume — Ch. 39
  • Factory conditions. — Ch. 39
  • facts, decisions, and commitments — Ch. 26
  • Factual description — Ch. 31
  • Fade — Ch. 34
  • Fade is a measure of self-knowledge. — Ch. 34
  • fade is not the same as a loss. — Ch. 34
  • failed enclosure water test requiring rework — Ch. 9
  • failed later — Ch. 23
  • fails badly with an immature team — Ch. 3
  • Fails to grasp trade leverage the other way. — Ch. 37
  • Fails to grasp trade leverage. — Ch. 37
  • failure — Ch. 21
  • Failure to abate — Ch. 24
  • Failure to mitigate — Ch. 33
  • Failures live at transitions, — Ch. 9
  • Fair Oaks Water Plant Expansion — Ch. 22
  • Fall and falling-object protection — Ch. 22
  • Fall detection — Ch. 39
  • Fall protection. — Ch. 22
  • Fall-protection anchorage design — Ch. 25
  • Falls — Ch. 24
  • Falls. — Ch. 36
  • false positive — Ch. 35
  • Fan coil units — Ch. 10
  • fast cost feedback during design — Ch. 35
  • fast to climb it — Ch. 41
  • Fastest — Ch. 22
  • Fatality or catastrophe — Ch. 24
  • feasible means of abatement — Ch. 24
  • Feb 16, Year 2 — Ch. 10
  • February 10, Year 2 — Ch. 16 25
  • February 16, Year 2 — Ch. 10
  • February 20, Year 1 — Ch. 25
  • February 22, Year 2 — Ch. 16
  • February 24, Year 2 — Ch. 25
  • Federal work. — Ch. 30
  • Fee — Ch. 13
  • fee and contingency are percentages — Ch. 12
  • fee is not auditable — Ch. 13
  • Fee net of overhead — Ch. 2
  • Fee with incentive — Ch. 4
  • feedback interval. — Ch. 42
  • Feeders — Ch. 10
  • Fencing with privacy screen — Ch. 18
  • Fenestration performance — Ch. 36
  • fewer — Ch. 24
  • Fewer claims. — Ch. 32
  • fewer coverage disputes — Ch. 5
  • FIDIC — Ch. 4
  • field adhesion testing — Ch. 9
  • Field air/water test with chamber — Ch. 9
  • Field engineer — Ch. 1
  • Field engineer / project engineer (PE) — Ch. 42
  • field ladder — Ch. 42
  • Field management platforms — Ch. 39
  • Field modification without engineering review — Ch. 22
  • Field operations executive — Ch. 42
  • Field order / minor change in the work — Ch. 31
  • Field Quality Control — Ch. 7
  • field quality control — Ch. 7
  • Field resolution — Ch. 5
  • Field time cards — Ch. 28
  • Field water test (spray rack / calibrated nozzle) — Ch. 9
  • field-cured — Ch. 22 23
  • field-cured cylinders — Ch. 22 23
  • Field-level — Ch. 33
  • Fieldwire — Ch. 39
  • fifteen to twenty times — Ch. 34
  • Figured dimensions govern over scaled dimensions. — Ch. 7
  • File this as document 3 in your project notebook. — Ch. 3
  • Fill factor — Ch. 21
  • Filtration. — Ch. 10
  • Final — Ch. 32 5
  • final certificate of occupancy — Ch. 40
  • Final cleaning — Ch. 40
  • Final completion — Ch. 4 40
  • FINAL COMPLETION — Ch. 40
  • final completion and final payment — Ch. 40
  • final completion November 17. — Ch. 40
  • Final paint — Ch. 9
  • final paint — Ch. 9
  • Final paint. — Ch. 9
  • Final payment — Ch. 40
  • Final review meeting — Ch. 13
  • Final unconditional lien waivers — Ch. 40
  • Finality — Ch. 33
  • Finance costs and interest — Ch. 33
  • Finance the principal — Ch. 5
  • Financial disclosure in prequalification. — Ch. 34
  • Financial health — Ch. 13
  • Financing activities — Ch. 34
  • Financing and appraisal. — Ch. 37
  • Financing and lending follow site progress — Ch. 39
  • Find it in warranty — Ch. 23
  • Find out immediately — Ch. 40
  • find yours. — Ch. 26
  • finding savings. — Ch. 13
  • Finding the longest path. — Ch. 27
  • finish — Ch. 27
  • Finish and color are a mockup issue. — Ch. 9
  • Finish is structure — Ch. 36
  • Finish No Earlier Than (FNET) — Ch. 14
  • Finish No Later Than (FNLT) — Ch. 14
  • Finish-to-Finish — Ch. 14
  • Finish-to-Start — Ch. 14
  • Finishing — Ch. 37
  • Fire alarm — Ch. 10
  • Fire alarm final acceptance test — Ch. 40
  • Fire and code. — Ch. 8
  • fire lane only — Ch. 18
  • Fire lanes — Ch. 17
  • fire marshal — Ch. 10
  • Fire marshal — Ch. 23
  • Fire marshal life-safety final walk — Ch. 40
  • Fire marshal review — Ch. 17
  • Fire performance is engineered, not intuitive — Ch. 36
  • fire protection — Ch. 10
  • Fire pumps — Ch. 10
  • fire-rated assembly — Ch. 9
  • Fireproofing — Ch. 8
  • firestop management plan — Ch. 9
  • Firestopping — Ch. 13
  • firestopping inspection failure at a hold point — Ch. 9
  • Firestopping of penetrations — Ch. 16
  • First — Ch. 37 41
  • first — Ch. 7
  • First call on manpower. — Ch. 32
  • First placement. — Ch. 25
  • first real installation in the actual building — Ch. 23
  • first wind-driven rain — Ch. 9
  • First, calibrate what you came in believing. — Ch. 36
  • First, cash flow. — Ch. 17
  • First, incentive. — Ch. 33
  • First, it is the one risk you cannot transfer. — Ch. 6
  • First, presence. — Ch. 24
  • First, price doing nothing — Ch. 24
  • First, the drawings lie by omission. — Ch. 9
  • First, the labor column is the money column. — Ch. 22
  • First, the owner is usually a public agency. — Ch. 38
  • First, the premium, computed correctly. — Ch. 20
  • First, the trap. — Ch. 1
  • First, there is no overtime premium in it at all. — Ch. 20
  • First, verify the sub is right — Ch. 31
  • First, wet-film thickness — Ch. 9
  • five days — Ch. 37
  • five days ahead of the computed latest date — Ch. 25
  • five days of float on a thirty-eight-week chain. — Ch. 9
  • Five gate questions. — Ch. 39
  • five houses — Ch. 37
  • Five things to carry out of this chapter. — Ch. 30
  • Five ways work gets bought. — Ch. 15
  • five weeks — Ch. 10 26
  • five weeks later — Ch. 39
  • five whys — Ch. 24
  • five-plus years. — Ch. 9
  • five-week lead time — Ch. 7
  • Five. — Ch. 32
  • Fix it now — Ch. 23
  • Fixed — Ch. 38
  • fixed cost — Ch. 38
  • fixed cure duration — Ch. 39
  • Fixed fee — Ch. 4
  • Fixed formula 0/100 — Ch. 30
  • Fixed formula 25/75 — Ch. 30
  • Fixed formula 50/50 — Ch. 30
  • Fixed subtotal — Ch. 21
  • fixed-cost recovery — Ch. 38
  • flag any whose award-by date has already passed — Ch. 25
  • flat dollars per person — Ch. 20
  • flatness and levelness (F-numbers). — Ch. 8
  • Flexibility it gives the designer — Ch. 36
  • float — Ch. 33
  • Float being consumed silently. — Ch. 29
  • Float belongs to the network — Ch. 27
  • Float belongs to the project — Ch. 14
  • Float erosion. — Ch. 30
  • float is finite and somebody just spent it. — Ch. 29
  • Float is not the same thing as delay. — Ch. 33
  • Float preserved — Ch. 39
  • Float trend by path, six updates deep. — Ch. 29
  • Float, logic, and the critical path. — Ch. 30
  • floats — Ch. 22
  • Floor and roof openings. — Ch. 24
  • floor benchmark — Ch. 18
  • floor loading — Ch. 21
  • Floor trusses / engineered I-joists — Ch. 37
  • Flooring — Ch. 9
  • flow — Ch. 27
  • Flow-down — Ch. 19 4
  • Flow-down (incorporation by reference) — Ch. 16
  • Flush-out — Ch. 36
  • Flush-out versus air testing. — Ch. 36
  • Flying / table forms — Ch. 22
  • flying shores — Ch. 22
  • Focus Four — Ch. 18 2 22 24 8
  • Folder structure — Ch. 26
  • Follow-up — Ch. 24
  • following trade — Ch. 8
  • following trade waiting on it. — Ch. 8
  • Footing inspection before pour — Ch. 37
  • Footings and pile caps — Ch. 38
  • for information only — Ch. 38
  • for one worker, for one week. — Ch. 20
  • for the same scope — Ch. 13
  • Force account — Ch. 38
  • force account — Ch. 38
  • Force account records — Ch. 26
  • Force account tickets signed daily — Ch. 38
  • Force majeure — Ch. 6
  • Force majeure / excusable delay — Ch. 6
  • Force majeure in supply contracts. — Ch. 16
  • Forces the date regardless of logic — Ch. 14
  • forecast — Ch. 11
  • Forecast at completion — Ch. 28
  • Forecast at completion. — Ch. 28
  • Forecast completion versus contract. — Ch. 29
  • Forecast cost of the work remaining — Ch. 28
  • Forecast equals budget on most lines — Ch. 28
  • Forecasting — Ch. 42
  • Foreman — Ch. 20 42
  • foreman — Ch. 26
  • Foreman check-in at day 1, day 3, and day 10. — Ch. 24
  • foreman quit — Ch. 1
  • foremen and detailers both present — Ch. 35
  • forensic and expert-witness work — Ch. 42
  • forensic schedule analysis — Ch. 29
  • Foreseeable rework and disruption — Ch. 29
  • Forklift (rough terrain or warehouse) — Ch. 21
  • Form and delivery — Ch. 33
  • form cycle — Ch. 9
  • Form I-9 — Ch. 5
  • Form rental / ownership time — Ch. 39
  • Formal document control — Ch. 37
  • Formal letter — Ch. 26
  • Format. — Ch. 10
  • Formula-based approaches exist. — Ch. 33
  • Formwork contact area — Ch. 35
  • forty to seventy-five days — Ch. 32
  • forty-one feet above — Ch. 38
  • forward pass — Ch. 14
  • Forward pass from the data date, day 150. — Ch. 29
  • found after turnover — Ch. 23
  • Found at ceiling close — Ch. 39
  • found before turnover — Ch. 23
  • Found by scan, before MEP — Ch. 39
  • Found in the field, after duct is hung — Ch. 39
  • Foundation and base — Ch. 22
  • Foundation drainage — Ch. 8
  • Foundation walls — Ch. 8
  • foundation-wall sleeves and core drilling — Ch. 16
  • Foundation. — Ch. 21 22
  • four — Ch. 14
  • four days — Ch. 37
  • four days, not six. — Ch. 14
  • Four failure modes. — Ch. 39
  • Four knockouts override the score entirely. — Ch. 15
  • Four months. — Ch. 35
  • Four problems. — Ch. 22
  • Four questions. — Ch. 36
  • Four remedies, four payers. — Ch. 40
  • Four sentences worth memorizing — Ch. 5
  • four times its minimum base width — Ch. 22
  • four weeks — Ch. 25
  • Four-way rough — Ch. 37
  • four-week rolling average — Ch. 19
  • Four. — Ch. 17 32 39
  • fourteen days — Ch. 10
  • fourteen feet eight inches — Ch. 35
  • fourteen months after finishing its work — Ch. 32
  • fourteen-day — Ch. 26
  • fourteen-point schedule assessment — Ch. 14
  • Fourth, consider an interim payment — Ch. 31
  • fraction — Ch. 36
  • fragmented — Ch. 2 42
  • fragmented, one-off, low-margin, outdoor — Ch. 39
  • fragnet — Ch. 14 29 31
  • Frame (fabricated frame) — Ch. 22
  • frame a diagnosis in the field. — Ch. 20
  • frames — Ch. 7
  • Frank Petrosyan — Ch. 1
  • Fraud. — Ch. 4
  • free — Ch. 14
  • Free fall distance — Ch. 24
  • free float — Ch. 14
  • Free float (FF) — Ch. 14
  • Free haul and overhaul. — Ch. 38
  • free haul distance — Ch. 38
  • freestanding hammerhead tower crane — Ch. 21
  • Freight is a line, not an assumption. — Ch. 12
  • Freight terms — Ch. 16
  • Frequently rejected — Ch. 33
  • Friday, April 3, Year 2. — Ch. 27
  • Friday, September 5 — Ch. 32
  • fringe benefit rate. — Ch. 20
  • From Chapter 21. — Ch. 38
  • From Chapter 37. — Ch. 38
  • from the data date — Ch. 29
  • from the fabrication model — Ch. 35
  • From the field. — Ch. 1 10 11 12 13 14 15 16 17 18 19 2 20 21 22 23 24 25 26 27 28 29 3 30 31 32 33 35 36 38 39 4 40 41 42 5 6 7 8 9
  • Front-loaded schedules of values. — Ch. 30
  • front-loaded. — Ch. 3
  • Front-loading — Ch. 13 32 4
  • front-loading — Ch. 17
  • front-loading the schedule of values — Ch. 4
  • front-loading the SOV directly inflates EV. — Ch. 30
  • Frost laws / seasonal load restrictions — Ch. 38
  • Fuel — Ch. 21
  • Fuel management — Ch. 18
  • full conformance — Ch. 23
  • full liquid head — Ch. 22
  • full liquid head as the absolute ceiling — Ch. 22
  • fully adhered 60-mil TPO — Ch. 9
  • FULLY BURDENED HOURLY COST — Ch. 12
  • FULLY BURDENED RATE — Ch. 20
  • function — Ch. 38
  • function analysis — Ch. 11
  • Functional concurrency — Ch. 33
  • Functional performance testing — Ch. 36 40
  • Functional performance testing (FPT) — Ch. 40
  • Furnish as corrected — Ch. 25
  • furnish/install seams live here — Ch. 7
  • FUTA has a low annual wage cap — Ch. 12
  • G-series rated-assembly schedule — Ch. 7
  • Gain — Ch. 34
  • Gain to the unbalanced bidder — Ch. 15
  • Ganged wall forms — Ch. 22
  • Gantt chart — Ch. 14
  • gap — Ch. 23
  • Gap. — Ch. 16
  • Garbage in is worse here than usual — Ch. 39
  • Garbage in, cinematic garbage out. — Ch. 35
  • gates — Ch. 9
  • gates the order quantity — Ch. 27
  • General and supplementary conditions — Ch. 15
  • general conditions — Ch. 1
  • General conditions — Ch. 12 13 4 7
  • general conditions (GC) — Ch. 9
  • general conditions are a rate, not a quantity. — Ch. 31
  • general contractor — Ch. 1
  • General Duty Clause — Ch. 24
  • General foreman — Ch. 20 42
  • general indemnity agreement — Ch. 15
  • General Indemnity Agreement — Ch. 5
  • General Indemnity Agreement (GIA) — Ch. 5
  • General requirements — Ch. 12
  • General Requirements — Ch. 7
  • General superintendent — Ch. 42
  • general supervisory authority — Ch. 24
  • Generate at least four options — Ch. 10
  • Genuine design comment — Ch. 25
  • genuine early costs belong in early line items. — Ch. 13
  • Genuine stability. — Ch. 29
  • genuine structural cost advantage — Ch. 2
  • geography — Ch. 15
  • Geotechnical and existing-conditions reports — Ch. 15
  • geotechnical baseline report (GBR) — Ch. 38
  • geotechnical report — Ch. 38 7 8
  • Get advice immediately — Ch. 33
  • get the terms in writing first — Ch. 40
  • Get the two parties in a room, with you in it. — Ch. 40
  • girder fabrication — Ch. 14
  • Girders — Ch. 38
  • Give credit publicly, absorb blame publicly. — Ch. 41
  • Give folder 13 its own life. — Ch. 26
  • Give notice of time impact separately — Ch. 31
  • give notice on time — Ch. 14
  • Give notice. — Ch. 41
  • Given — Ch. 31
  • given a win — Ch. 15
  • Glenn Ballard — Ch. 27
  • glue-laminated timber (glulam) — Ch. 8
  • GMP — Ch. 13 3 4
  • GMP / construction contingency — Ch. 4
  • GMP cost of work — Ch. 11
  • Go get the current figures yourself — Ch. 24
  • go to the toolbox talk and say nothing. — Ch. 24
  • Going out this week. — Ch. 25
  • good faith efforts — Ch. 38
  • Good forecasting culture. — Ch. 34
  • goods — Ch. 16
  • Grade — Ch. 8
  • grade beams — Ch. 8
  • Grading / land-disturbance permit — Ch. 17
  • Gravity drainage — Ch. 10
  • GREEN — Ch. 22
  • green building rating system — Ch. 36
  • Green Business Certification Inc. (GBCI) — Ch. 36
  • Green Globes — Ch. 36
  • Greg Howell — Ch. 27
  • grid — Ch. 7
  • grid-9 end wall — Ch. 25
  • Grid-interactive equipment. — Ch. 36
  • Gross buyout variance (favorable) — Ch. 16
  • Gross deleted direct cost — Ch. 31
  • Gross for the week — Ch. 20
  • Gross identified savings — Ch. 35
  • Gross margin — Ch. 37
  • Gross margin lost — Ch. 37
  • Gross profit — Ch. 34
  • Gross profit earned to date — Ch. 34
  • gross profit earned to date — Ch. 34
  • Gross profit earned to date. — Ch. 34
  • Gross scope surfaced — Ch. 16
  • Ground control. — Ch. 39
  • ground-bearing analysis — Ch. 21
  • Growing — Ch. 39
  • Growth consumes cash. — Ch. 2
  • Growth dilutes supervision. — Ch. 2
  • Growth is a use of cash, not a source of it. — Ch. 34
  • Growth outruns the systems. — Ch. 2
  • Grubbing — Ch. 8
  • GUARANTEED MAXIMUM PRICE — Ch. 1 12 13 3 32 4
  • Guaranteed maximum price — Ch. 1 4
  • Guaranteed Maximum Price — Ch. 11
  • guaranteed maximum price — Ch. 3
  • Guaranteed Maximum Price (GMP) — Ch. 1 11
  • guaranteed maximum price (GMP) — Ch. 16
  • gym roof structure and RTU setting only — Ch. 35
  • gymnasium — Ch. 40
  • gymnasium roof structure — Ch. 35
  • habit — Ch. 19
  • Halcyon — Ch. 19
  • Halcyon Electric — Ch. 19
  • Halcyon Electric bought out and licensed — Ch. 17
  • Halcyon Electric. — Ch. 19
  • Halcyon subcontract executed — Ch. 16
  • Halcyon truck in — Ch. 18
  • Handoff hazards. — Ch. 24
  • handoff inspection — Ch. 19
  • Handset panel forms — Ch. 22
  • Hangers and seismic bracing — Ch. 10
  • Hank Duffy — Ch. 8
  • Hank Duffy at Ironbridge Steel — Ch. 1
  • Harbor Ridge — Ch. 14 2 8 9
  • hard — Ch. 14
  • Hard (physical) logic — Ch. 14
  • hard 12 percent — Ch. 19
  • hard barriers with a sealed anteroom — Ch. 18
  • Hard cap at 5 weeks, not 7 — Ch. 24
  • Hard carry — Ch. 37
  • hard clash — Ch. 10
  • Hard clash — Ch. 35
  • hardware sets — Ch. 7
  • Harness stretch / D-ring shift — Ch. 24
  • have I read it — Ch. 7
  • have the utility de-energize or relocate the line — Ch. 24
  • hazard-generating decision — Ch. 41
  • Hazardous materials — Ch. 6
  • he is right. — Ch. 33
  • head flashing membrane — Ch. 9
  • Head-of-wall / top-of-wall joints — Ch. 16
  • Health department review — Ch. 17
  • Health Product Declaration (HPD) — Ch. 36
  • health-code requirements — Ch. 36
  • heat — Ch. 10
  • Heat builds up. — Ch. 36
  • Heat illness kills, and it kills early. — Ch. 20
  • Heat pumps replacing combustion. — Ch. 36
  • Heat-island mitigation. — Ch. 36
  • Heat-strain monitoring — Ch. 39
  • Heavily yours — Ch. 36
  • Heavy civil — Ch. 38
  • Heavy civil / Infrastructure — Ch. 2
  • heavy duty (75 psf) — Ch. 22
  • Height above grade and travel time. — Ch. 20
  • Height without a system — Ch. 37
  • height, capacity, and floor loading — Ch. 21
  • Height-to-base ratio. — Ch. 22
  • held — Ch. 23
  • Held, 3 days to spare — Ch. 29
  • Helical piles — Ch. 8
  • Helper / tender — Ch. 20
  • Her constraints shape what is achievable. — Ch. 31
  • Here is the Northgate build-up itself — Ch. 4
  • Hierarchy of controls — Ch. 24
  • High — Ch. 18 24 4 8
  • High during erection — Ch. 8
  • High, once enough quantity is installed — Ch. 28
  • High-risk activities requiring a written plan — Ch. 24
  • High-security sites — Ch. 18
  • High-visibility apparel — Ch. 21
  • High. — Ch. 36
  • Higher — Ch. 24
  • Highest — Ch. 22 28 3
  • highest — Ch. 3
  • highest suicide rates — Ch. 41
  • Highly jurisdiction- and contract-dependent. — Ch. 33
  • highly jurisdiction-dependent — Ch. 19
  • Highways and roadway — Ch. 38
  • his private buffer — Ch. 27
  • Historic preservation — Ch. 5
  • historical cost database — Ch. 34
  • hoarding to the last month — Ch. 6
  • Hoist — Ch. 18
  • hoist — Ch. 18
  • hoist plan — Ch. 18
  • Hoisting and material handling — Ch. 16
  • hoisting and material handling for each trade — Ch. 17
  • Hoists — Ch. 17
  • hold and escalate. — Ch. 31
  • hold point — Ch. 23
  • Hold point (H) — Ch. 23
  • hold points and handoffs. — Ch. 8
  • hold points, not labor — Ch. 22
  • Hold the building under pressure — Ch. 36
  • honest logic — Ch. 14
  • Honest total range — Ch. 41
  • Horizontal directional drilling (HDD) — Ch. 38
  • horizontally — Ch. 10
  • hospitals frequently have helipads — Ch. 39
  • Hot and cold weather. — Ch. 8
  • Hot-weather protection — Ch. 18
  • hour overage charge — Ch. 21
  • Hours alone cannot do it either. — Ch. 20
  • Hours worked. — Ch. 42
  • Housekeeping — Ch. 36
  • housekeeping and cleanup responsibility matrix — Ch. 18
  • housekeeping is a leading indicator of planning. — Ch. 18
  • Housekeeping, PPE, and site rules — Ch. 24
  • How allowances get abused. — Ch. 4
  • How big — Ch. 7
  • How conflicts actually get resolved. — Ch. 18
  • how do you announce it — Ch. 24
  • How escalation clauses are structured — Ch. 4
  • How far ahead it runs. — Ch. 27
  • how good — Ch. 7
  • How installed — Ch. 7
  • How it settled. — Ch. 31
  • how long — Ch. 22
  • How long — Ch. 26
  • How many — Ch. 7
  • how many — Ch. 7
  • how much you are entitled to rely on an element — Ch. 36
  • how much you are entitled to rely on an element. — Ch. 35
  • How owners detect it. — Ch. 32
  • How the builder is selected — Ch. 3
  • How the fee line is computed. — Ch. 32
  • How to control cost-plus. — Ch. 4
  • How to read your results. — Ch. 12
  • How to read your score. — Ch. 42
  • How unit price actually gets administered — Ch. 4
  • How verified — Ch. 7
  • How We Build. — Ch. 3
  • How working days actually work. — Ch. 38
  • How you break it. — Ch. 38
  • Human health and occupant wellbeing — Ch. 36
  • HVAC — Ch. 10
  • HVAC protection — Ch. 36
  • Hydraulic / timber shoring — Ch. 22
  • hydraulic calculation — Ch. 10
  • Hydronic pipe — Ch. 35
  • identical data — Ch. 24
  • Identification — Ch. 29
  • identified risk within the defined scope. — Ch. 4
  • Identifies what is being settled — Ch. 33
  • Identifies what is not being settled — Ch. 33
  • Identify the constrained system — Ch. 10
  • Idle / personal — Ch. 20
  • Idle and standby — Ch. 21
  • Idle and standby time — Ch. 21
  • Idle equipment and standby — Ch. 33
  • Idle time as a percentage of engine hours — Ch. 39
  • idle/standby — Ch. 31
  • idling policy — Ch. 21
  • if and when it occurs — Ch. 38
  • If it goes badly — Ch. 41
  • If it goes badly. — Ch. 41
  • If it will not settle — Ch. 40
  • If missed — Ch. 37
  • if the work turns out to conform — Ch. 23
  • If they will not sign — Ch. 26
  • If you must run sustained overtime, rotate it. — Ch. 20
  • IFC — Ch. 35
  • Ignorance — Ch. 6
  • Illumination. — Ch. 24
  • illustrative — Ch. 21
  • illustrative typical numbers — Ch. 24
  • illustrative typical ranges, not rules — Ch. 11
  • Imaging and surgery are their own worlds. — Ch. 10
  • Imaging suite — Ch. 40
  • Immediate action taken — Ch. 23
  • immediate stop-work in the affected area — Ch. 38
  • immediately — Ch. 32 5
  • Imminent danger — Ch. 24
  • impact statement — Ch. 26
  • Impact subtotal — Ch. 31
  • impacted — Ch. 31
  • Impacted — Ch. 33
  • Impacted as-planned — Ch. 33
  • Implied warranty of the plans and specifications — Ch. 6
  • importance of their advantages — Ch. 27
  • Improper reshore load path — Ch. 22
  • In a lump-sum contract, — Ch. 6
  • in a sequence that never lets the slab deflect — Ch. 22
  • in actual calendar time — Ch. 33
  • In an open-book GMP or cost-plus contract, — Ch. 6
  • In cash flow — Ch. 31
  • in four days. — Ch. 23
  • in full — Ch. 4
  • in half — Ch. 27
  • in nine calendar days — Ch. 25
  • in parallel — Ch. 37
  • in person — Ch. 41
  • In practice you will not get this — Ch. 23
  • in preconstruction — Ch. 35
  • in the bank — Ch. 38
  • In the cost report — Ch. 31
  • In the forecast. — Ch. 31
  • in the subcontract — Ch. 22
  • in the subcontract at buyout — Ch. 36
  • in time — Ch. 24
  • in writing — Ch. 23
  • in writing, in advance — Ch. 18
  • in writing, promptly — Ch. 7
  • In-house training. — Ch. 20
  • in-situ relative humidity probe test — Ch. 9
  • In-stream work windows — Ch. 38
  • In-wall blocking and backing — Ch. 16
  • IN-WALL INSPECTION (HOLD POINT) — Ch. 9
  • In-wall rough-in — Ch. 9
  • in-wall rough-in inspection — Ch. 10
  • Inadequate bearing at the base — Ch. 22
  • Inadequate bracing — Ch. 22
  • inboard — Ch. 7
  • incentive — Ch. 38
  • Incentive and shared-savings arrangements — Ch. 4
  • Incident investigation — Ch. 24
  • Incident reporting and investigation — Ch. 24
  • Incidental — Ch. 38
  • incidental — Ch. 38
  • Include a resubmittal allowance in every chain — Ch. 25
  • Include the bad facts. — Ch. 33
  • including Addenda 1 through 3. — Ch. 13
  • including architectural precast panels — Ch. 13
  • including retention billed — Ch. 34
  • Income from operations — Ch. 34
  • Incomplete submission — Ch. 25
  • Incomplete work — Ch. 23 40
  • indemnitee — Ch. 5
  • indemnitor — Ch. 5
  • Indemnity — Ch. 16 4
  • indemnity — Ch. 2 34
  • indemnity clause — Ch. 5
  • Indemnity. — Ch. 24
  • independent — Ch. 40
  • independent contractor — Ch. 5
  • independent contractor. — Ch. 20
  • Independent float — Ch. 14
  • independent number — Ch. 12
  • Independent testing laboratory — Ch. 23
  • Index-based with a deadband — Ch. 4
  • Indices — Ch. 30
  • Indirect costs — Ch. 12
  • indirect-fired — Ch. 22
  • Indirectly — Ch. 5
  • Indirects and markups — Ch. 12
  • Individual variance swamps all of it. — Ch. 42
  • Individually — Ch. 31
  • Indoor air quality assessment — Ch. 36
  • Indoor Environmental Quality — Ch. 36
  • Industrial — Ch. 2
  • Infection Control Risk Assessment (ICRA) — Ch. 24
  • Inflating impact. — Ch. 31
  • Influence — Ch. 41
  • Info — Ch. 25
  • information — Ch. 25 8
  • Information — Ch. 27
  • Information (12). — Ch. 27
  • Infrared thermography — Ch. 9
  • infrastructure — Ch. 36
  • injunction — Ch. 21
  • Injuries and near-injuries — Ch. 41
  • Injuries. — Ch. 18
  • Innovation — Ch. 36
  • inside — Ch. 21
  • Inside the building, floor by floor — Ch. 17
  • insisted on the original completion date — Ch. 29
  • Inspection — Ch. 23 27
  • inspection — Ch. 7
  • Inspection and quality checklists — Ch. 39
  • Inspection and test plan (ITP) — Ch. 23
  • inspection and test plan (ITP) — Ch. 23
  • Inspection availability becomes a constraint. — Ch. 22
  • inspection hold point — Ch. 8
  • inspection hold points — Ch. 8
  • Inspection regime — Ch. 24
  • Inspections performed and results — Ch. 26
  • inspector. — Ch. 10
  • inspects — Ch. 22
  • Installation — Ch. 16
  • installation inspection by the competent person — Ch. 25
  • installation lead — Ch. 17
  • installed quantities — Ch. 30
  • Installer certification — Ch. 10
  • Installer never saw the approved submittal — Ch. 23
  • installing crew present — Ch. 23
  • Instant messaging in a project platform — Ch. 26
  • instruction — Ch. 35
  • Instruction, breaks, and administration — Ch. 18
  • Instructions to bidders — Ch. 15
  • Insufficient strength at stripping — Ch. 22
  • Insulating concrete forms (ICF) — Ch. 22
  • Insulation — Ch. 10 36 9
  • Insulation / air barrier inspection — Ch. 37
  • Insulation installation quality — Ch. 36
  • Insulation. — Ch. 10
  • Insurance — Ch. 2 39
  • Insurance and additional insured — Ch. 16
  • Insurance and bonding — Ch. 15
  • Insurance and bonds — Ch. 13
  • Insurance is complicated — Ch. 3
  • Insurance limits — Ch. 19
  • Insurance, taxes, licenses. — Ch. 21
  • Insurers — Ch. 1 2
  • Integrated Project Delivery (IPD) — Ch. 27
  • Integrated project delivery (IPD) — Ch. 3
  • Integration timing dominates everything. — Ch. 36
  • Integrative Process — Ch. 36
  • Interconnection. — Ch. 36
  • Interest (why) — Ch. 41
  • interfaces — Ch. 35
  • Interfaces again. — Ch. 24
  • interference — Ch. 20
  • Interference / failure to coordinate — Ch. 33
  • Interfering float (IF) — Ch. 14
  • Interim Life Safety Measures (ILSM) — Ch. 18
  • Interim management milestones — Ch. 14
  • interior metal-stud framing, cost code 09 2216 — Ch. 20
  • interiors and closeout — Ch. 17
  • Intermediate form — Ch. 5
  • internal — Ch. 28
  • Internal bracing (struts) — Ch. 22
  • Internal failure — Ch. 23
  • Internal project team meeting — Ch. 26
  • Internal rate at 1.15 — Ch. 13
  • internal rental rate — Ch. 13
  • internal traffic control plan — Ch. 21
  • internal traffic control plan (ITCP) — Ch. 24
  • internally inconsistent — Ch. 7
  • International Energy Conservation Code (IECC) — Ch. 36
  • International Group for Lean Construction (IGLC) — Ch. 27
  • Interpretation — Ch. 25
  • inventoried and stored in a locked, labeled room — Ch. 40
  • Inventory — Ch. 27
  • Investing activities — Ch. 34
  • IPD — Ch. 3
  • is a portfolio. — Ch. 42
  • is not proof of coverage. — Ch. 5
  • Isolation — Ch. 41
  • issue date — Ch. 7
  • It aligns with the cost codes. — Ch. 32
  • It aligns with the schedule. — Ch. 32
  • It can be a licensing matter. — Ch. 23
  • it cannot be used for scope changes — Ch. 6
  • It compresses ranges — Ch. 6
  • it contains no spoil haul-off — Ch. 12
  • It converts a forecast into a testable claim. — Ch. 30
  • it converts a post-mortem into a decision. — Ch. 20
  • It costs more money than the fix. — Ch. 23
  • It cuts against the contractor. — Ch. 23
  • It cuts against the owner and the architect too — Ch. 23
  • It does arithmetic on labels — Ch. 6
  • It does not certify at all. — Ch. 36
  • It does not cover what you should have caught. — Ch. 3
  • it does not even work. — Ch. 32
  • it does not protect you. — Ch. 5
  • it does not work. — Ch. 33
  • It forces valuation. — Ch. 33
  • It gates occupancy. — Ch. 10
  • It hides its own float. — Ch. 14
  • It is a company number, not a project number. — Ch. 24
  • it is a cost performance index in hours. — Ch. 30
  • It is a credit line the surety can withdraw — Ch. 34
  • It is a decision about people that has a cost. — Ch. 41
  • It is a default, not a law of nature. — Ch. 3
  • It is a factual dispute about physical constraint — Ch. 29
  • it is also your authority. — Ch. 22
  • It is an event. — Ch. 6
  • It is defensible — Ch. 3
  • It is discretionary. — Ch. 25
  • It is linear. — Ch. 24
  • It is not a licensing body. — Ch. 24
  • It is not an insurer. — Ch. 24
  • It is not everywhere. — Ch. 24
  • It is not the only regulator on your site. — Ch. 24
  • it is not widely used in building construction. — Ch. 30
  • it is ready much later — Ch. 39
  • It is short. — Ch. 41
  • It is simple to administer — Ch. 3
  • It is that it loses. — Ch. 33
  • It is uncertain. — Ch. 6
  • It is vulnerable to hindsight. — Ch. 24
  • It is your billing forecast. — Ch. 14
  • It is your first early-warning system. — Ch. 14
  • It kills the learning curve. — Ch. 2
  • It makes technology adoption brutally slow. — Ch. 2
  • it muddies the single point of responsibility — Ch. 3
  • It poisons the field. — Ch. 13
  • It protected the owner, using your credit. — Ch. 15
  • it protects itself. — Ch. 27
  • It puts you in a different legal posture. — Ch. 23
  • It removes the place the problem was hiding. — Ch. 34
  • it removes work rather than adding it — Ch. 39
  • It shrinks as the relationship does. — Ch. 25
  • It stopped at the bottom of the units. — Ch. 36
  • It surfaces non-monetary trades. — Ch. 33
  • It varies by jurisdiction. — Ch. 24
  • It weights frequency more heavily than severity. — Ch. 24
  • it will not issue while a bond claim is open — Ch. 40
  • Item 4.3, Imaging Suite. — Ch. 26
  • Item 6.1, Schedule. — Ch. 26
  • its own line — Ch. 11 37
  • Jamal Foster — Ch. 28
  • Jan 12, Year 2 — Ch. 10
  • January 12, Year 2 — Ch. 10
  • January 31, Year 2 — Ch. 16 30
  • January 5, Year 2 — Ch. 25 9
  • Job B — Ch. 32
  • job borrow — Ch. 34
  • Job hazard analysis — Ch. 24
  • job hazard analysis (JHA) — Ch. 24
  • Job order contracting (JOC) — Ch. 3
  • job safety analysis (JSA) — Ch. 24
  • Job-built plywood and lumber — Ch. 22
  • joinder — Ch. 5
  • joint check — Ch. 32
  • joint check agreement — Ch. 32
  • Joint check to Aperture and Northfield — Ch. 32
  • joint checks — Ch. 16 5
  • Joint checks — Ch. 19
  • Joint design is arithmetic, not preference. — Ch. 9
  • joint layout — Ch. 8
  • Joints — Ch. 8
  • Journeyman — Ch. 42
  • Journeyman / journey-level worker — Ch. 20
  • journeyman form carpenter — Ch. 20
  • Judgment — Ch. 28
  • Judgment / re-estimate — Ch. 28
  • Judgment against a defined scope breakdown. — Ch. 32
  • Jul 21, Year 1 — Ch. 10
  • Jul 25 — Ch. 29
  • July 14, Year 1 — Ch. 16
  • July 19, Year 1 — Ch. 16
  • July 20 to September 18 is 61 calendar days. — Ch. 40
  • July 20, Year 2 — Ch. 10 36
  • July 29, Year 1 — Ch. 16
  • July 3, Year 1 — Ch. 39 8
  • July 9, Year 1 — Ch. 25
  • Jump / self-climbing forms — Ch. 22
  • Jumping (climbing). — Ch. 21
  • June 14, Year 1 — Ch. 16
  • June 18 — Ch. 25
  • June 2, Year 1 — Ch. 16
  • June 22, Year 1 — Ch. 25
  • June 24, Year 1 — Ch. 16
  • June 9, Year 1 — Ch. 10
  • Jurisdiction — Ch. 20
  • jurisdictional dispute — Ch. 20
  • jurisdictional question — Ch. 5
  • jurisdictional. — Ch. 16
  • Just-in-time (JIT) — Ch. 18
  • K-12 — Ch. 7
  • Keep a list, and keep it in one place. — Ch. 41
  • Keep a revision log even though nobody makes you. — Ch. 37
  • Keep one foot in the general work — Ch. 42
  • Keep records the pricing mechanism requires — Ch. 31
  • Keep relationships warm before you need them — Ch. 42
  • Keep the estimate file — Ch. 15
  • Keep three, abandon three. — Ch. 37
  • Kessler Drywall & Acoustics — Ch. 5
  • Kestrel — Ch. 24 25 41
  • Kestrel (construction contingency) — Ch. 6
  • Kestrel (Curtis Boone) — Ch. 2
  • Kestrel advised on the spot — Ch. 26
  • Kestrel Construction Group — Ch. 15 19
  • Kestrel on time, Caldwell takes all 14 — Ch. 29
  • Kestrel review and transmittal — Ch. 16
  • Key personnel — Ch. 13
  • key plan — Ch. 7
  • Keys and keying schedule — Ch. 40
  • Kill criterion — Ch. 39
  • Kill on the criterion, not on a mood. — Ch. 39
  • Know their alternative — Ch. 31
  • Know their constraints — Ch. 31
  • Know where to refer, before you need it. — Ch. 41
  • Know your cost cold — Ch. 31
  • Know your entitlement — Ch. 31
  • Know your own weak lines — Ch. 31
  • Know your walk-away — Ch. 31
  • known quantity — Ch. 37
  • L was no longer on the only critical path. — Ch. 29
  • lab-cured — Ch. 22 23
  • Lab-cured cylinders do not answer this question — Ch. 23
  • Labeled — Ch. 31
  • Labor — Ch. 27 31 39
  • labor — Ch. 30
  • Labor availability — Ch. 6
  • Labor available — Ch. 27
  • Labor cost — Ch. 14
  • Labor gets the tightest loop — Ch. 28
  • Labor is time-based. — Ch. 12
  • Labor Plan — Ch. 20
  • Labor records / certified payroll — Ch. 26
  • Laborer — Ch. 20
  • Laborer, Group 1 — Ch. 20
  • Ladders and step stools replace scaffolding — Ch. 40
  • Ladders inspected and the right length. — Ch. 37
  • Ladders. — Ch. 24
  • lag — Ch. 14
  • lagging — Ch. 19 29
  • Lagging — Ch. 29
  • Lags. — Ch. 14
  • Lane closure windows — Ch. 38
  • lane rental — Ch. 38
  • language — Ch. 24
  • Language barriers — Ch. 37
  • lap splice — Ch. 8
  • Lap splice and development length — Ch. 8
  • Large ductwork — Ch. 10
  • Large institutional and healthcare owners. — Ch. 30
  • Large national contractor — Ch. 42
  • Large pressure pipe — Ch. 10
  • Larkspur Builders — Ch. 34
  • Laser scanning — Ch. 35
  • Laser scanning, existing conditions — Ch. 39
  • last calendar day of the month — Ch. 29
  • last day of the month — Ch. 32
  • last planner — Ch. 27
  • Last Planner System (LPS) — Ch. 27
  • Later modifications govern over earlier ones. — Ch. 7
  • Lateral concrete pressure — Ch. 22
  • lateral concrete pressure — Ch. 22
  • Lateral external load — Ch. 22
  • latest — Ch. 3
  • Laydown — Ch. 15
  • Laydown adjacency. — Ch. 18
  • Laydown in the northwest quadrant — Ch. 17
  • layers and non-partition surfaces — Ch. 7
  • Layout — Ch. 16 9
  • layout — Ch. 17
  • layout error discovered after the pour — Ch. 10
  • layout robot — Ch. 35
  • Layout robot / robotic total station — Ch. 39
  • Layout robots — Ch. 39
  • LDs run — Ch. 29
  • LDs stop — Ch. 40
  • lead — Ch. 14 5
  • Lead — Ch. 5
  • lead time. — Ch. 2
  • Lead times are long and lumpy. — Ch. 9
  • Lead-time chains do not stretch. They snap. — Ch. 29
  • Leadership — Ch. 39
  • leading — Ch. 19 20 29
  • Leading — Ch. 29
  • Leading edges. — Ch. 24
  • leading indicator — Ch. 26
  • Leading indicators — Ch. 24
  • leads — Ch. 32
  • Leads and lags. — Ch. 14
  • Lean Construction Institute — Ch. 42
  • Lean Construction Institute (LCI) — Ch. 27
  • lean on a coworker who wants to report — Ch. 24
  • Learn some of the language yourself — Ch. 41
  • Learning check-in. — Ch. 15 18 21 24 27 3 30 33 36 39 42 6 9
  • Learning-curve loss — Ch. 31
  • lease — Ch. 21
  • least flexible pipe in the ceiling — Ch. 10
  • LEED — Ch. 36
  • LEED AP — Ch. 42
  • Left the critical path — Ch. 14
  • Legal-Framework Checklist — Ch. 5
  • legible — Ch. 12
  • Legitimate. — Ch. 4
  • Lender — Ch. 1
  • Lenders — Ch. 2
  • Length — Ch. 23 24
  • Less — Ch. 31
  • less function for less cost — Ch. 11
  • Less site labor in a tight labor market. — Ch. 39
  • less zone redundancy — Ch. 11
  • lesser amount — Ch. 32
  • Let him talk. — Ch. 41
  • Level 1 milestone schedule — Ch. 14
  • Level 2 summary schedule — Ch. 14
  • Level 3 CPM network — Ch. 14
  • Level 3, Zone B — Ch. 27
  • Level of development (LOD) — Ch. 35
  • Level of effort — Ch. 28
  • Level of effort (LOE) — Ch. 30
  • Level the submission curve — Ch. 25
  • level your submission curve. — Ch. 25
  • Level-2 coordination sign-off — Ch. 10
  • Level-of-effort dilution. — Ch. 30
  • Leveled subtotal — Ch. 13
  • LEVELED TOTAL — Ch. 13
  • Leveling — Ch. 13
  • levels — Ch. 15
  • leverage. — Ch. 19
  • LIABILITIES AND EQUITY — Ch. 34
  • liability — Ch. 34
  • license agreement — Ch. 17
  • Licensed blaster and permits — Ch. 38
  • Licensing — Ch. 2
  • licensing — Ch. 37
  • Licensing / accreditation survey — Ch. 40
  • lien waiver — Ch. 5
  • Lien waivers — Ch. 16
  • life safety — Ch. 10
  • Life-safety final walk — Ch. 40
  • lift-by-lift compaction testing — Ch. 8
  • lifts — Ch. 8
  • light duty (25 psf) — Ch. 22
  • Light wood frame — Ch. 8
  • Lighting — Ch. 18
  • Lighting controls — Ch. 10
  • Lighting power and controls — Ch. 36
  • like a demotion in competence. — Ch. 41
  • Limited — Ch. 39
  • Limited / comparative — Ch. 5
  • Limited assurance — Ch. 34
  • Limited but real — Ch. 39
  • limited-access zone — Ch. 22
  • line — Ch. 37 38
  • Line of balance / linear schedule — Ch. 14
  • Line pump — Ch. 21
  • Line-item release — Ch. 32
  • line-of-balance — Ch. 14
  • Linear/time-location scheduling — Ch. 38
  • Liquidated damages — Ch. 1 4 5
  • liquidated damages — Ch. 4
  • liquidated damages (LDs) — Ch. 9
  • Liquidated damages and milestones — Ch. 15
  • Liquidated damages per calendar day — Ch. 4
  • liquidated damages run — Ch. 29
  • liquidated damages stop — Ch. 40
  • list their subcontractors — Ch. 13
  • List them with the reason. — Ch. 14
  • listed through-penetration firestop system — Ch. 9
  • Listen to it — Ch. 13
  • literal — Ch. 33
  • Literal concurrency — Ch. 33
  • Litigation — Ch. 33 5
  • Little Miller Act — Ch. 5
  • live operational data — Ch. 35
  • Live-instrumented digital twin — Ch. 35
  • Living Building Challenge — Ch. 36
  • load — Ch. 10
  • load chart — Ch. 21
  • Load classes. — Ch. 22
  • load factor — Ch. 21
  • Load paths in old buildings are not obvious. — Ch. 22
  • Load-bearing masonry — Ch. 8
  • LOB — Ch. 37
  • Locates have a tolerance and an expiration — Ch. 8
  • Locates mark public utilities, not private ones — Ch. 8
  • location — Ch. 11
  • Location and Transportation — Ch. 36
  • Lock the formula cells. — Ch. 13
  • Locked by — Ch. 37
  • Locked, alarmed conex boxes — Ch. 18
  • Lockout/tagout (LOTO). — Ch. 24
  • Lockout/tagout. — Ch. 10
  • LOD artifact — Ch. 35
  • LOD does not support it — Ch. 35
  • LOD is about reliance, not detail. — Ch. 35
  • LOD matrix by element and phase — Ch. 35
  • Log backorders the day they appear. — Ch. 18
  • Log it — Ch. 7
  • Log the expiration date of every quote — Ch. 16
  • Log the notice. — Ch. 27
  • Logic — Ch. 14
  • Logic and duration changes — Ch. 29
  • Logistics. — Ch. 16
  • Long-lead identification — Ch. 11
  • long-lead identification — Ch. 11
  • Long-lead items are now late. — Ch. 11
  • longer — Ch. 21
  • longest lead item — Ch. 8
  • Look at the ratio. — Ch. 31
  • Look for the queue on the ground. — Ch. 37
  • Look-ahead visualization for lean planning. — Ch. 35
  • loose — Ch. 38
  • Loose — Ch. 8
  • Loose (LCY) — Ch. 21
  • loose measure — Ch. 8
  • Lorena Vasquez — Ch. 28
  • Losing a good foreman — Ch. 41
  • Losing a good superintendent — Ch. 41
  • lost anticipated profit on work never performed — Ch. 38
  • Low — Ch. 28
  • low permeability — Ch. 22
  • Low to moderate. — Ch. 36
  • low voltage — Ch. 10
  • Low voltage — Ch. 10 35
  • Low-bid competition pushes contract price down. — Ch. 2
  • Low-emitting materials — Ch. 36
  • Low-impact development (LID) — Ch. 36
  • low-voltage — Ch. 10
  • Low-voltage switchgear — Ch. 25
  • Low. — Ch. 36
  • Lower — Ch. 24
  • Lower-carbon steel sourcing. — Ch. 36
  • Lowest — Ch. 3
  • Lowest by design — Ch. 3
  • Lowest per SF — Ch. 22
  • lowest rate — Ch. 37
  • lowest responsive, responsible bidder — Ch. 2
  • luffing-jib — Ch. 21
  • lump sum — Ch. 1 3
  • Lump sum — Ch. 4
  • LUMP SUM PRICE — Ch. 4
  • Lump sum price — Ch. 4
  • M-104 — Ch. 25
  • machine control — Ch. 38
  • Machine control — Ch. 39
  • Machine control / grade control on earthmoving — Ch. 39
  • Machine cost per LCY — Ch. 21
  • Machine cost per loose cubic yard — Ch. 21
  • Machine X. — Ch. 21
  • Machine Y. — Ch. 21
  • magnitudes, not measurements — Ch. 25
  • Maintainability — Ch. 11
  • maintained envelope — Ch. 10
  • major — Ch. 38
  • major item — Ch. 38
  • major items — Ch. 38
  • Make each trade foreman sign a self-punch sheet — Ch. 9
  • Make their work easy and profitable — Ch. 19
  • Make yourself replaceable on purpose — Ch. 42
  • man-hours — Ch. 15
  • Manage the relationship honestly. — Ch. 10
  • management — Ch. 7
  • Management reserve — Ch. 6
  • Manages by meeting. — Ch. 37
  • Manages by presence. — Ch. 37
  • Mandatory Start / Mandatory Finish — Ch. 14
  • Manpower by subcontractor and trade — Ch. 26
  • Manpower thresholds — Ch. 19
  • Manpower. — Ch. 26
  • manual premium — Ch. 24
  • Manual takeoff — Ch. 35
  • manufacturer-issued written repair procedure — Ch. 23
  • Manufacturers and Materials — Ch. 7
  • Many trades in small areas doing small tasks. — Ch. 40
  • Many valid claims are not worth pursuing — Ch. 33
  • Map and rank — Ch. 36
  • March 10, Year 1 — Ch. 25
  • March 13 — Ch. 25
  • March 13, Year 1 — Ch. 25
  • March 18 — Ch. 27
  • March 2, Year 2 — Ch. 25
  • March 22 — Ch. 25
  • March 27 — Ch. 27
  • March 28 of Year 2 — Ch. 22
  • March 28, Year 2 — Ch. 16 18 9
  • March 3, Year 1 — Ch. 14 34 40 9
  • March 30 — Ch. 27
  • March 7, Year 1 — Ch. 16 25
  • Margin — Ch. 12 13
  • margin — Ch. 31
  • Margin lost despite winning the claim — Ch. 38
  • marginal — Ch. 20
  • marginal cost really is below your average cost — Ch. 2
  • Margo Deacon — Ch. 25 28
  • Margo did two things Dani did not do. — Ch. 41
  • Mark them visibly. — Ch. 24
  • Market allocation — Ch. 15
  • Market and escalation analysis — Ch. 11
  • Market conditions. — Ch. 3
  • Market coverage — Ch. 11
  • market price testing — Ch. 3
  • Markup — Ch. 12 13
  • Markups — Ch. 12
  • Masonry — Ch. 23
  • masonry from scaffold — Ch. 24
  • Masonry veneer — Ch. 9
  • Masonry walls. — Ch. 22
  • mass haul diagram — Ch. 38
  • Mass timber — Ch. 36 8
  • Mass timber (CLT/glulam/NLT) — Ch. 8
  • Mast climbers — Ch. 9
  • Mast climbers, hoists, and suspended platforms. — Ch. 25
  • Mast climbing work platform — Ch. 21 22
  • Mat (raft) foundation — Ch. 8
  • Match codes to quantities. — Ch. 20
  • Match lines — Ch. 7
  • matched — Ch. 38
  • Matched fleet — Ch. 21
  • material — Ch. 15
  • Material — Ch. 31
  • Material (14). — Ch. 27
  • Material and tool tracking — Ch. 39
  • Material handling — Ch. 19
  • Material handling and searching — Ch. 18
  • Material hoist — Ch. 21
  • Material is quantity-based. — Ch. 12
  • Material not on site — Ch. 27
  • Material on site — Ch. 27
  • Material per CY — Ch. 12
  • material waste and short loads — Ch. 12
  • materially unbalanced — Ch. 15 38 4
  • Materials and Resources — Ch. 36
  • Materials handling. — Ch. 36
  • Materials testing — Ch. 23
  • Materials, at the point of purchase — Ch. 36
  • materials-index adjustment — Ch. 11
  • matrix — Ch. 35
  • maturity method — Ch. 22 39
  • maximum dry density — Ch. 8
  • maximum wind speed — Ch. 21
  • May 12, Year 1 — Ch. 16 25
  • May 22 — Ch. 40
  • May 23 — Ch. 29
  • May 23, Year 1 — Ch. 25
  • May 26, Year 1 — Ch. 25
  • May 30, Year 2 — Ch. 10
  • May 6 — Ch. 27
  • May 6, Year 2. — Ch. 27
  • May 9, Year 1 — Ch. 8
  • may not proceed — Ch. 23
  • MBA. — Ch. 42
  • MBF — Ch. 12
  • mean — Ch. 6
  • means and methods — Ch. 35 6
  • Means and Methods. — Ch. 8
  • Means of egress — Ch. 22
  • measurable — Ch. 20
  • measure and certify every quantity — Ch. 4
  • measure. — Ch. 4
  • Measured energy and envelope performance — Ch. 36
  • measured mile — Ch. 20
  • Measured mile — Ch. 33
  • Measured operating energy performance — Ch. 36
  • measured performance — Ch. 36
  • measured quantity — Ch. 38
  • Measurement and payment — Ch. 6
  • measurement method — Ch. 38
  • mechanical — Ch. 10
  • mechanical and electrical rooms — Ch. 35
  • Mechanical equipment efficiency — Ch. 36
  • Mechanical rooms change shape — Ch. 36
  • mechanical, electrical, and plumbing — Ch. 10
  • mechanism — Ch. 20
  • Mediation — Ch. 33 5
  • Medical and first aid — Ch. 24
  • medical gas — Ch. 10 13
  • Medical gas — Ch. 13 35
  • medical gas installation permit — Ch. 27
  • Medical gas verification — Ch. 23 40
  • medium duty (50 psf) — Ch. 22
  • Medium to high — Ch. 36
  • Meeting calendar and distribution matrix — Ch. 17
  • Meeting minutes — Ch. 26
  • Meetings and reporting — Ch. 25
  • Mentor and pair. — Ch. 19
  • MEP — Ch. 10 9
  • MEP / model coordination meeting — Ch. 26
  • MEP coordination, not structure. — Ch. 19
  • MEP engineer — Ch. 1
  • MEP rough-in complete, all levels — Ch. 10
  • MEP total — Ch. 10
  • Merge bias. — Ch. 6
  • Meridian — Ch. 23
  • Meridian (owner) — Ch. 6
  • Meridian Health System — Ch. 24
  • Meridian interim clinic lease expires — Ch. 40
  • MERV — Ch. 10
  • Metadata — Ch. 26
  • Metal deck — Ch. 8
  • Metal panel — Ch. 9
  • Metal stud framing — Ch. 9
  • Methods available — Ch. 33
  • Microsoft Project — Ch. 14
  • mid-design — Ch. 3
  • Mid-size regional (Kestrel) — Ch. 42
  • middle — Ch. 22
  • midpoint of construction — Ch. 11
  • Milestone / weighted steps — Ch. 28
  • Milestone budgeting — Ch. 11
  • Milestone schedule — Ch. 14
  • mill release date of April 18 — Ch. 25
  • Mill release deadline April 18 missed by 3 CD. — Ch. 29
  • mill rolling slot — Ch. 10 14
  • mill rolling slot is next Wednesday. — Ch. 1
  • Miller Act — Ch. 2
  • Milo Serrano — Ch. 27 29
  • minimum approach distance — Ch. 21
  • minor informality — Ch. 15
  • Minute 30 onward. — Ch. 23
  • Minutes — Ch. 26
  • Minutes 0 to 8. — Ch. 19
  • Minutes 14 to 22. — Ch. 19
  • Minutes 22 to 31. — Ch. 19
  • Minutes 31 to 40. — Ch. 19
  • Minutes 8 to 14. — Ch. 19
  • Miscellaneous but real — Ch. 17
  • Misclassification. — Ch. 20
  • Misclassifying as first-aid-only — Ch. 24
  • Missed by 3 — Ch. 29
  • Missed inspections. — Ch. 9
  • Missed. — Ch. 26
  • Misses the contract. — Ch. 37
  • Misses the money model. — Ch. 37
  • Missing coordination between trades — Ch. 23
  • mitigate — Ch. 4 6
  • Mitigate — Ch. 6
  • Mix design and temperature. — Ch. 38
  • Mixed products. — Ch. 9
  • Mobile hydraulic truck crane — Ch. 21
  • Mobile tower (rolling) — Ch. 22
  • Mobilization — Ch. 28
  • Mobilization and demobilization — Ch. 13 21
  • Mobilization plan and schedule — Ch. 17
  • Mockup — Ch. 23
  • Mockup and benchmark schedule — Ch. 23
  • Mockups — Ch. 25
  • mockups — Ch. 7
  • Mockups and benchmark installations. — Ch. 19
  • model — Ch. 14
  • model code — Ch. 36
  • Model extraction — Ch. 35
  • model, serial number — Ch. 40
  • Model-based layout — Ch. 35
  • Modeled owner outlay — Ch. 3
  • Models nobody trusts — Ch. 35
  • Moderate — Ch. 36
  • Moderate. — Ch. 33 36
  • Modification control — Ch. 22
  • modification-control procedure — Ch. 22
  • modification-control rule — Ch. 22
  • Modifications — Ch. 4 7
  • Modified bitumen — Ch. 9
  • modified total cost method — Ch. 33
  • Modular and volumetric offsite housing — Ch. 37
  • Moisture is the enemy — Ch. 36
  • moisture management plan — Ch. 8
  • Moisture protection during erection — Ch. 8
  • Moisture protection during erection. — Ch. 8
  • Monday — Ch. 25
  • money — Ch. 29 33 6
  • Money — Ch. 41
  • money and procurement — Ch. 28
  • Money check. — Ch. 1 10 12 13 14 15 22 23 32 34 35 4 6 8
  • Money flows up the pyramid — Ch. 2
  • money problem — Ch. 14
  • Monitoring-based commissioning — Ch. 40
  • Monte Carlo simulation — Ch. 6
  • month five — Ch. 32
  • month fourteen — Ch. 36
  • month-6 data date — Ch. 29
  • month-four — Ch. 28
  • monthly — Ch. 25 29
  • Monthly owner / executive review — Ch. 26
  • Monthly pay application, SOV, retention — Ch. 37
  • Monthly tracking log — Ch. 36
  • Monthly updating — Ch. 27
  • Months of backlog — Ch. 34
  • more cash — Ch. 34
  • more findings each — Ch. 24
  • More levels of shores and reshores stay in place — Ch. 22
  • more likely to be true — Ch. 26
  • more money — Ch. 8
  • more slowly — Ch. 36
  • more than 10 feet above a lower level — Ch. 22
  • more than half of the scheduled shift — Ch. 18
  • Most contractors forget to bill it. — Ch. 31
  • Most defensible. — Ch. 33
  • most likely — Ch. 14
  • Most of the people you lead do not work for you — Ch. 41
  • Most stringent governs — Ch. 7
  • Mostly fact — Ch. 28
  • Motion — Ch. 27
  • Move the roofing loads to the crane. — Ch. 18
  • MOVE. — Ch. 18
  • moved — Ch. 22
  • moves — Ch. 29
  • MSF — Ch. 12
  • Mtd — Ch. 28
  • mudsills — Ch. 22
  • multi-employer worksite — Ch. 24
  • multi-employer worksite policy — Ch. 24
  • multi-trade rack — Ch. 10 35
  • Multi-trade racks — Ch. 39
  • Multifamily — Ch. 2 37
  • multifamily — Ch. 37
  • multiple critical paths — Ch. 14
  • multiple-prime — Ch. 3
  • Multiply by WIP. — Ch. 37
  • municipal owner — Ch. 40
  • must resolve — Ch. 35
  • Mutual waiver of liability. — Ch. 3
  • My position, for whatever it is worth. — Ch. 36
  • Nadia decides the final number. Then it is locked — Ch. 15
  • Nadia Haddad — Ch. 28 42
  • Nadia Haddad as executive sponsor — Ch. 39
  • Nadia will ask you for this number. Have it. — Ch. 24
  • nail-laminated timber (NLT) — Ch. 8
  • Name an end date and hold it. — Ch. 41
  • name and classification — Ch. 31
  • Name the team for real, early. — Ch. 15
  • Name your rate and your source — Ch. 11
  • Name your top three risks out loud, in the deck, — Ch. 15
  • named competent person — Ch. 22
  • named executive sponsor — Ch. 15
  • named human being — Ch. 24
  • named it as not a performance conversation — Ch. 41
  • named owner of the daily model-to-field file — Ch. 39
  • named person — Ch. 26
  • named, priced allowances — Ch. 3
  • named, specific, physical change — Ch. 30
  • named-candidate — Ch. 41
  • names — Ch. 23
  • Names, classifications, and hours — Ch. 26
  • Naming — Ch. 26
  • naming an owner for it — Ch. 36
  • National CAD Standard — Ch. 7
  • Natural gas. — Ch. 10
  • NAWIC — Ch. 42
  • NCR number and date — Ch. 23
  • NDL — Ch. 9
  • NDL system warranty — Ch. 9
  • near-critical — Ch. 14
  • Near-critical paths — Ch. 29
  • near-miss — Ch. 22
  • Near-miss reporting rate — Ch. 24
  • Near-miss reports submitted — Ch. 24
  • neat line — Ch. 38
  • Neat-line measurement. — Ch. 38
  • Need-by date — Ch. 27
  • Needle beams — Ch. 22
  • needs — Ch. 22
  • negative — Ch. 10 27
  • negative air pressure inside the work zone — Ch. 18
  • Negative float — Ch. 14
  • Negative lags. — Ch. 14
  • Negotiate — Ch. 33
  • negotiate a joint check — Ch. 5
  • Negotiate early and expect a discount. — Ch. 33
  • negotiate or accept — Ch. 4
  • Negotiate the components you can verify. — Ch. 42
  • Negotiate the price hold explicitly. — Ch. 16
  • Negotiate. — Ch. 4
  • Negotiated / repeat client — Ch. 15
  • Negotiated work and repeat clients. — Ch. 15
  • Neil Bhandari — Ch. 21
  • neither one is a spreadsheet error. — Ch. 30
  • Net — Ch. 33 38
  • Net (neat-line) volume — Ch. 12
  • Net benefit of the 5-day cycle — Ch. 22
  • net capacity — Ch. 21
  • net capacity available for the load — Ch. 21
  • Net cash consumption to finish — Ch. 34
  • Net cash provided by operating activities — Ch. 34
  • Net cash used in financing activities — Ch. 34
  • Net cash used in investing activities — Ch. 34
  • Net cost of the set to this job — Ch. 22
  • Net direct cost difference — Ch. 39
  • Net export — Ch. 8
  • Net genuinely unbought scope — Ch. 16
  • NET IDENTIFIED SAVINGS — Ch. 35
  • Net impact to steel erection start — Ch. 8
  • Net income — Ch. 34
  • Net increase in cash — Ch. 34
  • Net payable to Sightline for April — Ch. 5
  • Net position — Ch. 34
  • Net real buyout savings, day 90 — Ch. 16
  • Net slip to steel erection start — Ch. 16
  • nets the most. — Ch. 33
  • network — Ch. 14
  • never — Ch. 23
  • Never — Ch. 26 30
  • Never accept responsibility in your own minutes. — Ch. 26
  • never allowing anyone under a suspended load — Ch. 18
  • Never assert a fact you cannot exhibit. — Ch. 33
  • Never characterize. — Ch. 26
  • never closes — Ch. 37
  • Never conceal. — Ch. 23
  • Never interpolate in your favor. — Ch. 21
  • Never leave a field blank. — Ch. 26
  • Never let a trade start work on a coverage gap. — Ch. 5
  • Never let one method be used for everything. — Ch. 28
  • Never reimbursable — Ch. 4
  • Never ride it while it is moved — Ch. 22
  • Never round down. — Ch. 12
  • Never skip this — Ch. 18
  • Never swing a load over an occupied area. — Ch. 18
  • never transferred, never accepted. — Ch. 22
  • Never transferred. Never accepted. — Ch. 6
  • never typed, always calculated — Ch. 29
  • Never use negative lags. — Ch. 14
  • never zero and never a ceiling. — Ch. 24
  • Never. — Ch. 28
  • new seam at the area line — Ch. 16
  • New workers are at concentrated risk. — Ch. 20
  • next 48 hours. — Ch. 40
  • Next chapter — Ch. 12 13 14 19 20 23 25 28 31 32 33 36 37 38 39 5 7 9
  • Next chapter, — Ch. 16
  • next month. — Ch. 2
  • NFPA 101 — Ch. 10
  • NFPA 70, the National Electrical Code — Ch. 10
  • NFPA 70E — Ch. 10 24
  • NFPA 72 — Ch. 10
  • NFPA 99 — Ch. 10
  • NFPA 99, the Health Care Facilities Code — Ch. 10
  • nine — Ch. 8
  • nine days — Ch. 29
  • nine to one — Ch. 22
  • nine weeks — Ch. 9
  • nineteen minutes — Ch. 24
  • ninety homes a year — Ch. 37
  • NIOSH — Ch. 41
  • nitrogen purge — Ch. 10
  • no activity has reported late yet. — Ch. 20
  • No additional-insured endorsement attached — Ch. 5
  • No adjustment — Ch. 38
  • No assurance. — Ch. 34
  • no buyer — Ch. 37
  • No causation and no mitigation. — Ch. 26
  • no contract with each other — Ch. 3
  • no damage for delay — Ch. 14 6
  • No degree, from the trades. — Ch. 42
  • no differing site conditions clause — Ch. 15
  • No direct cost — Ch. 29
  • No exceptions taken — Ch. 25
  • No impact statements. — Ch. 26
  • No injury — Ch. 29
  • No injury, no first aid, no property damage. — Ch. 26
  • no later than June 14, Year 1 — Ch. 16
  • no later than June 24, Year 1 — Ch. 16
  • no later than March 15 — Ch. 15
  • No measurement. — Ch. 26
  • no money — Ch. 18
  • no more than 2 of 12 — Ch. 39
  • No other dried-in released area was available — Ch. 26
  • No other released work available in Area B — Ch. 26
  • No other released work was available in Area B — Ch. 26
  • no photographs — Ch. 25
  • no prejudice — Ch. 15
  • No recovery day. — Ch. 24
  • No retention with milestone holdback — Ch. 32
  • no row, no draw. — Ch. 6
  • No tag — Ch. 22
  • No time extension — Ch. 29
  • no trade attached — Ch. 7
  • No waiver of subrogation shown — Ch. 5
  • No work performed today. — Ch. 26
  • No work without written authorization. — Ch. 31
  • no-damage-for-delay — Ch. 19 4 5 6
  • no-damage-for-delay clause — Ch. 15 4
  • No-damage-for-delay clauses — Ch. 33
  • No. — Ch. 10 31 33 36
  • nobody can tell which — Ch. 11
  • Nobody chooses the critical path. — Ch. 14
  • Nobody closes their own item. — Ch. 23
  • Nobody gets humiliated in it, ever. — Ch. 41
  • nobody made an arithmetic mistake. — Ch. 12
  • nobody owns hoisting. — Ch. 13
  • Nobody owns it — Ch. 36
  • Nobody owns the interfaces. — Ch. 25
  • nobody proceeds on a verbal — Ch. 41
  • nobody rides. — Ch. 22
  • nobody stands behind or in line with the jack — Ch. 8
  • Noise — Ch. 37
  • Noise and vibration limits — Ch. 38
  • nominal — Ch. 12
  • Non-compensable — Ch. 29
  • Non-compete and non-solicit clauses. — Ch. 42
  • Non-critical work was completed early. — Ch. 30
  • Non-excusable — Ch. 29 33
  • non-excusable — Ch. 30
  • Non-excusable. — Ch. 29
  • Nonconformance procedure — Ch. 23
  • nonconformance report (NCR) — Ch. 23
  • Nonconformance reports (NCRs) — Ch. 26
  • nonconforming work — Ch. 36
  • none — Ch. 40
  • None of it was provable. — Ch. 36
  • None of them decides. — Ch. 39
  • Normal conditions are a management output. — Ch. 20
  • Normalize the topic before you need it. — Ch. 41
  • Northfield Glass Products — Ch. 32
  • Northgate — Ch. 2
  • Northgate Outpatient Pavilion — Ch. 2 21
  • Northgate Outpatient Pavilion. — Ch. 34
  • Northgate, at completion. — Ch. 24
  • not — Ch. 10 13 21 23 24 25 26 27 28 3 33 34 35 37 38 4 40 41 5 6 7
  • Not — Ch. 27 4
  • not a calendar count — Ch. 23
  • Not a certification and not a performance claim. — Ch. 36
  • not a crane until you hang a load from it — Ch. 21
  • Not a general contingency. — Ch. 6
  • Not approved — Ch. 25
  • not equal — Ch. 24
  • Not established. — Ch. 5
  • not finished — Ch. 23
  • not having the building — Ch. 40
  • Not in the estimate — Ch. 7
  • not netted against each other — Ch. 34
  • not one of the four is PPE. — Ch. 24
  • Not one of those is an estimating failure. — Ch. 15
  • NOT READY — Ch. 27
  • Not scheduled — Ch. 40
  • Not scheduled. — Ch. 40
  • not separately paid — Ch. 38
  • Not started — Ch. 40
  • Not submitted. — Ch. 40
  • not the foreman — Ch. 23
  • not today. — Ch. 29
  • not uniform. — Ch. 20
  • not yet agreed — Ch. 33
  • not yet installed — Ch. 32
  • Note. — Ch. 26
  • nothing — Ch. 25
  • Nothing about the project has changed. — Ch. 11
  • Nothing in that ladder changed the building. — Ch. 3
  • nothing in writing about their manpower. — Ch. 19
  • Notice — Ch. 16 31 4
  • notice — Ch. 33
  • notice and claim — Ch. 5
  • Notice first, work second — Ch. 40
  • Notice is not a price. Notice is a flag. — Ch. 31
  • Notice may be a condition precedent. — Ch. 29
  • NOTICE OF CHANGE AND RESERVATION OF RIGHTS — Ch. 31
  • notice periods — Ch. 4
  • notice provision — Ch. 17 26
  • Notice the trap. — Ch. 15
  • Notice to Proceed — Ch. 17
  • Notice to Proceed (NTP) — Ch. 11
  • Notice to the surety — Ch. 19
  • notice within the stated period — Ch. 33
  • Notice, in the form the clause requires. — Ch. 19
  • Notification and traffic control — Ch. 38
  • notify — Ch. 23
  • Notify in writing, today — Ch. 38
  • Nov 4 — Ch. 32
  • November 12, Year 1 — Ch. 10 16
  • November 2, Year 1 — Ch. 25
  • November 20, Year 1 — Ch. 16
  • November 22, Year 1 — Ch. 25
  • November 27, Year 1 — Ch. 25
  • November 30, Year 1 — Ch. 28
  • November 4 — Ch. 32
  • now — Ch. 25 26
  • Now — Ch. 9
  • Now add the schedule, which is the whole point. — Ch. 21
  • Now apply the hierarchy. — Ch. 24
  • Now connect it to this chapter. — Ch. 9
  • Now do one thing. — Ch. 33
  • Now pay both bids at actual quantities — Ch. 4
  • Now read the difference between C, D, and F. — Ch. 14
  • Now read the result, because this is the lesson. — Ch. 12
  • Now the four calculations, in order. — Ch. 34
  • Now the hedging, and I mean it. — Ch. 42
  • Now the honest accuracy discussion — Ch. 39
  • Now the honest limits — Ch. 24
  • Now the trap on the fill side. — Ch. 12
  • NTP — Ch. 17
  • nuclear density gauge — Ch. 8
  • Number four is real, and it is last for a reason. — Ch. 19
  • Number of activities with no predecessor — Ch. 14
  • Number of activities with no successor — Ch. 14
  • Number of constrained activities — Ch. 14
  • number or date — Ch. 26
  • Numbers from this chapter worth carrying. — Ch. 16
  • O&M manuals — Ch. 40
  • OAC meeting — Ch. 26 37
  • Obeya — Ch. 27
  • obligee — Ch. 5
  • observe, measure, coordinate, or document — Ch. 39
  • Observed condition — Ch. 25
  • occupy and use the work for its intended purpose — Ch. 4
  • OCIP — Ch. 5
  • Oct 1 — Ch. 40
  • Oct 11, Year 2 — Ch. 29
  • Oct 2 — Ch. 32
  • Oct 25 — Ch. 32
  • Oct 9, Year 2 — Ch. 10
  • October 1 — Ch. 40
  • October 1 of Year 2 — Ch. 3
  • October 1 of Year 2. — Ch. 2
  • October 1, Year 2 — Ch. 11 14 15 19 24 29 41 8
  • October 11, Year 2 — Ch. 14 29
  • October 15 — Ch. 32
  • October 2, Year 2 — Ch. 40
  • October 25, Year 1 — Ch. 32
  • October 7 — Ch. 33
  • Odessa Pruitt — Ch. 21
  • of the pursuit — Ch. 15
  • off — Ch. 39
  • Off-hours and weekend work — Ch. 16
  • off-site date — Ch. 21
  • office ladder — Ch. 42
  • offset lines — Ch. 18
  • OKONKWO — Ch. 42
  • on or before — Ch. 5
  • on the clock. — Ch. 20
  • on the critical path — Ch. 31
  • on the platform — Ch. 24
  • On the sheet, with the other numbers. — Ch. 29
  • on the work. — Ch. 20
  • on this job — Ch. 24
  • on top of the face of the WRB — Ch. 9
  • on-site date — Ch. 21
  • On-site reuse documentation — Ch. 36
  • On-site solar (photovoltaics). — Ch. 36
  • Once — Ch. 23
  • once in twenty-two weeks. — Ch. 27
  • one — Ch. 16 24 41
  • one 90-ton crane — Ch. 18
  • One additional week of dewatering — Ch. 22
  • One calculation before you file it. — Ch. 26
  • One commitment. — Ch. 15
  • One controlled set, stamped. — Ch. 7
  • one credible removal — Ch. 41
  • one crew — Ch. 37
  • one hoist — Ch. 18
  • one in five — Ch. 2
  • one in six — Ch. 15
  • one material/personnel hoist — Ch. 18
  • One more thing worth noticing. — Ch. 4
  • One multi-party agreement. — Ch. 3
  • One named person owns the interface — Ch. 18
  • One owner. — Ch. 25
  • one paragraph — Ch. 11
  • one paragraph naming the binding constraint — Ch. 17
  • One paragraph on what you would get wrong. — Ch. 37
  • one period behind — Ch. 32
  • One person touches the summary. — Ch. 13
  • One physical area. — Ch. 14
  • One point of contact — Ch. 37
  • one portable unit per 10 workers, serviced weekly — Ch. 18
  • One responsible party. — Ch. 14
  • One scope, one project, one defined boundary. — Ch. 39
  • one sentence — Ch. 3
  • one specific risk you are accepting. — Ch. 3
  • One street frontage only — Ch. 17
  • one third to one half — Ch. 34
  • One ticket per day per change — Ch. 26
  • one truck at a time — Ch. 18
  • One type of work. — Ch. 14
  • One version per phase, minimum. — Ch. 18
  • one week of units — Ch. 18
  • One whole elevation, slab edge to roof. — Ch. 27
  • one written notice and 24 hours — Ch. 18
  • one year — Ch. 5
  • one zone — Ch. 9
  • one-house buffer — Ch. 37
  • One. — Ch. 17 22 32 36 39 5
  • ongoing — Ch. 5
  • ongoing operations — Ch. 5
  • only — Ch. 40
  • Only a 4D model. — Ch. 35
  • only at the boring locations on the dates drilled — Ch. 38
  • only if — Ch. 32 5
  • Only Item 2 triggers it. — Ch. 38
  • Only the CPM measures time. — Ch. 30
  • Only then — Ch. 20
  • only to the varied portion — Ch. 38
  • open — Ch. 41
  • Open ends — Ch. 14
  • open ends — Ch. 14
  • opening conference — Ch. 24
  • Operated and maintained (O&M) — Ch. 21
  • operating — Ch. 31
  • Operating activities — Ch. 34
  • Operating cost — Ch. 13
  • operating layer — Ch. 18
  • operating lease — Ch. 21
  • Operating subtotal — Ch. 13
  • Operating total, with operator — Ch. 21
  • operation — Ch. 28
  • Operational carbon — Ch. 36
  • Operational limits — Ch. 39
  • Operations and maintenance data — Ch. 25
  • Operations executive (VP of operations) — Ch. 42
  • Operator certification — Ch. 39
  • Operator cost — Ch. 13
  • Opportunity for the owner to investigate — Ch. 38
  • Optimism bias. — Ch. 6
  • Optimism, and anchoring. — Ch. 28
  • optimum moisture content. — Ch. 8
  • Option A. — Ch. 24
  • Options are a fifth of the margin. — Ch. 37
  • Options presented by Kestrel. — Ch. 26
  • order 536 CY — Ch. 8
  • order of precedence — Ch. 13 4 42 6
  • Order of precedence — Ch. 4
  • Organized in a way that survives interruption. — Ch. 1
  • Orientation and training — Ch. 24
  • Orientation coverage — Ch. 24
  • Original budget — Ch. 28
  • OSHA — Ch. 5
  • OSHA 10 / OSHA 30 — Ch. 42
  • OSHA 10 and 30 — Ch. 42
  • OSHA 30 — Ch. 42
  • OSHA applies to a house. — Ch. 37
  • OSHA-approved state plans — Ch. 24
  • Other-than-serious — Ch. 24
  • OUT — Ch. 25
  • out — Ch. 30
  • out loud in front of the peers who depend on it — Ch. 27
  • out loud, in front of the other trades — Ch. 27
  • Out-of-sequence progress — Ch. 29
  • Out-of-sequence work — Ch. 14 23 31
  • Out-of-sequence work and rework. — Ch. 20
  • out-of-service radius — Ch. 21
  • outboard — Ch. 7
  • outcome — Ch. 36
  • output — Ch. 24
  • outputs of upstream decisions — Ch. 41
  • over — Ch. 37 9
  • over the top of the parapet — Ch. 9
  • Over-billed — Ch. 34
  • Over-billing — Ch. 34
  • over-billings — Ch. 34
  • Over-processes. — Ch. 37
  • Over-processing — Ch. 27
  • over/(under) billing — Ch. 34
  • Overexertion and manual handling. — Ch. 18
  • overhaul — Ch. 38
  • overhead — Ch. 24
  • Overhead power lines. — Ch. 24
  • Overhead work above occupied work. — Ch. 24
  • Overproduction — Ch. 27
  • overrun — Ch. 16
  • Oversail — Ch. 17
  • Oversize and overweight load permits — Ch. 17
  • overstated — Ch. 4
  • Overstates early progress by design. — Ch. 30
  • Overtime hours are a leading indicator. — Ch. 20
  • owed them for it — Ch. 33
  • own — Ch. 5
  • own, rent, lease, or operated rental — Ch. 21
  • owned — Ch. 12
  • Owned — Ch. 21
  • Owner — Ch. 1 27 3 4 6
  • owner — Ch. 17 21 23 24 3 37
  • Owner and site restrictions — Ch. 39
  • owner audit right — Ch. 28
  • Owner audit rights under an open-book GMP. — Ch. 34
  • owner credit — Ch. 23
  • owner decision made before you are hired. — Ch. 36
  • Owner decisions. — Ch. 11
  • Owner involvement required — Ch. 3
  • Owner is really buying — Ch. 4
  • Owner occupancy — Ch. 17
  • Owner or design change — Ch. 27
  • Owner owns the float — Ch. 14
  • Owner reporting and marketing — Ch. 39
  • Owner, unilaterally — Ch. 31
  • Owner-caused delay — Ch. 33 6
  • Owner-Controlled Insurance Program — Ch. 5
  • Owner-directed — Ch. 31
  • Owner-directed change — Ch. 31
  • Owner-engaged laboratory. — Ch. 23
  • owner-furnished — Ch. 11
  • Owner-furnished equipment. — Ch. 11
  • Owner-imposed operational milestones — Ch. 14
  • owner-owned float — Ch. 14
  • Owners — Ch. 39
  • Ownership — Ch. 42
  • Ownership cost — Ch. 13
  • Ownership of the project record. — Ch. 42
  • Ownership subtotal — Ch. 13
  • Owning and operating — Ch. 13
  • P-3 and P-4 — Ch. 29
  • P. Sethi (Meridian Health System) — Ch. 26
  • package — Ch. 30
  • Package size — Ch. 19
  • Packaged — Ch. 31
  • packaged rooftop units — Ch. 21
  • Pad A — Ch. 18
  • paid — Ch. 38
  • paid a higher fee — Ch. 3
  • paid invoice or bill of sale transferring title — Ch. 16
  • paid statistically — Ch. 38
  • Painting of exposed work — Ch. 16
  • Parallel manufacturing. — Ch. 39
  • Parking — Ch. 17
  • parking and drive paving — Ch. 38
  • Parking and gate throughput — Ch. 17
  • part — Ch. 10
  • Part 1926 — Ch. 24
  • Partial / phased substantial completion — Ch. 40
  • partial enclosure release — Ch. 9
  • Partial gap. — Ch. 16
  • partition-type sheet — Ch. 7
  • Partly real, partly deferred. — Ch. 3
  • Partly yours — Ch. 36
  • Partly. — Ch. 24
  • Passive House — Ch. 36
  • passive survivability — Ch. 36
  • Past performance — Ch. 13
  • Patching — Ch. 16
  • path — Ch. 14 37
  • Path B, and it is not close. — Ch. 29
  • Path forward, agreed out loud — Ch. 41
  • Pathway interruption — Ch. 36
  • pattern of ignored complaints — Ch. 18
  • Pay — Ch. 5
  • pay factor — Ch. 38
  • Pay faster. — Ch. 19
  • Pay people correctly and on time. — Ch. 41
  • Pay people on time — Ch. 42
  • Pay them correctly and on time — Ch. 19
  • pay, honestly stated — Ch. 20
  • Pay-if-paid — Ch. 16 32
  • pay-if-paid — Ch. 2 31
  • Pay-if-paid versus pay-when-paid — Ch. 16
  • pay-if-paid versus pay-when-paid — Ch. 5
  • Pay-if-paid vs. pay-when-paid — Ch. 4
  • Pay-when-paid — Ch. 16 31 32
  • pay-when-paid — Ch. 2
  • Payment — Ch. 32
  • payment and performance bonds — Ch. 5
  • payment bond — Ch. 2 5
  • Payment bond — Ch. 5
  • Payment for stored materials — Ch. 16
  • Payment terms — Ch. 16
  • Payment terms. — Ch. 32
  • Payment timing — Ch. 4
  • PE license — Ch. 42
  • Peak volume — Ch. 17
  • Peak. — Ch. 2
  • Pedestrian protection and traffic control. — Ch. 17
  • peers — Ch. 2
  • penal sum — Ch. 15
  • penalty — Ch. 5
  • Penalty maximums are adjusted periodically — Ch. 24
  • Pending 12 days — Ch. 31
  • Pending 27 days — Ch. 31
  • Pending 34 days — Ch. 31
  • Pending changes not carried. — Ch. 28
  • people and hand-carried conductive objects — Ch. 24
  • People who avoid conflict entirely. — Ch. 1
  • People who can be told they are wrong. — Ch. 1
  • People who like buildings. — Ch. 1
  • People who need closure. — Ch. 1
  • People who need to be liked in the moment. — Ch. 1
  • People who think the field works for them. — Ch. 1
  • People who write things down. — Ch. 1
  • People you developed who got promoted — Ch. 42
  • Per available hour — Ch. 21
  • per day — Ch. 24
  • Per diem / travel — Ch. 42
  • Per opening — Ch. 37
  • Per productive pick-hour — Ch. 21
  • per shift — Ch. 29
  • per unit of production — Ch. 21
  • per unit of production per hour — Ch. 38
  • Per week — Ch. 22
  • Per worker per week — Ch. 20
  • Percent complete — Ch. 28 34
  • percent complete — Ch. 34
  • Percent complete (judgment) — Ch. 30
  • Percent of 500 — Ch. 15
  • percent of chart — Ch. 21
  • Percentage fee — Ch. 4
  • Percentage of activities on the critical path — Ch. 14
  • Performance — Ch. 7
  • performance and payment bond — Ch. 16
  • Performance bond — Ch. 5 6
  • performance mockup — Ch. 16
  • performance obligations are satisfied — Ch. 34
  • Performance path — Ch. 36
  • performance path. — Ch. 36
  • performance requirement — Ch. 25
  • Performance testing — Ch. 23
  • performed — Ch. 30
  • Period — Ch. 33
  • period by period — Ch. 33
  • permanent lateral system — Ch. 22
  • Permanent power energization — Ch. 40
  • Permanent services — Ch. 17
  • Permeable paving — Ch. 36
  • Permissibility varies enormously by jurisdiction — Ch. 36
  • Permit closeouts — Ch. 40
  • Permit matrix — Ch. 17
  • permit matrix — Ch. 17
  • Permits and fees — Ch. 13 6
  • Permits and inspections — Ch. 27
  • permits pulled by trades — Ch. 17
  • Permits. — Ch. 11
  • Permitting delay — Ch. 6
  • Permitting strategy — Ch. 11
  • personal diary — Ch. 26
  • personal indemnity — Ch. 34
  • Personnel hoist — Ch. 21
  • persuade a person who was not there. — Ch. 33
  • Perverse. — Ch. 4
  • Pets and children — Ch. 37
  • PF is 0.973 but the labor CPI is 0.950 — Ch. 30
  • Phantom equity / stock appreciation rights — Ch. 42
  • phantom float in everything upstream of it — Ch. 14
  • phase — Ch. 14
  • phase pull plan — Ch. 27
  • Phased turnover — Ch. 14
  • Phased turnover means phased everything — Ch. 18
  • Phone call — Ch. 26
  • photogrammetry — Ch. 35
  • Photogrammetry — Ch. 39
  • Photograph adjacent property before you begin. — Ch. 26
  • Photograph and measure. — Ch. 23
  • Photograph everything before it is covered. — Ch. 9
  • photographs — Ch. 25
  • Photographs — Ch. 26
  • Photographs attached to a location and a date — Ch. 39
  • Photographs do not exist. — Ch. 36
  • physical — Ch. 23
  • Physical fatigue — Ch. 20
  • Physical interference — Ch. 19
  • physical limits — Ch. 21
  • pick schedule — Ch. 21
  • Pick the topic from the schedule. — Ch. 24
  • Piece-rate pay — Ch. 37
  • Pipe bursting / lining — Ch. 38
  • Pipe jacking / microtunneling — Ch. 38
  • Pipelines and underground utility — Ch. 38
  • PLA — Ch. 20
  • Placement duration — Ch. 21
  • placement rate and lift height — Ch. 22
  • plan — Ch. 35
  • Plan — Ch. 7
  • plan north — Ch. 7
  • plan quantity — Ch. 38
  • Plan quantity versus measured quantity. — Ch. 38
  • Plan review and revision log — Ch. 24
  • plan width check — Ch. 10
  • PlanGrid — Ch. 39
  • planholder — Ch. 15
  • Planned value (PV) — Ch. 30
  • planning — Ch. 23
  • Planning — Ch. 25
  • plastic shrinkage cracking — Ch. 8
  • Platform — Ch. 22
  • platform framing — Ch. 8
  • Platforms. — Ch. 22
  • plug — Ch. 15
  • plug number — Ch. 13
  • plumbing — Ch. 10
  • Plumbing — Ch. 35
  • plumbs — Ch. 8
  • plus — Ch. 29 33
  • plus a named, quantified allowance. — Ch. 12
  • plus a realistic allowance for one resubmittal — Ch. 25
  • plus accruals — Ch. 28
  • plus approved change orders — Ch. 34
  • plus data — Ch. 35
  • PMP — Ch. 42
  • point cloud — Ch. 39
  • point type — Ch. 23
  • ponding — Ch. 22
  • pool — Ch. 42
  • Poor billing discipline — Ch. 34
  • portable — Ch. 20
  • Ports and marine — Ch. 38
  • Position — Ch. 41
  • Position. — Ch. 31
  • Positional authority — Ch. 41
  • positive — Ch. 10
  • Positive communication before movement — Ch. 21
  • Positive-side versus negative-side. — Ch. 9
  • Post-occupancy damage by others. — Ch. 9
  • post-tensioned (PT) slab — Ch. 8
  • Post-tensioning — Ch. 38
  • Potholing ahead of the crew — Ch. 38
  • pounds-per-cubic-yard factor. — Ch. 12
  • Pour and it goes wrong — Ch. 18
  • Pre-action — Ch. 10
  • Pre-bid meeting and site visit — Ch. 15
  • pre-bid RFI and an addendum — Ch. 12
  • Pre-blast survey — Ch. 38
  • pre-construction condition survey — Ch. 22
  • Pre-construction condition surveys. — Ch. 17
  • Pre-drywall air sealing and insulation contact — Ch. 37
  • Pre-inspect before you call. — Ch. 10
  • Pre-inspect with your own people first. — Ch. 9
  • pre-installation conference — Ch. 23
  • Pre-installation conference — Ch. 26
  • Pre-installation conference schedule — Ch. 23
  • Pre-lift / critical lift meeting — Ch. 26
  • pre-mobilization meeting — Ch. 19
  • Pre-pour meeting — Ch. 26
  • pre-pour walk — Ch. 10
  • Pre-stage board on level 2 before the crush. — Ch. 18
  • pre-task plan (PTP) — Ch. 24
  • Pre-task plan and toolbox talk — Ch. 24
  • Pre-task plan completion — Ch. 24
  • Precast concrete — Ch. 8
  • Precast concrete. — Ch. 22
  • Precast girder erection — Ch. 38
  • precaution class — Ch. 18
  • Precedence analysis — Ch. 7
  • precision illusion. — Ch. 12
  • Preconditions before you open your mouth. — Ch. 41
  • Preconstruction / buyout phase — Ch. 37
  • Preconstruction meeting — Ch. 17 26
  • Preconstruction services — Ch. 11
  • Predict and price change — Ch. 14
  • predictable schedules — Ch. 20
  • Predictive analytics on safety and quality data — Ch. 39
  • predominant purpose — Ch. 16
  • Prefunctional checklists — Ch. 40
  • preinstallation conference — Ch. 25
  • Preparatory work — Ch. 20
  • Prepare the two-minute close. — Ch. 15
  • Prequalification — Ch. 11 16 2 5
  • Prequalification is a safety program. — Ch. 16
  • Prequalification thresholds — Ch. 19
  • Prequalify on the right things. — Ch. 19
  • prerequisite — Ch. 36
  • Prerequisite work (21). — Ch. 27
  • Prerequisite work complete — Ch. 27
  • Prerequisite work not complete — Ch. 27
  • Prescriptive (descriptive) — Ch. 7
  • Prescriptive path — Ch. 36
  • Present. — Ch. 37
  • president or chief operating officer — Ch. 42
  • pressure — Ch. 21
  • Pressure class. — Ch. 10
  • Pressure relationships — Ch. 10 40
  • Pressure relationships. — Ch. 10
  • Pressuring a crew — Ch. 24
  • Prevailing wage — Ch. 1 5
  • Prevailing wage pushes labor cost up. — Ch. 2
  • Prevailing wage. — Ch. 38
  • prevailing-wage — Ch. 20
  • prevailing-wage law — Ch. 20
  • Prevention — Ch. 23
  • Preventive maintenance on a schedule — Ch. 21
  • Pri Sethi — Ch. 1
  • Pri Sethi, Meridian — Ch. 25
  • price — Ch. 15 19
  • Price certainty, and when you get it — Ch. 3
  • Price discovery is real. — Ch. 3
  • price idle time honestly. — Ch. 12
  • Price is hard to test. — Ch. 3
  • price list — Ch. 37
  • price mobilization separately and explicitly. — Ch. 12
  • price risk in an estimate — Ch. 20
  • Price to the owner — Ch. 31
  • price-escalation clause — Ch. 11
  • Price-hold periods — Ch. 4
  • priced — Ch. 13
  • priced scope. — Ch. 12
  • Priced subtotal — Ch. 18
  • Priced value of the substantiated work — Ch. 31
  • prices — Ch. 15
  • Pricing method — Ch. 31
  • primary and non-contributory — Ch. 5
  • Primavera P6 — Ch. 14
  • Prime — Ch. 9
  • principal — Ch. 5
  • print the card — Ch. 41
  • Print the summary and check it against paper. — Ch. 13
  • priority decision — Ch. 41
  • Privacy — Ch. 33
  • Privacy and neighbor relations — Ch. 39
  • Private — Ch. 41
  • private — Ch. 5
  • Private invited bid — Ch. 15
  • Private invited bid. — Ch. 15
  • Private owner — Ch. 2
  • private owner — Ch. 2
  • Priyanka Sethi — Ch. 4
  • pro forma — Ch. 11 2
  • Proceed promptly. — Ch. 31
  • process — Ch. 35
  • Procore — Ch. 39
  • Proctor test — Ch. 8
  • Procurement and submittal log — Ch. 17
  • procurement branch — Ch. 14
  • procurement chain — Ch. 14
  • procurement criterion. — Ch. 36
  • produce a list of work that is genuinely ready — Ch. 27
  • Produce five documents. — Ch. 36
  • Produce five things. — Ch. 38
  • Producing foremen — Ch. 42
  • producing things — Ch. 41
  • product — Ch. 36
  • Product data — Ch. 25
  • Product documentation is never collected. — Ch. 36
  • Production — Ch. 21
  • production — Ch. 21 30 38 39
  • Production / tract — Ch. 37
  • production arithmetic — Ch. 21
  • Production is below the estimate — Ch. 21
  • production rate — Ch. 12
  • Production rate — Ch. 20
  • productive — Ch. 29
  • Productive struggle. — Ch. 1 10 11 12 14 15 16 17 19 2 20 21 22 23 24 25 26 27 28 3 30 31 32 33 34 35 36 37 38 4 40 41 42 5 6 7 8 9
  • Productivity — Ch. 20 6
  • Productivity computed weekly by cost code. — Ch. 28
  • Productivity factor — Ch. 20
  • productivity factor — Ch. 30
  • Productivity is the only one that is a prediction — Ch. 13
  • productivity or utilization — Ch. 21
  • Productivity rate assumed clear access — Ch. 12
  • Productivity variance — Ch. 20
  • Professional liability — Ch. 5
  • professional standard of care — Ch. 3
  • Profit is an accounting opinion about the future — Ch. 32
  • Profit on changed work — Ch. 33
  • Profit sharing — Ch. 42
  • Profit. — Ch. 4
  • program — Ch. 34
  • Programmed / emphasis — Ch. 24
  • Progress — Ch. 32 5
  • Progress documentation — Ch. 39
  • Progress override — Ch. 29
  • Progress override. — Ch. 29
  • progress payment — Ch. 32
  • Progress this period — Ch. 29
  • Progressive and final cleaning — Ch. 13
  • Progressive design-build. — Ch. 3
  • Progressive verification — Ch. 39
  • prohibited — Ch. 21
  • Project — Ch. 30
  • Project accountant — Ch. 1
  • Project bonus — Ch. 42
  • project buffer — Ch. 14
  • project charter — Ch. 2
  • project controls — Ch. 27
  • Project controls / scheduler — Ch. 1
  • Project controls do not control anything. — Ch. 28
  • project data sheet — Ch. 42
  • Project directory — Ch. 17
  • Project executive / operations manager — Ch. 42
  • project float — Ch. 14
  • Project float in the baseline — Ch. 14
  • Project manager — Ch. 1
  • Project manager (PM) — Ch. 42
  • Project manager (Ray) — Ch. 18
  • Project manager versus superintendent. — Ch. 1
  • project manual — Ch. 15 7
  • project record — Ch. 26
  • Project staff — Ch. 13
  • Project total — Ch. 30
  • Project, location — Ch. 23
  • project-controls instrument — Ch. 41
  • Projected net profit on Northgate — Ch. 2
  • prompt — Ch. 24
  • prompt written notice — Ch. 15
  • Prompt written notice — Ch. 38
  • Prompt-payment statutes — Ch. 32
  • promptly report — Ch. 7
  • proof — Ch. 15
  • Proof the condition caused increased cost or time — Ch. 38
  • Property-line verification — Ch. 17
  • Proposal Request — Ch. 25
  • Proposed disposition — Ch. 23
  • Proposed resolution — Ch. 7
  • proposed resolution — Ch. 7
  • proposes a resolution with a reason — Ch. 25
  • proposes an answer — Ch. 7
  • prospective — Ch. 29
  • protect water first. — Ch. 9
  • Protected species and habitat — Ch. 38
  • protected time — Ch. 27
  • Protection of installed work — Ch. 18
  • protects workers — Ch. 22
  • prototype — Ch. 37
  • Prove entitlement — Ch. 14
  • Prove the work fits — Ch. 14
  • Proving the work fits in the time. — Ch. 27
  • Proximate — Ch. 24
  • proximity warning around heavy equipment — Ch. 39
  • PSP — Ch. 42
  • Public accountability generally. — Ch. 38
  • Public agency — Ch. 42
  • Public hard bid — Ch. 15
  • Public opening — Ch. 15
  • Public owner — Ch. 2
  • public owner — Ch. 2
  • Public procurement law often forbids it outright — Ch. 3
  • Public record — Ch. 33
  • Public-private partnerships (P3) — Ch. 3
  • Publish a ball-in-court report weekly — Ch. 25
  • Publish what was learned — Ch. 39
  • Pull — Ch. 27
  • pull — Ch. 27
  • Pull planning session — Ch. 26
  • pump truck — Ch. 18
  • Punch item — Ch. 23 40
  • Punch labor — Ch. 16
  • Punched window head, jamb, and sill — Ch. 9
  • punching by area at every trade handoff — Ch. 40
  • punishment — Ch. 4
  • Purchase consumes working capital. — Ch. 22
  • purchase order — Ch. 16
  • purchasing — Ch. 36
  • Purpose — Ch. 24
  • Pursuant to the notice provisions of the contract — Ch. 26
  • Pursue — Ch. 15
  • Pursue formally. — Ch. 33
  • Push — Ch. 27
  • Push for partial or interim approvals — Ch. 31
  • Put the float report next to it. — Ch. 30
  • puts schedule and cost on the record — Ch. 7
  • PV curve — Ch. 30
  • PVC — Ch. 9
  • QBS / best value — Ch. 15
  • qualifications alone — Ch. 3
  • qualifications and assumptions page — Ch. 11
  • Qualifications and clarifications — Ch. 11
  • QUALIFICATIONS AND CLARIFICATIONS — Ch. 15
  • Qualifications and Clarifications. — Ch. 15
  • qualifications page — Ch. 15
  • Qualifications-based selection. — Ch. 15
  • qualified person — Ch. 24
  • Quality — Ch. 42
  • Quality and inspections. — Ch. 37
  • Quality Assurance — Ch. 7
  • quality assurance — Ch. 7
  • Quality assurance (QA) — Ch. 23
  • Quality control (QC) — Ch. 23
  • Quality control and testing — Ch. 13
  • Quality control. — Ch. 39
  • Quality is conformance to the contract documents. — Ch. 23
  • Quality is not inspection. — Ch. 23
  • quality management plan — Ch. 23
  • Quality plan / inspection and test plan — Ch. 17
  • quantifies — Ch. 23
  • quantifies the impact without threatening — Ch. 25
  • Quantities — Ch. 12
  • quantities — Ch. 25
  • Quantities installed — Ch. 26
  • Quantity — Ch. 20
  • quantity — Ch. 38
  • Quantity and extent affected — Ch. 23
  • Quantity remaining. — Ch. 28
  • quantity takeoff — Ch. 12
  • Quantity variation — Ch. 6
  • Quantity variation clause — Ch. 38
  • quantity variation clause — Ch. 38
  • quantum — Ch. 33
  • quench vent — Ch. 10
  • Question — Ch. 25
  • Question period — Ch. 15
  • question period — Ch. 15
  • Question. — Ch. 7
  • queuing — Ch. 37
  • Quick ratio — Ch. 34
  • R-13 — Ch. 6
  • R-15 — Ch. 22
  • R-15 continuous — Ch. 7
  • R-27 — Ch. 36
  • R-27 nominal — Ch. 36
  • R-value — Ch. 7
  • radius — Ch. 21
  • Rail and transit — Ch. 38
  • rainscreen — Ch. 9
  • Rainscreen panel — Ch. 9
  • raise the tip elevation — Ch. 38
  • raising gang — Ch. 14
  • Rakers — Ch. 22
  • raking shores — Ch. 22
  • Ran 39 CD against a 30 CD duration. — Ch. 29
  • random process controlled by the agency — Ch. 38
  • Rank leveled — Ch. 13
  • Rapid or unbalanced placement — Ch. 22
  • Rarely — Ch. 5
  • Rate — Ch. 18 20
  • rate — Ch. 30 37 38
  • rate mismatch — Ch. 37
  • Rate of placement. — Ch. 22
  • Rate or price change — Ch. 21
  • Rate variance — Ch. 20
  • rating — Ch. 7
  • Rating system — Ch. 36
  • ratio — Ch. 20
  • Raw clash counts are noise. — Ch. 10 35
  • Ray Alvarez — Ch. 28
  • Ray named his own weakness before Pri found it. — Ch. 31
  • **rchitectural, ** — Ch. 7
  • Re-commissioning — Ch. 40
  • re-estimate the remaining work from scratch — Ch. 28
  • Re-inspection requested for 4/18. — Ch. 26
  • Re-orient after a long absence — Ch. 24
  • re-tagged — Ch. 24
  • Read 01 77 00 before you assume. — Ch. 40
  • Read Division 01 first and completely. — Ch. 7
  • Read every one. — Ch. 25
  • read it, and object in writing immediately — Ch. 16
  • Read the table. — Ch. 33
  • Read these first. — Ch. 4
  • Read your actual contract. — Ch. 4
  • Read your agreement. — Ch. 40
  • Read yours. — Ch. 25
  • Reading a productivity factor — Ch. 20
  • reading is several times faster than listening — Ch. 26
  • READY — Ch. 27
  • ready — Ch. 27 37
  • Ready-mix arrives every 12 minutes. — Ch. 18
  • real apprenticeship — Ch. 20
  • Real cost. — Ch. 3
  • Real deployments, — Ch. 39
  • Real equity — Ch. 42
  • Real multi-trade coordination. — Ch. 35
  • Real savings to the owner. — Ch. 3
  • REAL VE — Ch. 11
  • real-estate purchase agreement — Ch. 37
  • reality capture — Ch. 26
  • Reality capture — Ch. 39
  • Reasonable assurance. — Ch. 34
  • reasonable care — Ch. 24
  • reasonable certainty — Ch. 33
  • rebar and anchor-bolt inspection — Ch. 8
  • Rebar shop drawings and placing drawings — Ch. 8
  • Rebar tying robot — Ch. 39
  • Rebar, embed, and sleeve deliveries compress. — Ch. 22
  • Rebuild the rate on the actual quantity — Ch. 38
  • Recalculate after every step. — Ch. 29
  • recalculating after every step — Ch. 29
  • Recall your project. — Ch. 4
  • receipts curve — Ch. 32
  • Receiving and inspection. — Ch. 18
  • Recipient and copies — Ch. 33
  • recirculation — Ch. 10
  • recognized hazards — Ch. 24
  • Recommendation to Nadia. — Ch. 2
  • Recommended award — Ch. 16
  • Reconcile against the previous estimate. — Ch. 13
  • reconciled against actual cost — Ch. 4
  • Reconstruction is not proof. — Ch. 31
  • Record — Ch. 23
  • record — Ch. 24 29 41
  • Record (as-built) drawings — Ch. 40
  • Record drawings — Ch. 25
  • record drawings — Ch. 7
  • record-creating instrument — Ch. 26
  • Recording a lien proves nothing about the merits. — Ch. 5
  • recordings — Ch. 40
  • Records. — Ch. 31
  • Recover stranded fixed cost only — Ch. 38
  • Recovery — Ch. 29
  • Recovery actions — Ch. 29
  • recovery schedule — Ch. 29
  • Recruiters, honestly used. — Ch. 42
  • Recycled content — Ch. 36
  • RED — Ch. 22
  • Reduce or restructure the bond-back requirement. — Ch. 19
  • Reduce the load. — Ch. 21
  • Reduce the radius. — Ch. 21
  • reduced — Ch. 4
  • reduced scope — Ch. 35
  • reduced subcontract value — Ch. 16
  • reduces extrusion lead time by 3 weeks — Ch. 16
  • reduction — Ch. 40
  • Redundancy where the operation is critical. — Ch. 21
  • reference building — Ch. 36
  • Reference standard — Ch. 7
  • Reference the clause. — Ch. 26
  • References — Ch. 25
  • references — Ch. 7
  • Referral — Ch. 24
  • refinancing — Ch. 40
  • reflected ceiling plans — Ch. 7
  • Refrigerant volume and piping grow — Ch. 36
  • Refusing reasonable impact costs on principle. — Ch. 31
  • Regional or local sourcing — Ch. 36
  • Regional Priority — Ch. 36
  • Regional variation is enormous. — Ch. 42
  • registered apprentice — Ch. 20
  • Regulation — Ch. 5
  • Regulatory floor — Ch. 24
  • Regulatory or code interpretation — Ch. 31
  • Regulatory requirements — Ch. 25
  • Rehearse with a hostile panel — Ch. 15
  • reinforcement — Ch. 8
  • Reinforcing and grout. — Ch. 8
  • Reinforcing steel placing drawings. — Ch. 25
  • REJECT — Ch. 11
  • Reject — Ch. 16
  • Reject and replace — Ch. 23
  • Reject. — Ch. 10
  • Rejected — Ch. 25
  • REJECTED TOTAL (5 items) — Ch. 11
  • REJECTED. — Ch. 26
  • Rejected. — Ch. 26
  • Relational credibility — Ch. 41
  • relationship — Ch. 38
  • relationship problem — Ch. 14
  • Relationship types. — Ch. 14
  • Release / approval gate — Ch. 25
  • Release for stripping / reshore removal — Ch. 23
  • Release subcontractor retention as scopes finish — Ch. 32
  • release the difference promptly. — Ch. 19
  • releases in writing — Ch. 23
  • reliability chain — Ch. 37
  • Reliability credibility — Ch. 41
  • reliability credibility — Ch. 41
  • reliance — Ch. 34
  • Relocation — Ch. 42
  • Relocation repayment — Ch. 42
  • Relocations and conflicts — Ch. 17
  • Remaining cost to complete — Ch. 34
  • remaining duration in days, from the data date — Ch. 29
  • remaining duration, not elapsed duration. — Ch. 29
  • Remaining durations — Ch. 29
  • remaining durations — Ch. 29
  • Remaining to bill — Ch. 34
  • Remaining, attributable to the 23 owner changes — Ch. 31
  • Remedy — Ch. 40
  • Remobilization — Ch. 31
  • Remodel / renovation — Ch. 37
  • Remote sites — Ch. 18
  • Remove and replace — Ch. 36
  • removed — Ch. 22
  • removed and replaced — Ch. 38
  • removed from the plan — Ch. 27
  • Removed. — Ch. 27
  • removes — Ch. 39
  • removing contingency — Ch. 11
  • Removing shores — Ch. 22
  • Removing side forms — Ch. 22
  • removing the cause — Ch. 37
  • Removing the reasons people stand still. — Ch. 19
  • rental — Ch. 21
  • Rental clocks run on calendar time, not on use. — Ch. 22
  • Rental invoice — Ch. 21
  • rental purchase option (RPO) — Ch. 21
  • rented — Ch. 12
  • Repair — Ch. 23
  • Repair the ranked list — Ch. 36
  • Repeat — Ch. 24
  • repeat, sophisticated owner — Ch. 3
  • Repeatability Assumption — Ch. 39
  • Repetition and a learning curve. — Ch. 39
  • replacement work — Ch. 33
  • reply all — Ch. 25
  • report bad news early, in writing, with a plan. — Ch. 26
  • reporting — Ch. 34
  • Reporting obligations run to you, on a clock. — Ch. 24
  • reports go up — Ch. 24
  • Reputation with everyone that customer talks to — Ch. 37
  • Request direction. — Ch. 26
  • request for information — Ch. 1
  • Request for Information — Ch. 25
  • Request for Proposal — Ch. 15
  • Request for Qualifications — Ch. 15
  • Request substitution approval after the fact — Ch. 36
  • requested a time extension — Ch. 29
  • requested today — Ch. 40
  • requested window — Ch. 18
  • requests for information — Ch. 26
  • required — Ch. 29
  • Required approvals — Ch. 23
  • required by the contract — Ch. 33
  • Required of others — Ch. 29
  • Required on site — Ch. 25
  • Required training by activity — Ch. 24
  • required-on-site date — Ch. 25
  • Requiring uncompensated acceleration. — Ch. 19
  • Rescue — Ch. 24
  • rescue attempt by a coworker — Ch. 24
  • rescue plan — Ch. 24
  • Resequencing — Ch. 29
  • Reservation — Ch. 31
  • reservation — Ch. 33
  • reservation of rights — Ch. 31
  • Reservation. — Ch. 31
  • Reserve your rights — Ch. 26
  • Reshores are snugged, not jacked. — Ch. 22
  • Reshoring. — Ch. 22
  • resident engineer — Ch. 38
  • Residential — Ch. 2
  • residual value — Ch. 22
  • Residual value is a forecast, not a fact. — Ch. 22
  • Resilience — Ch. 36
  • resolve if convenient / route elsewhere — Ch. 35
  • resource — Ch. 14
  • resource histogram — Ch. 14
  • Resource leveling — Ch. 14
  • Resource loading — Ch. 14
  • Resource logic — Ch. 14
  • resource-driven — Ch. 14
  • respect expressed as process — Ch. 20
  • respirable crystalline silica — Ch. 36
  • Respond as a manager, not a clinician. — Ch. 41
  • response times in days — Ch. 17
  • Responsibility — Ch. 15
  • Responsibility matrix — Ch. 23
  • responsible — Ch. 15
  • Responsible bidder criteria — Ch. 5
  • Responsive — Ch. 15
  • responsive and responsible — Ch. 15
  • responsive, responsible — Ch. 3
  • Responsiveness — Ch. 15
  • restricted zone — Ch. 22
  • Restroom tile samples — Ch. 25
  • Retainage — Ch. 32
  • Retained logic — Ch. 29
  • retained logic or progress override — Ch. 29
  • Retained logic. — Ch. 29
  • retained physical reference — Ch. 23
  • Retention — Ch. 16 19 26 32 4
  • retention — Ch. 34
  • Retention appears twice, on both sides. — Ch. 34
  • Retention bond — Ch. 32
  • Retention flows down. — Ch. 32
  • Retention is at its maximum — Ch. 32
  • Retention is withheld. — Ch. 2
  • Retention is your problem. — Ch. 20
  • Retention payable — Ch. 34
  • Retest — Ch. 36
  • retesting — Ch. 36
  • Retirement and health — Ch. 42
  • retiring uncertainty — Ch. 11
  • Retro-commissioning — Ch. 40
  • return condition — Ch. 21
  • Return on equity — Ch. 34
  • Returning this week. — Ch. 25
  • Revenue earned to date — Ch. 34
  • revenue earned to date — Ch. 34
  • Revenue earned to date. — Ch. 34
  • Revenue per employee — Ch. 34
  • reverse lap — Ch. 9
  • Reverse-engineered models — Ch. 35
  • Review — Ch. 34
  • Review and certification take time. — Ch. 2
  • Review point (R) — Ch. 23
  • review-and-report obligation — Ch. 6
  • reviewed — Ch. 16
  • Reviewed — Ch. 25
  • Reviewer preference — Ch. 25
  • Revise and Resubmit — Ch. 1 25
  • Revise and resubmit — Ch. 25
  • Revised drawing / reissued sheet — Ch. 25
  • revision block — Ch. 7
  • Rework — Ch. 18 23
  • rework — Ch. 23
  • Rework and damage — Ch. 19
  • Rework and damage. — Ch. 18
  • Rework has nowhere to go. — Ch. 22
  • Rewrites. — Ch. 26
  • RFI — Ch. 1 19 25
  • RFI 112 — Ch. 25 26
  • RFI 214 — Ch. 27
  • RFI 219 — Ch. 27
  • RFI 221 — Ch. 27
  • RFI 221 is unanswered — Ch. 27
  • RFI process — Ch. 37
  • RFI response — Ch. 7
  • RFIs — Ch. 3
  • Ridgeline Gypsum Supply — Ch. 5
  • rigging and suspended-load operation — Ch. 39
  • right — Ch. 1
  • right of access — Ch. 16
  • right to left — Ch. 27
  • right-to-cure — Ch. 37
  • Rights reserved. — Ch. 26
  • rises at GMP conversion — Ch. 3
  • Rising means cut, falling means fill. — Ch. 38
  • risk — Ch. 1 6 7
  • Risk — Ch. 6
  • Risk allocation. — Ch. 37
  • Risk flows down the pyramid — Ch. 2
  • risk group of the adjacent patient population — Ch. 18
  • risk management under uncertainty — Ch. 1
  • risk management under uncertainty. — Ch. 1
  • Risk moves, not work. — Ch. 3
  • risk register — Ch. 2
  • Risks and issues — Ch. 26
  • robotic total station — Ch. 35
  • Rock excavation — Ch. 38
  • Roddy Vance — Ch. 19
  • Roles, responsibilities, and authority — Ch. 24
  • rolling documentation file — Ch. 36
  • Roof and facade inspection — Ch. 39
  • Roof trusses — Ch. 37
  • Roof warranty. — Ch. 36
  • roofing — Ch. 24
  • roofing and structural — Ch. 36
  • rooftop air-handling units and chillers — Ch. 11
  • Room names, numbers, and finish assignments — Ch. 7
  • Root cause — Ch. 23
  • Rotate. — Ch. 41
  • Rough-terrain (RT) crane — Ch. 21
  • roughly 1 in 5 — Ch. 24
  • round down — Ch. 27
  • Round-trip cycle — Ch. 21
  • Rounded and submitted — Ch. 12
  • Rounds converge, and you can measure it. — Ch. 10
  • Route width. — Ch. 18
  • routing conflicts — Ch. 35
  • routing-priority convention — Ch. 35
  • RSMeans — Ch. 11
  • Ruben Ostrowski — Ch. 21
  • Run a clean, safe, organized site. — Ch. 41
  • Run both checks — Ch. 10
  • Run the update both ways once a quarter. — Ch. 29
  • Rung 3 — Ch. 19
  • Rung 3 and rung 4 are where the value is today. — Ch. 35
  • S corporation — Ch. 34
  • S-curve — Ch. 14
  • Sable Ridge — Ch. 34
  • Safety — Ch. 11 16 26 42 6
  • safety — Ch. 20 41 6
  • Safety alert. — Ch. 1 10 12 13 14 15 17 18 19 2 20 23 24 27 29 30 31 32 34 35 37 38 39 4 40 5 6 7 9
  • Safety director — Ch. 1
  • safety envelope — Ch. 21
  • Safety expectations — Ch. 17
  • Safety exposure moved off the ceiling. — Ch. 35
  • Safety factor. — Ch. 22
  • Safety impact review — Ch. 24
  • safety impact review — Ch. 24
  • Safety inspection frequency and quality — Ch. 24
  • safety is a property of the production system — Ch. 26
  • Safety is a property of the production system — Ch. 37
  • safety is not a line item. — Ch. 20 21
  • Safety is the floor, not a corner. — Ch. 1
  • Safety margin — Ch. 24
  • safety obligations above the regulatory minimum — Ch. 7
  • Safety observations, incidents, and near-misses — Ch. 26
  • Safety planning. — Ch. 35
  • safety precautions — Ch. 25
  • Safety program — Ch. 13
  • Safety record — Ch. 13
  • Safety records — Ch. 26
  • safety risk — Ch. 13
  • Safety. — Ch. 8
  • sail area matters more than weight. — Ch. 18
  • Sales and use tax — Ch. 16
  • same — Ch. 38
  • Same curve. — Ch. 36
  • same day — Ch. 26
  • Same day — Ch. 31
  • same period of project completion — Ch. 33
  • same two numbers — Ch. 14
  • Samples — Ch. 25
  • samples statistically by lot — Ch. 38
  • Sanitary and vent. — Ch. 10
  • Sanitation and its placement — Ch. 18
  • saw-cutting for MEP penetrations — Ch. 13
  • Say it out loud at the pre-construction meeting — Ch. 37
  • say nothing — Ch. 41
  • Scaffold engineering — Ch. 25
  • scaffolds are shared. — Ch. 22
  • Scaffolds. — Ch. 24
  • scale — Ch. 7
  • scan the receiving structure — Ch. 39
  • Scan-to-BIM — Ch. 39
  • Schedule — Ch. 11 7
  • schedule — Ch. 36 7
  • Schedule and duty to man — Ch. 16
  • schedule and the cost report — Ch. 21
  • Schedule commitments — Ch. 17
  • schedule driver — Ch. 37
  • schedule gate — Ch. 37
  • Schedule impact — Ch. 35
  • Schedule impact. — Ch. 7
  • schedule implication — Ch. 10
  • schedule narrative — Ch. 29
  • schedule of values — Ch. 13 32 4
  • Schedule of values — Ch. 17 28
  • schedule pressure index — Ch. 24
  • schedule pressure is a hazard. — Ch. 38
  • Schedule pressure is a hazard. — Ch. 40 8
  • schedule recovery — Ch. 6
  • Schedule requirements — Ch. 15
  • schedule risk — Ch. 13
  • Schedule risk analysis and generative options — Ch. 39
  • Schedule status against baseline — Ch. 26
  • Schedule training before you need it — Ch. 40
  • scheduled — Ch. 30
  • scheduled work with a pass/fail — Ch. 36
  • scheduled. — Ch. 30
  • Schedules — Ch. 7
  • schedules — Ch. 7
  • Schedules of countable things — Ch. 7
  • Scheduling / project controls — Ch. 42
  • Scheduling and phasing studies — Ch. 11
  • Scheduling and sequencing — Ch. 36
  • Scheduling logic — Ch. 39
  • Scheduling technique. — Ch. 37
  • SCHEMATIC DESIGN ESTIMATE — Ch. 11
  • Scissor lift — Ch. 21
  • scissor lift — Ch. 24
  • scope — Ch. 22 31
  • Scope — Ch. 39
  • Scope and exclusions — Ch. 16
  • scope and outcomes. — Ch. 42
  • Scope and standard — Ch. 23
  • scope change — Ch. 3
  • Scope creep and the relationship — Ch. 37
  • scope creep and the relationship — Ch. 37
  • SCOPE CUT — Ch. 11
  • scope cut made under time pressure — Ch. 11
  • Scope gap — Ch. 25
  • scope gap — Ch. 25
  • Scope gap between trades — Ch. 12
  • Scope gaps between subcontracts — Ch. 41
  • Scope gaps live between subcontracts — Ch. 19
  • scope gaps live between subcontracts — Ch. 19
  • scope matrix — Ch. 10
  • Scope of cleanup — Ch. 18
  • Scope of the change — Ch. 31
  • scope reduction — Ch. 11
  • scope sheet — Ch. 13 16
  • scope sheet failure — Ch. 16
  • Scope sheets — Ch. 31
  • scored — Ch. 27
  • Screen — Ch. 27
  • screen — Ch. 27 39
  • screen. — Ch. 27
  • SDI — Ch. 5
  • SDI approach, total — Ch. 16
  • sealant joints. — Ch. 9
  • seam — Ch. 7
  • Searching. — Ch. 18
  • Seasonal testing — Ch. 40
  • Seat belts — Ch. 21
  • Secant / tangent pile wall — Ch. 22
  • Secant or tangent pile wall — Ch. 8
  • Second — Ch. 37 41
  • Second crew, stacked. — Ch. 24
  • second identical job. — Ch. 42
  • second list of things somebody has to go fix. — Ch. 27
  • second shift — Ch. 40
  • Second shift. — Ch. 24
  • Second, authority. — Ch. 24
  • Second, backfill protection. — Ch. 9
  • Second, crews C and D collide. — Ch. 38
  • Second, information. — Ch. 33
  • Second, nobody owns it. — Ch. 9
  • Second, tell them exactly where it is — Ch. 31
  • Second, test your retrieval. — Ch. 36
  • Second, the contract is usually unit price — Ch. 38
  • Second, the efficiency loss. — Ch. 20
  • Second, the foreman is the whole ballgame. — Ch. 20
  • Second, the schedule of values. — Ch. 17
  • Second-shift discount — Ch. 29
  • Section — Ch. 7
  • SectionFormat — Ch. 7
  • Sector rotation as a hedge. — Ch. 42
  • Security — Ch. 37
  • Security and neighbors — Ch. 15
  • see note — Ch. 18
  • Segmental — Ch. 38
  • Segregate it at the time. — Ch. 33
  • Segregate the cost — Ch. 38
  • segregated and marked storage — Ch. 16
  • Selection criteria — Ch. 22
  • selections schedule — Ch. 37
  • selectivity. — Ch. 34
  • Self-assessment. — Ch. 42
  • Self-consolidating concrete (SCC). — Ch. 22
  • Self-erecting tower crane — Ch. 21
  • self-normalizing. — Ch. 20
  • self-perform — Ch. 16
  • Self-perform changes everything. — Ch. 42
  • self-perform content — Ch. 15
  • Self-perform direct cost — Ch. 31
  • Self-perform operations — Ch. 42
  • Self-perform superintendent — Ch. 1
  • self-perform the majority of the value — Ch. 38
  • self-performs the majority of the dollar value — Ch. 38
  • send an email summarizing the call — Ch. 25
  • Send one person who can decide. — Ch. 37
  • Send the letter. Every time. — Ch. 5
  • Send written notice. — Ch. 31
  • Senior PM / project executive — Ch. 1
  • Senior project manager — Ch. 42
  • senior project manager — Ch. 42
  • Sep 18, Year 2 — Ch. 10
  • Sep 25 — Ch. 32
  • Sep 3 — Ch. 32
  • Separate fact from position. — Ch. 26
  • Separate the report from the conduct. — Ch. 24
  • Separation — Ch. 18
  • September 15 — Ch. 32
  • September 18 — Ch. 24 33 40
  • September 18 of Year 2 — Ch. 3
  • September 18, Year 2 — Ch. 10 14 29 33 34 36 6
  • September 18, Year 2. — Ch. 4
  • September 24 — Ch. 40
  • September 24 of Year 2 — Ch. 17
  • September 24, Year 2 — Ch. 10 4
  • September 25, Year 1 — Ch. 32
  • September 27, Year 2 — Ch. 30
  • September 28, Year 1 — Ch. 16
  • September 29, Year 2 — Ch. 24
  • September 5 — Ch. 32
  • Sequence — Ch. 11
  • sequence of operations — Ch. 10
  • Sequence validation — Ch. 35
  • Sequence validation. — Ch. 35
  • sequences — Ch. 8
  • Sequencing. — Ch. 36 8
  • serial verification chain — Ch. 40
  • Serious — Ch. 24
  • service — Ch. 10
  • services — Ch. 16
  • set anchor bolts with a rigid template — Ch. 8
  • set of decisions — Ch. 35
  • sets — Ch. 35
  • Setup. — Ch. 33
  • seven or eight minutes — Ch. 15
  • seventy days — Ch. 32
  • seventy-one days — Ch. 29
  • SFCA — Ch. 12
  • shape — Ch. 18
  • Shared with defined rules — Ch. 14
  • shared, consumable asset — Ch. 29
  • She owns some of the penetrations. — Ch. 9
  • Shear studs — Ch. 8
  • sheet number — Ch. 7
  • Sheet piling — Ch. 22 8
  • SHGC — Ch. 9
  • shift to the owner — Ch. 4
  • Shift work and night work. — Ch. 20
  • shifts — Ch. 33
  • Shifts the risk of owner nonpayment — Ch. 32
  • shipping/delivery — Ch. 17
  • Shop drawings — Ch. 25
  • Shop drawings, product data, and samples. — Ch. 7
  • Shore release — Ch. 22
  • shore-release form — Ch. 22
  • Shores in a stack must line up vertically. — Ch. 22
  • Shores removed too early or out of sequence — Ch. 22
  • Shoring and reshoring — Ch. 25
  • Short duration on site — Ch. 37
  • Short tons and metric tonnes. — Ch. 12
  • short, stated window to object — Ch. 38
  • Short-interval / look-ahead — Ch. 14
  • shortened pay cycle — Ch. 16
  • Show me the self-perform productivity factors. — Ch. 28
  • shows up in your WIP schedule — Ch. 4
  • Shrinkage — Ch. 12
  • Shrinkage factor — Ch. 8
  • Sign-off authority and what sign-off means — Ch. 35
  • Sign-off is a document. — Ch. 10
  • signal — Ch. 41
  • Signed the same day — Ch. 26
  • silence — Ch. 20
  • Silence is agreement. — Ch. 26
  • Silica — Ch. 5
  • Silica, noise, and heat — Ch. 38
  • Silica. — Ch. 9
  • Simultaneity Trap — Ch. 39
  • single — Ch. 34
  • single named person — Ch. 26
  • single stream change — Ch. 36
  • Single-family — Ch. 2
  • single-project cap — Ch. 34
  • Single-project limit — Ch. 34
  • single-project or aggregate bonding capacity — Ch. 15
  • Single-source components. — Ch. 16
  • site — Ch. 24
  • Site conditions for cranes. — Ch. 8
  • site earthwork — Ch. 38
  • site knowledge — Ch. 24
  • Site logistics and lift studies — Ch. 11
  • Site logistics and phasing. — Ch. 35
  • Site logistics plan — Ch. 17
  • Site logistics planning — Ch. 39
  • Site restoration — Ch. 40
  • Site rules — Ch. 17
  • site utilities — Ch. 38
  • Site utilities are delivered at 500. — Ch. 35
  • site work — Ch. 37
  • Site work does not go away. — Ch. 37
  • Site-specific logistics safety — Ch. 24
  • site-specific safety plan — Ch. 17
  • Site-specific safety plan — Ch. 24
  • site-specific safety plan (SSSP) — Ch. 24
  • sitework and foundations — Ch. 17
  • six — Ch. 24
  • Six 10-hour days. — Ch. 24
  • six elevated floors — Ch. 36
  • six elevated floors at 16,500 SF each — Ch. 22
  • Six failure modes and their fixes. — Ch. 6
  • six more work days — Ch. 14
  • Six of the fifteen are due before NTP — Ch. 17
  • Six things to carry out of this chapter. — Ch. 29
  • six to seven times — Ch. 38
  • six to ten codes — Ch. 28
  • six-foot-wide primary route — Ch. 18
  • six-mile — Ch. 21
  • six-week look-ahead — Ch. 14
  • sixty houses a year — Ch. 37
  • sixty-eight — Ch. 14
  • Sixty-one cubic yards. — Ch. 20
  • Sixty-two days from the beam to the check — Ch. 32
  • size — Ch. 11
  • size test used as a proxy for a competence test. — Ch. 19
  • size, scope, and a result — Ch. 42
  • Size. — Ch. 10
  • Skew. — Ch. 6
  • Skip a step and you may impair the bond. — Ch. 5
  • Slab on grade also involves — Ch. 8
  • Sleeves and firestopping — Ch. 10
  • Sleeves and penetrations — Ch. 16
  • Slide-in bridge construction — Ch. 38
  • Slip forms — Ch. 22
  • Slips, trips, and falls on the same level. — Ch. 18
  • Sloping / benching — Ch. 22
  • Sloping and benching — Ch. 8
  • Slow crew D — Ch. 38
  • Slow to decide, and prone to changing decisions — Ch. 37
  • Slump — Ch. 8
  • Slurry (diaphragm) wall — Ch. 8
  • Small contractor — Ch. 42
  • Small crews, no safety program — Ch. 37
  • small denominators are noisy — Ch. 28
  • Small denominators lie. — Ch. 30
  • Small reciprocities. — Ch. 41
  • Small tools and consumables — Ch. 12
  • Sofia Marchetti — Ch. 42
  • soft — Ch. 14 36
  • Soft (preferential) logic — Ch. 14
  • soft clash — Ch. 10
  • Soft clash — Ch. 35
  • soft clash with a code dimension attached — Ch. 35
  • Soft subtotal — Ch. 36
  • software — Ch. 37
  • Soil classification governs the allowable slope — Ch. 22
  • Soil evidence — Ch. 15
  • Soil nailing — Ch. 8
  • Soldier pile and lagging — Ch. 22 8
  • some are as short as 48 or 72 hours — Ch. 33
  • Some states have none at all. — Ch. 5
  • Some states have none. — Ch. 20
  • somebody being somewhere dangerous. — Ch. 39
  • Sophisticated subs will refuse — Ch. 32
  • sort all 1,200 into the four categories — Ch. 40
  • sort the list first. — Ch. 23
  • Sort the list first. — Ch. 40
  • Sort, Set in order, Shine, Standardize, Sustain — Ch. 27
  • source — Ch. 31
  • Source — Ch. 40
  • Source control — Ch. 36
  • Source separation. — Ch. 36
  • Space and access — Ch. 27 41
  • Spearin doctrine — Ch. 3 5
  • Spec — Ch. 37
  • special inspection record — Ch. 40
  • Special inspector — Ch. 23
  • special provisions — Ch. 38
  • specialization — Ch. 20
  • Specialty (needle beam, outrigger, bracket) — Ch. 22
  • Specialty exhaust — Ch. 10
  • Specialty trade contractor — Ch. 42
  • Specific and factual — Ch. 41
  • specific to this elevation — Ch. 24
  • specification — Ch. 36 7
  • specification and submittal item — Ch. 35
  • Specifications — Ch. 4 7
  • specified — Ch. 36
  • specified in-place strength — Ch. 23
  • specified strength — Ch. 22
  • Specify strength at 56 or 90 days instead of 28 — Ch. 36
  • Speed up crew C through the rock — Ch. 38
  • Spending the largest sum of their life — Ch. 37
  • SPI — Ch. 30
  • SPI is not schedule. — Ch. 30
  • split the activities by area — Ch. 29
  • split the crew — Ch. 37
  • splitting the disputed activities by area — Ch. 29
  • Spoil, equipment, and material must be set back — Ch. 8
  • sprawl and double handling — Ch. 18
  • spread — Ch. 15
  • Spread (isolated) footing — Ch. 8
  • Sprinkler — Ch. 35
  • Sprinkler mains — Ch. 10
  • SPT blow count (N-value) — Ch. 8
  • SPT blow counts (N-values) — Ch. 8
  • Square feet of slab to cubic yards. — Ch. 12
  • Square feet to square yards. — Ch. 12
  • Stability before release. — Ch. 8
  • stable property of how we build — Ch. 24
  • Staff subtotal — Ch. 13
  • Stage walk at each milestone — Ch. 37
  • staged in the mockup room, not the hoist lobby — Ch. 18
  • Staging and crane — Ch. 15
  • standard drawings — Ch. 38
  • standard of quality — Ch. 9
  • standard specifications — Ch. 38
  • standby — Ch. 33
  • Standby and idle cost — Ch. 13
  • standby rates are lower than operating rates — Ch. 33
  • standing in front of it — Ch. 23
  • standing neutral — Ch. 33
  • Standing water. — Ch. 22
  • standpipe — Ch. 10
  • start — Ch. 40
  • Start and end on time — Ch. 26
  • Start at the required-on-site date. — Ch. 25
  • start dates tied to substantial completion — Ch. 40
  • Start No Earlier Than (SNET) — Ch. 14
  • Start No Later Than (SNLT) — Ch. 14
  • start three more houses — Ch. 37
  • Start-to-Finish — Ch. 14
  • Start-to-Start — Ch. 14
  • started — Ch. 27
  • Starting from the baseline — Ch. 29
  • starting it earlier — Ch. 40
  • starts — Ch. 4
  • starving legitimate risk response — Ch. 6
  • state or local jurisdiction adopts — Ch. 36
  • State plans may set lower triggers. — Ch. 24
  • State the effective date — Ch. 11
  • State the event and its date. — Ch. 26
  • State the impact — Ch. 26
  • stated design wind speed — Ch. 22
  • stated explicitly — Ch. 17
  • Stated hierarchy — Ch. 7
  • stated, testable, and owned. — Ch. 12
  • statement of compliance — Ch. 20
  • Statement of position — Ch. 31
  • statement of special inspections — Ch. 23
  • states the actual measurement — Ch. 25
  • states the conflict without arguing — Ch. 7
  • states which one it used on each line. — Ch. 28
  • static water penetration — Ch. 9
  • status — Ch. 26
  • Status — Ch. 27 7
  • Status distributed — Ch. 26
  • Statute — Ch. 5
  • statute of limitations — Ch. 40
  • statute of repose — Ch. 40
  • Stay-in-place metal deck — Ch. 22
  • stays open — Ch. 7
  • Steel erection — Ch. 17
  • steel erection — Ch. 24 29
  • steel erection start slipped 23 calendar days — Ch. 40
  • Steel erection. — Ch. 22
  • Steel laydown — Ch. 17
  • steering a distribution — Ch. 11
  • Step 2 needs a definition. — Ch. 29
  • Step 6 is where the money and the danger meet. — Ch. 22
  • Step-down — Ch. 32
  • Stick-built — Ch. 9
  • Still costs money. — Ch. 12
  • still present — Ch. 30
  • stipend — Ch. 15 3
  • stipulated sum — Ch. 4
  • Stockpile measurement — Ch. 39
  • Stockpiling — Ch. 18
  • stockpiling is correct — Ch. 18
  • stop — Ch. 4
  • Stop at 17. — Ch. 29
  • stop shipping — Ch. 5
  • Stop the cover. — Ch. 23
  • Stop this specific wall. — Ch. 7
  • stop work and notify — Ch. 6
  • Stop-work authority — Ch. 24
  • stop-work authority named out loud — Ch. 41
  • Stop. — Ch. 38
  • Storage — Ch. 16
  • Storage and inter-job transport. — Ch. 21
  • stored materials — Ch. 32
  • stored on site. — Ch. 39
  • Storefront — Ch. 9
  • Storm. — Ch. 10
  • Stormwater — Ch. 5
  • Stormwater and low-impact development. — Ch. 36
  • Stormwater discharge from the site — Ch. 38
  • stormwater permit issued — Ch. 17
  • Stormwater Pollution Prevention Plan — Ch. 17
  • stormwater pollution prevention plan (SWPPP) — Ch. 36
  • strategic pursuit — Ch. 15
  • Stripping — Ch. 8
  • Stripping and reshoring — Ch. 8
  • Strong — Ch. 33
  • stronger than a measured mile — Ch. 31
  • Struck by falling object — Ch. 24
  • Struck by flying object — Ch. 24
  • Struck by swinging / hoisted load — Ch. 24
  • Struck by vehicle / mobile equipment — Ch. 24
  • struck-by — Ch. 21
  • Struck-by — Ch. 24
  • Struck-by heavy equipment — Ch. 38
  • Struck-by. — Ch. 18 8
  • structural — Ch. 10
  • structural and fixable — Ch. 20
  • Structural capacity. — Ch. 36
  • Structural engineer — Ch. 1
  • Structural fill and rock. — Ch. 15
  • structural performance — Ch. 9
  • Structural steel — Ch. 36 8
  • structural steel frame — Ch. 36
  • structurally produces gaps — Ch. 16
  • structure — Ch. 12
  • Structure — Ch. 22 35
  • structure and enclosure — Ch. 17
  • Structure the SOV to be billable — Ch. 32
  • subcontract — Ch. 16 28
  • Subcontract awarded by Jun 9, Year 1 — Ch. 10
  • Subcontracted direct cost — Ch. 31
  • Subcontracted work — Ch. 31
  • Subcontractor — Ch. 1
  • Subcontractor bonds — Ch. 5
  • Subcontractor collusion — Ch. 15
  • Subcontractor coordination meeting — Ch. 26
  • Subcontractor default — Ch. 6
  • subcontractor default insurance — Ch. 19 6
  • Subcontractor default insurance (SDI) — Ch. 16
  • Subcontractor Default Insurance (SDI) — Ch. 5
  • subcontractor exception — Ch. 5
  • subcontractor expectation memo — Ch. 19
  • Subcontractor kickoff — Ch. 26
  • Subcontractor kickoff meeting(s) — Ch. 17
  • Subcontractor Management Plan — Ch. 19
  • Subcontractor market outreach — Ch. 11
  • subcontractor performance and payment bond — Ch. 16
  • Subcontractor requirements and flow-down — Ch. 24
  • Subcontractors — Ch. 36
  • Subcontractors price a known shopper higher. — Ch. 13
  • Subcontracts and quotes — Ch. 12
  • Submission — Ch. 15
  • Submit on time, every time — Ch. 32
  • submittal — Ch. 22
  • Submittal 08-1200-C — Ch. 27
  • submittal and fabrication lead time — Ch. 9
  • Submittal deadlines — Ch. 17
  • submittal due date — Ch. 25
  • submittal lead time — Ch. 8
  • Submittal log — Ch. 37
  • submittal of the COR — Ch. 31
  • Submittal or approval — Ch. 27
  • submittal-due-from-sub date — Ch. 17
  • Submittal-to-installation chain — Ch. 23
  • Submittals — Ch. 7
  • submittals — Ch. 7
  • Submittals and approvals — Ch. 27
  • Submittals and RFIs visible to the field — Ch. 39
  • Submittals and scheduling — Ch. 13
  • substance use disorder — Ch. 41
  • substantial completion — Ch. 1 16
  • Substantial completion — Ch. 10 4 40
  • SUBSTANTIAL COMPLETION — Ch. 40
  • Substantial completion (SC) — Ch. 40
  • substantial completion September 18 — Ch. 40
  • substantial completion within 26 months of award — Ch. 3
  • substantial deductible — Ch. 5
  • Substantially complete 3 years ago — Ch. 11
  • substitution request — Ch. 11
  • Subsurface utility engineering (SUE) — Ch. 38
  • Subsurface. — Ch. 11
  • Subtotal — Ch. 1 11 12 13 28 3 31 4
  • Subtotal before bond — Ch. 12
  • Subtotal before contingency — Ch. 28
  • Subtotal direct cost — Ch. 38
  • Subtotal E — Ch. 11
  • Subtotal F — Ch. 11
  • Subtotal, direct cost — Ch. 9
  • Subtotal, five jobs — Ch. 2
  • Subtotal, these four items — Ch. 4
  • Subtract delivery time. — Ch. 25
  • Subtract fabrication or manufacturing time — Ch. 25
  • Subtract installation lead. — Ch. 25
  • Subtract the approval cycle — Ch. 25
  • Success criterion (pre-registered) — Ch. 39
  • sue Kessler — Ch. 5
  • Sum every column two ways. — Ch. 13
  • Sum of expected durations — Ch. 6
  • Sum of most-likely durations — Ch. 6
  • sump pumping — Ch. 8
  • Sumps and open pumping — Ch. 22
  • Superintendent — Ch. 1 20 42
  • Superintendent (Margo) — Ch. 18
  • Supervision dilution — Ch. 29
  • Supervision ratio. — Ch. 20
  • Supplementary cementitious materials (SCMs) — Ch. 36
  • Supplementary conditions — Ch. 4 7
  • Supplementation — Ch. 19
  • Supplier / fabricator — Ch. 1
  • Suppliers and fabricators — Ch. 2
  • supply — Ch. 41
  • Support functions do not scale. — Ch. 20
  • Sureties — Ch. 2
  • Surety — Ch. 1
  • surety — Ch. 16 5
  • surety bond — Ch. 34
  • Survey control — Ch. 18
  • Surveying — Ch. 13
  • Suspended (swing) scaffolds — Ch. 9
  • Suspended (two-point swing stage) — Ch. 22
  • Suspension — Ch. 4
  • suspension of the work — Ch. 6
  • Suspension of work — Ch. 33
  • Suspension trauma — Ch. 24
  • Sustainable Sites — Ch. 36
  • sustained — Ch. 29
  • Sweeping — Ch. 18
  • Swell — Ch. 12
  • Swell factor — Ch. 8
  • Swing-radius barricading — Ch. 21
  • SWPPP — Ch. 17 5 8
  • SWPPP permit issued — Ch. 17
  • SY at plan thickness — Ch. 38
  • symptom — Ch. 19
  • system — Ch. 14 24 31 7
  • System / modular — Ch. 22
  • System / NDL warranty — Ch. 9
  • system and building element — Ch. 7
  • System cost per LCY — Ch. 21
  • System cost per loose cubic yard — Ch. 21
  • Systemic — Ch. 24
  • Systems testing — Ch. 23
  • T&M ticket TM-0141 opened. — Ch. 26
  • TAB — Ch. 10
  • TAB complete — Ch. 40
  • TAB report issued and reviewed — Ch. 40
  • TAB report not issued — Ch. 40
  • tacky mats — Ch. 18
  • tag — Ch. 22
  • Taiichi Ohno — Ch. 27
  • Take off in the order the work gets built. — Ch. 12
  • Take the second crew — Ch. 29
  • Takeover — Ch. 5
  • takes — Ch. 15
  • Takt — Ch. 27
  • Takt time planning — Ch. 27
  • talk itself delivered in the language of the crew — Ch. 24
  • tapered — Ch. 9
  • Tapered insulation — Ch. 9
  • Target level drives it nonlinearly. — Ch. 36
  • Target price / target value delivery. — Ch. 4
  • Target Value Design (TVD) — Ch. 11
  • target value design (TVD) — Ch. 27
  • Target value design. — Ch. 3
  • TCO on September 17 — Ch. 40
  • TCPI — Ch. 30
  • TCPI to BAC — Ch. 30
  • Teach-back — Ch. 24
  • Teach-back is the highest-value item on that list — Ch. 41
  • Technical brilliance without communication. — Ch. 42
  • techniques of construction and installation — Ch. 25
  • technology — Ch. 10
  • technology adoption plan — Ch. 39
  • Telehandler — Ch. 21
  • Telematics — Ch. 21
  • Tell people what to do next — Ch. 14
  • Tell Wei Chen today — Ch. 27
  • Temperature. — Ch. 22
  • temporary bracing — Ch. 22
  • Temporary bracing — Ch. 25
  • temporary capping and testing — Ch. 16
  • Temporary certificate of occupancy issued — Ch. 40
  • temporary coalition — Ch. 39
  • Temporary columns and posts — Ch. 22
  • Temporary enclosure — Ch. 22
  • Temporary facilities and utilities — Ch. 13
  • Temporary facilities removal — Ch. 40
  • Temporary heat — Ch. 18 22
  • Temporary lighting. — Ch. 18
  • Temporary or conditional CO (TCO) — Ch. 40
  • Temporary power and GFCI discipline. — Ch. 18 24
  • Temporary power discipline. — Ch. 10
  • temporary power permit — Ch. 40
  • Temporary protection — Ch. 13 16
  • Temporary protection comes off. — Ch. 40
  • Temporary utilities — Ch. 16 17
  • temporary utilities beyond the trailer — Ch. 17
  • Temporary utilities transfer — Ch. 40
  • Temporary work — Ch. 35
  • ten — Ch. 7
  • Ten minutes on day nine — Ch. 33
  • Ten things to check before anyone mobilizes — Ch. 5
  • ten to fifteen minutes — Ch. 26
  • ten to twenty times working capital — Ch. 34
  • ten-hour days, six days a week — Ch. 20
  • Tender — Ch. 5
  • Termination and supplementation — Ch. 16
  • Termination for cause — Ch. 4
  • Termination for convenience — Ch. 4
  • Tessa Bright Homes — Ch. 37
  • Test and balance, air and water — Ch. 40
  • Test and inspection reports — Ch. 40
  • Test each option against the whole problem — Ch. 10
  • Test the forecast with TCPI. — Ch. 30
  • tested, listed assembly — Ch. 7
  • Testing — Ch. 23
  • Testing and inspection — Ch. 16
  • Testing and inspection reports — Ch. 26
  • tests — Ch. 35
  • Text message — Ch. 26
  • that day — Ch. 31
  • That is a 16.5 percent difference — Ch. 20
  • That is a good job — Ch. 42
  • That is achievable — Ch. 30
  • That is the whole instrument. — Ch. 41
  • That is the whole lesson of this section. — Ch. 36
  • That is what a root cause looks like. — Ch. 23
  • That is why the meeting matters. — Ch. 26
  • That is wrong. — Ch. 37
  • That lease expires October 1, Year 2. — Ch. 29
  • That method cannot produce an overrun. Ever. — Ch. 28
  • That ratio is the lesson. — Ch. 28
  • That was the defect. — Ch. 29
  • That works. — Ch. 20
  • the 20th — Ch. 32
  • the 25th — Ch. 32
  • The ability to bid at all. — Ch. 24
  • the absence of a recorded injury — Ch. 24
  • The actual costs were reasonable. — Ch. 33
  • The agenda went out before, and it is followed. — Ch. 41
  • The agenda. — Ch. 19
  • The aging report. — Ch. 25
  • The agreement — Ch. 15 7
  • The AHJ final inspections and life-safety walk — Ch. 40
  • The AHJ is not your adversary. — Ch. 1
  • The airside. — Ch. 10
  • The allowances are guesses. — Ch. 3
  • The amendments are where people get hurt. — Ch. 2
  • The answer is no, until you have the paper. — Ch. 22
  • The anticipated effect — Ch. 33
  • The arithmetic that frames it. — Ch. 15
  • The arithmetic you must be able to do cold — Ch. 37
  • The assignment. — Ch. 40
  • The assumptions. — Ch. 12
  • The authority — Ch. 41
  • The back-check capacity. — Ch. 40
  • The bad RFI. — Ch. 25
  • The balanced bid — Ch. 4
  • The ball-in-court report. — Ch. 25
  • The batch ticket and the placement record. — Ch. 23
  • The bathroom and kitchen plan — Ch. 37
  • The bid leaves early. — Ch. 13
  • The bid or estimate was realistic. — Ch. 33
  • The bid total does not move. — Ch. 38
  • The big one. — Ch. 36
  • The billing cycle is monthly, not continuous. — Ch. 2
  • The bottom of the stack matters. — Ch. 22
  • The budget was never tested — Ch. 11
  • the budgeted value of 48,000 CY. — Ch. 30
  • The buffer gets consumed silently — Ch. 6
  • The builder finances the gap. — Ch. 37
  • the builder is the owner. — Ch. 37
  • the building — Ch. 37
  • The building is now energized for real. — Ch. 40
  • The building permit — Ch. 17
  • The burden multiplier. — Ch. 11
  • The burdened-rate checklist — Ch. 20
  • The burdened-rate trap. — Ch. 31
  • The cascading markup problem. — Ch. 31
  • The cast. — Ch. 1
  • The Certificate of Insurance (COI). — Ch. 5
  • the change since the last accepted update — Ch. 29
  • the change was built before it was priced — Ch. 1
  • The change. — Ch. 31
  • The chart is not a target. — Ch. 21
  • The City — Ch. 4
  • The City pays — Ch. 4
  • The claim and the defense were the same document. — Ch. 33
  • The classification is stale. — Ch. 22
  • the clause — Ch. 4
  • The clause is an unenforceable penalty — Ch. 33
  • The clean handoff. — Ch. 19
  • The clock starts earlier than you think. — Ch. 33
  • The CM who inflates the early budget. — Ch. 11
  • The cold joint. — Ch. 18
  • The commitment is enforceable. — Ch. 38
  • The comp bar. — Ch. 5
  • The completed-contract method. — Ch. 34
  • The compound clock — Ch. 1
  • The concept. — Ch. 33
  • the conflict is almost never about personality — Ch. 41
  • The conflict. — Ch. 9
  • The conflicts that never existed. — Ch. 35
  • The constraint — Ch. 41
  • The contingency is visible — Ch. 3
  • The contract documents — Ch. 7
  • The contract is part of that system. — Ch. 4
  • the contract must say which — Ch. 5
  • The contract provision — Ch. 33
  • the contract sets the percentages. — Ch. 31
  • The contract type — Ch. 3
  • The contract usually dictates the path — Ch. 33
  • the contractor — Ch. 10
  • the contractor is absorbing scope silently — Ch. 31
  • The contractor was not responsible — Ch. 33
  • The control budget — Ch. 28
  • The control network — Ch. 17
  • The controlling employer — Ch. 19
  • The controlling path — Ch. 29
  • The conversions you must know cold — Ch. 8
  • The coordination obligation. — Ch. 19
  • The coordination touch — Ch. 18
  • The core structure of any work zone — Ch. 38
  • The corrected triangle. — Ch. 1
  • The correcting employer — Ch. 19
  • The correction period — Ch. 40
  • The corridor above the ceiling — Ch. 10
  • The cost of time itself — Ch. 12
  • The cost trend, decisively. — Ch. 30
  • The cost-code structure. — Ch. 17
  • The counterpoint, which is also true. — Ch. 36
  • The CPM procedure, complete, on one page. — Ch. 14
  • The craft workforce — Ch. 1
  • The craft workforce is aging. — Ch. 2 20
  • The craft workforce is the row people forget. — Ch. 1
  • The crane — Ch. 18
  • The creating employer — Ch. 19
  • The credential — Ch. 42
  • The credibility of the method is the damages. — Ch. 33
  • The crew is under more pressure — Ch. 22
  • The crew waiting on it is four line items, — Ch. 39
  • The crews are the same crews. — Ch. 37
  • The critical path moved. — Ch. 14
  • The critical path moves. — Ch. 14
  • The criticism. — Ch. 36
  • The daily huddle. — Ch. 24
  • The daily operator inspection — Ch. 21
  • the daily quantity report completion rate. — Ch. 20
  • The data date — Ch. 30
  • the data, not the geometry. — Ch. 35
  • The deadline for reporting — Ch. 41
  • The decision that keeps getting deferred. — Ch. 26
  • The definition. — Ch. 1
  • The delay clause and its flow-down. — Ch. 19
  • The delay taxonomy. — Ch. 29
  • The delivery method — Ch. 3
  • The delivery request form — Ch. 18
  • The design itself — Ch. 36
  • The design professional in writing — Ch. 23
  • The design professional of record, in writing — Ch. 23
  • The designer who under-designs to hit a number. — Ch. 11
  • The designer. — Ch. 7
  • The diagnostic order when a labor code goes bad — Ch. 20
  • The dignity provisions. — Ch. 41
  • The direct cost. — Ch. 39
  • The direct costs of an injury — Ch. 24
  • The disaster avoided — Ch. 39
  • The Displaced Burden — Ch. 39
  • The distribution by trade. — Ch. 40
  • The distribution matrix. — Ch. 17
  • The document — Ch. 12
  • The documentation package — Ch. 36
  • The documentation vocabulary you need. — Ch. 36
  • The dollar value of the error. — Ch. 35
  • The door clock — Ch. 1
  • The duct gives way. — Ch. 35
  • The economic loss rule — Ch. 5
  • The economics are not close. — Ch. 32
  • The eight constraint categories — Ch. 27
  • The eight rules — Ch. 23
  • The eight rules of reading a set — Ch. 7
  • The eight things worth remembering. — Ch. 16
  • The electrical room — Ch. 10
  • The elevator certificates — Ch. 40
  • The elevator subcontractor pulled its field crew — Ch. 33
  • the energy model used — Ch. 36
  • the engineer, not you and not the lab. — Ch. 23
  • the entire closeout ran with zero float — Ch. 40
  • The estimate — Ch. 28
  • The ethical line, stated precisely. — Ch. 32
  • The event or condition — Ch. 33
  • The event. — Ch. 26
  • the excavator governs and never waits on a truck. — Ch. 38
  • The exceptions have a name and a date. — Ch. 19
  • The execution plan decides whether any of it pays — Ch. 35
  • The exposing employer — Ch. 19
  • the extended-GC number is the one people forget — Ch. 1
  • The factory needs continuous volume. — Ch. 37
  • The fee — Ch. 4
  • The fee is disclosed — Ch. 3
  • The fee is largely earned. — Ch. 40
  • the fee is not the profit — Ch. 2
  • The feedback is immediate and physical. — Ch. 42
  • The field mockup — Ch. 9
  • The field of the membrane almost never leaks. — Ch. 9
  • The final payment clause. — Ch. 40
  • The financial reference card. — Ch. 34
  • The finish-to-start assumption — Ch. 27
  • the finishing of it — Ch. 40
  • The fire alarm final acceptance test — Ch. 40
  • The fire chief. — Ch. 3
  • The first and third are staffing decisions — Ch. 41
  • The first build determines the second. — Ch. 11
  • The first house of a new plan. — Ch. 37
  • The five defects that make float disappear. — Ch. 14
  • The five formulas — Ch. 20
  • The five layers of a change order price. — Ch. 31
  • The five money buckets, one line each. — Ch. 6
  • The five segments and their governing risk — Ch. 37
  • The five sentences worth memorizing. — Ch. 14
  • The five-foot line. — Ch. 7
  • The five-minute rating — Ch. 20
  • The five-question test for any risk row. — Ch. 6
  • The fix is a one-page rental log — Ch. 21
  • The fix is a one-page revision log per community — Ch. 37
  • The fix is not to work harder in the last month. — Ch. 40
  • The fixed constraints — Ch. 17
  • The floor line at the CMU-to-wood-frame change — Ch. 9
  • the foreman learns that the plan is fiction. — Ch. 27
  • The foremen and superintendents — Ch. 29
  • The form matters. — Ch. 31
  • The four clocks, for triage. — Ch. 1
  • The four conditions. — Ch. 27
  • The four dispositions and who signs — Ch. 23
  • The four estimates at completion — Ch. 30
  • The four formulas. — Ch. 12
  • The four lines. — Ch. 15
  • The four numbers to carry in your head. — Ch. 6
  • The four questions every owner is really asking. — Ch. 15
  • The four rules that fix a meeting — Ch. 26
  • The four sentences. — Ch. 1
  • The four sources of leverage, in order. — Ch. 19
  • The four sources, and who can change each — Ch. 5
  • The four-word system. — Ch. 27
  • The framework, in five questions. — Ch. 21
  • The framework, in one table. — Ch. 33
  • The garage. — Ch. 15
  • The gas scope shrinks or disappears. — Ch. 36
  • The gating list. — Ch. 25
  • The GC. This becomes general conditions. — Ch. 13
  • The genuine cost is complexity and financing — Ch. 3
  • The genuine value is life-cycle alignment — Ch. 3
  • The GMP proposal — Ch. 11
  • The go/no-go model. — Ch. 15
  • The good RFI. — Ch. 25
  • the grease waste line and interceptor — Ch. 16
  • The gym ceiling — Ch. 10
  • The gymnasium roof-to-wall and parapet — Ch. 9
  • The habit to start now. — Ch. 3
  • The hardest date on the job. — Ch. 38
  • The healthy packages. — Ch. 30
  • The heavy-civil example. — Ch. 8
  • The hiring hall and referrals. — Ch. 20
  • The honest assessment. — Ch. 3
  • The honest counterargument — Ch. 24
  • the hours are not the commitment. — Ch. 41
  • The hours are real. — Ch. 42
  • the house — Ch. 37
  • The idle-equipment trap. — Ch. 31
  • The impact statement — Ch. 25
  • The impact to date. — Ch. 26
  • The indirect costs — Ch. 24
  • The industry in six facts — Ch. 2
  • The injunction is the risk. — Ch. 21
  • The inspection. — Ch. 18 9
  • the instruction traveled outside a contract line. — Ch. 1
  • The insurance. — Ch. 5
  • The interior sequence has two hold points, — Ch. 9
  • the internal hours — Ch. 39
  • The internal project team meeting — Ch. 26
  • The Kessler subcontract — Ch. 5
  • The key plan and the match lines. — Ch. 7
  • The keying meeting always happens too late. — Ch. 9
  • The kitchen hood and its makeup air — Ch. 10
  • The known, priced problem. — Ch. 30
  • The largest beneficiary is not Kestrel. — Ch. 27
  • The largest single source of bias in the system. — Ch. 30
  • The last person — Ch. 40
  • The layers. — Ch. 38
  • The learning curve. — Ch. 20
  • The lesson. — Ch. 18 5
  • the life-cycle column is empty or hand-waved. — Ch. 11
  • The lifecycle, in nine phases. — Ch. 1
  • The line on the schedule simply was not there. — Ch. 38
  • The liquidated damages clause. — Ch. 40
  • The list is distributed daily, by subcontractor, — Ch. 23
  • The locker-room plumbing chase — Ch. 10
  • The log. — Ch. 40
  • the logs. — Ch. 8
  • the low bidder wins. — Ch. 16
  • the magnitude is genuinely uncertain — Ch. 19
  • The mapping is many-to-many and you must own it. — Ch. 30
  • The marginal daily cost — Ch. 22
  • The market changes everything. — Ch. 42
  • The market. — Ch. 37
  • the marks agree with the model — Ch. 39
  • The material/personnel hoist — Ch. 18
  • The measure has to change with the job. — Ch. 41
  • The measure of success is not the phone call. — Ch. 41
  • The mechanism. — Ch. 19 39
  • The medical gas gives way. — Ch. 35
  • The meeting calendar. — Ch. 17
  • The meta-lesson. — Ch. 19
  • The meter clock — Ch. 1
  • The method of measurement — Ch. 38
  • The middle is a fixed-duration purchase. — Ch. 10
  • the milestone by which it must be collected — Ch. 40
  • the mill rolling slot date — Ch. 8
  • The Miller Act — Ch. 5
  • The mistakes with the biggest price tags — Ch. 8
  • The money is not lost. It is late by thirty days. — Ch. 32
  • the monitoring record is your defense. — Ch. 17
  • The monthly checklist, in date order. — Ch. 32
  • The most underrated choice on this list — Ch. 42
  • The next job. — Ch. 40
  • The nine rules — Ch. 37
  • The nine things to carry out of this chapter. — Ch. 32
  • The noise line. — Ch. 30
  • The north arrow. — Ch. 7
  • The notice date — Ch. 31
  • the notice log lives next to the schedule update. — Ch. 29
  • The numbers that should live in your head. — Ch. 1
  • The numbers to carry. — Ch. 15
  • The objective function — Ch. 17
  • The observed condition, stated factually — Ch. 25
  • The occupied building next door. — Ch. 17
  • the one job that should worry you — Ch. 34
  • The one sentence — Ch. 2
  • The one sentence. — Ch. 10
  • The one-page version. — Ch. 11
  • The only number that requires judgment. — Ch. 28
  • The opening two sentences — Ch. 41
  • The opening two sentences. — Ch. 41
  • the optimum size and why. — Ch. 20
  • The other one that is legally required — Ch. 42
  • The other surface. — Ch. 39
  • The outcome — Ch. 41
  • The outcome you want — Ch. 41
  • The outcome you want. — Ch. 41
  • The overtime arithmetic that people get wrong — Ch. 20
  • The owner is moving in. — Ch. 40
  • The pace self-adjusts. — Ch. 20
  • The paid quantity goes down. — Ch. 38
  • The paper is the job. — Ch. 18
  • The pattern. — Ch. 39
  • the paver must never stop. — Ch. 38
  • The people who will do the work. — Ch. 27
  • The percentage-of-completion method. — Ch. 34
  • The performance (laboratory) mockup — Ch. 9
  • the perimeter only — Ch. 12
  • The period is short. — Ch. 29 31
  • The person who does not talk at all. — Ch. 26
  • The person who talks too much. — Ch. 26
  • the person who was there — Ch. 26
  • The phone rings on weekends. — Ch. 42
  • The pipe gives way. — Ch. 35
  • The pipeline is thinner than the demand. — Ch. 2 20
  • The planning fallacy. — Ch. 6
  • the plant cannot feed the pump you rented. — Ch. 21
  • The point of the exercise. — Ch. 10
  • The practical control — Ch. 36
  • The pre-bid meeting. — Ch. 7
  • The pre-installation conference — Ch. 26
  • The pre-punch (yours). — Ch. 23
  • The pre-task plan — Ch. 24
  • The preliminary notice is your list. — Ch. 32
  • The prequalification consequence, worked. — Ch. 24
  • The pressure is measurable and public — Ch. 41
  • The prevailing-wage checklist — Ch. 20
  • The prevention. — Ch. 5
  • The problem. — Ch. 39
  • The product never changes. — Ch. 37
  • The project directory. — Ch. 17
  • The project duration is 103 work days. — Ch. 14
  • The project engineer — Ch. 27
  • the project is built twice. — Ch. 23
  • The project labor agreement (PLA). — Ch. 20
  • The project manager — Ch. 28
  • The project manager who earns field credibility. — Ch. 42
  • The project record will be read by lawyers. — Ch. 25
  • The project. — Ch. 3
  • The projects or experiences — Ch. 42
  • The punch process — Ch. 19
  • the quantity that ends up in the building — Ch. 12
  • The question you ask after an incident — Ch. 24
  • The range is enormous. — Ch. 36
  • The rankings completely inverted. — Ch. 13
  • the reason the first two were tolerated. — Ch. 29
  • The reason to recall this here — Ch. 33
  • The record-keeping requirement. — Ch. 18
  • The reference — Ch. 25
  • The reference card. — Ch. 30
  • the regulation is the floor, not the program. — Ch. 24
  • the regulatory minimum is a floor, not a target. — Ch. 18
  • The relationship clock — Ch. 1
  • the relationship must survive — Ch. 41
  • The relationship. — Ch. 18
  • The relationships end. — Ch. 42
  • The remaining billable value is small — Ch. 32
  • The remedies differ. — Ch. 33
  • The removal sequence is part of the design. — Ch. 22
  • The Repeatability Assumption — Ch. 39
  • The required response date — Ch. 25
  • The requirement — Ch. 23
  • The reshoring scheme is an engineered design. — Ch. 22
  • The result, assembled. — Ch. 33
  • The retention test. — Ch. 3
  • The return is somewhere else. Three places. — Ch. 39
  • The return ratio is roughly 125 to 1 — Ch. 26
  • The revision clouds. — Ch. 7
  • The revision level and the revision block. — Ch. 7
  • The revision-cloud walk. — Ch. 7
  • the RFI line is the softest number on it. — Ch. 35
  • The right answer is Option 1 — Ch. 21
  • The risk moved to whoever is left holding it. — Ch. 11
  • The risk occurs — Ch. 6
  • The risk that creates — Ch. 21
  • The roof — Ch. 10 23
  • The roof is the flashings. — Ch. 9
  • The routing priority convention — Ch. 10
  • The rule. — Ch. 14
  • The runner-up, and it is worth naming. — Ch. 36
  • the savings split matters — Ch. 3
  • The scaffold plank — Ch. 41
  • The schedule and the coordination process — Ch. 19
  • The schedule is not being updated. — Ch. 29
  • The schedule of values is front-loaded. — Ch. 30
  • The schedule of values. — Ch. 17
  • the schedule was not wrong. — Ch. 35
  • The scheduling point is the one people miss. — Ch. 9
  • The scope boundary. — Ch. 12
  • The selection method — Ch. 3
  • The separate time notice was never sent at all. — Ch. 31
  • the sequence — Ch. 37
  • The sequence never changes. — Ch. 37
  • The setup. — Ch. 18
  • The sheet number. — Ch. 7
  • The Simultaneity Trap — Ch. 39
  • The site visit — Ch. 6
  • The site. — Ch. 17
  • The situation. — Ch. 10 11 21 23 24 33 37 39
  • The slot. — Ch. 37
  • The sort. — Ch. 40
  • the source of most litigation — Ch. 7
  • The specialist trap, and how to avoid it. — Ch. 42
  • The specific question — Ch. 25
  • The specificity. — Ch. 40
  • the speed at which problems are detected. — Ch. 34
  • The spoil setback. — Ch. 22
  • The staff is still there. — Ch. 32
  • The stairs — Ch. 18
  • the standard for the remaining 388 — Ch. 19
  • The status column has only four values — Ch. 16
  • The statute of limitations — Ch. 25
  • The statute of repose — Ch. 25
  • The steel delay — Ch. 42
  • The steel delay. — Ch. 1
  • The sub cannot absorb it — Ch. 6
  • The sub does not price it — Ch. 6
  • The subcontractor coordination meeting — Ch. 26
  • the subcontractors — Ch. 25
  • The submittal and procurement log. — Ch. 17
  • The submittal log and the RFI process. — Ch. 37
  • The substantial completion clause. — Ch. 40
  • The summary page. — Ch. 32
  • The superintendent stopping work. — Ch. 37
  • The superintendent who learns the money. — Ch. 42
  • the surety takes weeks to investigate. — Ch. 5
  • The system fix, which is the real answer. — Ch. 23
  • The systemic move, which is the actual lesson. — Ch. 41
  • the TAB report. — Ch. 40
  • The target role — Ch. 42
  • the team and the approach — Ch. 15
  • The team is temporary and turns over constantly — Ch. 41
  • The team. — Ch. 40
  • The technology was never the problem. — Ch. 39
  • The test — Ch. 24
  • The test record itself. — Ch. 23
  • The thesis. — Ch. 15
  • The three arithmetic facts to carry in your head — Ch. 2
  • The three continuous activities. — Ch. 1
  • The three ethical lines, named. — Ch. 19
  • The three ITP point types — Ch. 23
  • The three measurements. — Ch. 39
  • The three questions. — Ch. 15
  • The three sentences to carry out of this chapter — Ch. 20
  • The three things. — Ch. 19
  • The threshold, restated. — Ch. 19 6
  • the tie goes to the party defending. — Ch. 33
  • The time. — Ch. 31
  • The toolbox talk — Ch. 24
  • the trade is handed down. — Ch. 42
  • The traffic control plan (TCP) — Ch. 38
  • The trap. — Ch. 29
  • The tray gives way. — Ch. 35
  • The truth is whatever the record can support — Ch. 25
  • The two capability gaps — Ch. 42
  • The two ladders, on one page. — Ch. 42
  • The two lines. — Ch. 6
  • The unbalanced bid — Ch. 4
  • The undocumented rate was the mistake. — Ch. 12
  • The unit of measure — Ch. 38
  • The unit price carried forward — Ch. 13
  • The unit-price bid schedule — Ch. 38
  • The Unread Dashboard — Ch. 39
  • The update, in four inputs and one rule. — Ch. 29
  • The value engineering was the model. — Ch. 11
  • The variable choices — Ch. 17
  • The vocabulary, straight — Ch. 23
  • The waterside — Ch. 10
  • The weekend problem. — Ch. 18
  • The weekly work plan and constraint log — Ch. 29
  • The weights carry all the meaning. — Ch. 3
  • the whole number — Ch. 13
  • The Willow Street Community Center — Ch. 36
  • The Willow Street Community Center. — Ch. 29
  • The WIP schedule, in one place. — Ch. 34
  • the work is not held hostage to a negotiation. — Ch. 31
  • The work is real and it stays built. — Ch. 42
  • The work moves you. — Ch. 42
  • The work must conform to the contract documents. — Ch. 23
  • Their fee is fixed early and their effort is not. — Ch. 2
  • Then the two structural costs — Ch. 24
  • Then write the basis-of-quantities page — Ch. 12
  • There are cliffs no daily rate compensates — Ch. 40
  • There are no liquidated damages for lateness — Ch. 37
  • There are three reviewers, not one. — Ch. 25
  • There are two critical paths. — Ch. 29
  • There is a closeout line. — Ch. 32
  • There is exactly one current set. — Ch. 7
  • there is no national permit list. — Ch. 17
  • There is no pay item for this. — Ch. 38
  • There is no retention. — Ch. 37
  • there is no universally correct system. — Ch. 8
  • There was no revised job hazard analysis (JHA). — Ch. 31
  • Thermal — Ch. 9
  • thermal — Ch. 9
  • Thermal breaks. — Ch. 9
  • thermal bridges — Ch. 9
  • Thermal bridging — Ch. 36
  • Thermal. — Ch. 9
  • Thermaline Insulation — Ch. 19
  • These are not universal constants. — Ch. 12
  • They are frequently wrong — Ch. 38
  • They are not a claims methodology. — Ch. 20
  • They are not substitutes for each other. — Ch. 23
  • they can be gamed — Ch. 24
  • They do not compound cleanly. — Ch. 20
  • They have not been scaled to the size of the gap — Ch. 20
  • They interact with the building code. — Ch. 7
  • They were never two different tables. — Ch. 24
  • thin margin on a large number. — Ch. 15
  • Thin supervision. — Ch. 24
  • third — Ch. 6
  • Third, escalate to the owner in writing — Ch. 31
  • Third, hindsight contamination. — Ch. 33
  • Third, several steps are queues, not durations. — Ch. 40
  • Third, the fix is visible on the chart itself. — Ch. 38
  • third-party liability claims against you — Ch. 5
  • Third-party verification — Ch. 10
  • thirty to fifty times — Ch. 9
  • thirty-four days — Ch. 29
  • This box does not exist. — Ch. 29
  • This checkpoint joins them. — Ch. 30
  • This is how people get hurt. — Ch. 4
  • this is learned, not innate. — Ch. 41
  • This is not concurrency. — Ch. 33
  • This is the dangerous one. — Ch. 26
  • This is the estimate. Write it down. — Ch. 12
  • This is the failure point. — Ch. 35
  • this is the gate, and it fails it. — Ch. 39
  • This is the most honest method available — Ch. 30
  • This is the part that will teach you the most — Ch. 33
  • This is the real ceiling — Ch. 2
  • This is the rung that pays today — Ch. 35
  • this month and last month — Ch. 29
  • This one is substantially yours — Ch. 36
  • This proposal carries no cost or time impact. — Ch. 25
  • this week — Ch. 19 41
  • those statutes vary substantially by state. — Ch. 4
  • three — Ch. 20 21 28 29
  • three codes you are worried about — Ch. 28
  • Three consecutive periods — Ch. 28
  • three cost codes — Ch. 42
  • three documents — Ch. 5
  • three leadership skills you are weakest in. — Ch. 41
  • Three of five screened out. — Ch. 27
  • Three paths through it. — Ch. 1
  • Three points is not a margin. — Ch. 3
  • three practices you would keep — Ch. 37
  • three qualified, competitive bidders per trade. — Ch. 13
  • Three relationships to build — Ch. 42
  • three scope gaps — Ch. 13
  • three separate decisions — Ch. 3
  • Three to four hours. — Ch. 27
  • three to four weeks. — Ch. 40
  • three weeks before it would have hurt. — Ch. 27
  • three you would abandon — Ch. 37
  • Three, and this is the one that costs people. — Ch. 16
  • Three-hundred-sixty-degree walkthrough capture — Ch. 39
  • three-party — Ch. 5
  • Three. — Ch. 17 22 32 36 39 5
  • Threshold concept. — Ch. 10 12 14 19 25 27 3 33 4 6 7
  • Threshold with sharing — Ch. 4
  • throughput — Ch. 37
  • Thursday — Ch. 1
  • tie the dollars to the event — Ch. 33
  • Tie this back to the steel acceleration. — Ch. 19
  • Tie-ins. — Ch. 21
  • Tiebacks (anchors) — Ch. 22
  • Tier-3 illustrative composite — Ch. 18 24 8
  • Tilt-up — Ch. 8
  • Time — Ch. 11
  • time — Ch. 12 31 33 37 6
  • time but not money — Ch. 33
  • Time extension — Ch. 29
  • time extension — Ch. 29 6
  • Time impact — Ch. 31
  • time impact — Ch. 5
  • time impact analysis — Ch. 29
  • time impact analysis (TIA) — Ch. 29 31
  • Time impact analysis (TIA) — Ch. 33
  • time only, no money — Ch. 33
  • Time to revenue. — Ch. 2
  • Time your presentation against the point weights. — Ch. 15
  • time-and-material (T&M) ticket — Ch. 31
  • Time-and-material tickets — Ch. 26
  • time-location chart — Ch. 38
  • Time. — Ch. 38
  • Timely written notice, every time — Ch. 33
  • Times — Ch. 32
  • Timing — Ch. 34
  • timing and leverage. — Ch. 7
  • Timing is contractual. — Ch. 7
  • to buy one day. — Ch. 20
  • to date — Ch. 26
  • to this site — Ch. 24
  • to-complete performance index (TCPI) — Ch. 30
  • today — Ch. 40
  • together, on the deck, in forty minutes — Ch. 24
  • Tolerance — Ch. 11
  • tolerance stack-up. — Ch. 8
  • Tomorrow she goes to the other builder — Ch. 37
  • TON — Ch. 12 38
  • Too coarse — Ch. 28
  • Too fine — Ch. 28
  • too high — Ch. 21
  • too low — Ch. 21
  • Tool crib and check-out — Ch. 18
  • toolbox talk — Ch. 24
  • Toolbox talk — Ch. 26
  • Toolbox talk relevance — Ch. 24
  • tools — Ch. 35
  • Tools and material handling — Ch. 20
  • Top ten subtotal — Ch. 19
  • Top-down. — Ch. 6
  • top-five risk-register entry — Ch. 17
  • TOTAL — Ch. 11 13 25 31 35
  • Total — Ch. 12 15 16 17 18 19 20 21 22 23 24 25 26 27 30 32 33 35 36 38 39 40 41 6 7 9
  • total — Ch. 14
  • Total AC — Ch. 30
  • Total added controls — Ch. 24
  • Total adjustments — Ch. 13
  • Total architectural — Ch. 7
  • TOTAL ASSETS — Ch. 34
  • TOTAL BID — Ch. 13 38
  • Total bid — Ch. 38
  • total bid — Ch. 38
  • Total bid at estimated quantities — Ch. 4
  • Total change order request — Ch. 31
  • Total commodity-exposed scope — Ch. 4
  • Total completed and stored to date — Ch. 32
  • Total contract sum — Ch. 4
  • Total cost — Ch. 29 37 38
  • Total cost if we accelerate — Ch. 29
  • Total cost incurred — Ch. 31
  • total cost method — Ch. 33
  • total cost method last — Ch. 33
  • Total cost of acceleration — Ch. 14
  • Total cost of quality — Ch. 23
  • Total cost of the 5-day cycle — Ch. 22
  • TOTAL COST OF WORK — Ch. 16
  • Total cost to the project — Ch. 18
  • Total cost to this job — Ch. 22
  • Total craft — Ch. 26
  • Total current assets — Ch. 34
  • Total current liabilities — Ch. 34
  • Total cycle — Ch. 37
  • Total cycle time — Ch. 8
  • TOTAL DIRECT COST OF WORK — Ch. 13
  • Total drawn from contingency — Ch. 28
  • Total earned less retainage — Ch. 32
  • Total enabling cost — Ch. 29
  • Total estimated cost — Ch. 34
  • Total estimated cost at completion — Ch. 34
  • Total EV — Ch. 6
  • Total expected retained loss — Ch. 6
  • Total exposure — Ch. 21 22
  • Total exposure, Option A — Ch. 9
  • Total exposure, Option B — Ch. 9
  • Total fleet cost — Ch. 8
  • Total float — Ch. 14
  • total float — Ch. 14
  • Total float (TF) — Ch. 14
  • total float on the framing activity at the start — Ch. 33
  • Total float, this update against the last five — Ch. 29
  • Total foundation formwork — Ch. 12
  • TOTAL GENERAL CONDITIONS — Ch. 13 4
  • Total in warranty — Ch. 23
  • TOTAL INSIDE THE GMP — Ch. 36
  • TOTAL INSURANCE AND BONDS — Ch. 13
  • Total labor cost variance — Ch. 20 30
  • Total labor hours, both locations — Ch. 39
  • Total liabilities — Ch. 34
  • TOTAL LIABILITIES AND EQUITY — Ch. 34
  • Total logged exposure — Ch. 7
  • Total misses — Ch. 27
  • Total non-productive — Ch. 20
  • Total on estimated quantities — Ch. 15
  • Total one-time mobilization — Ch. 17
  • Total open — Ch. 40
  • Total owning and operating cost (no operator) — Ch. 13
  • TOTAL PAID — Ch. 38
  • Total paid — Ch. 4
  • Total penalty — Ch. 21
  • Total pending-change exposure — Ch. 31
  • total pending-change exposure — Ch. 31
  • Total performed, not invoiced, not in the report — Ch. 28
  • Total prefabricated cost — Ch. 39
  • Total premium — Ch. 5
  • Total prevention cost — Ch. 23
  • Total priced exposure — Ch. 11
  • TOTAL PROJECT BUDGET — Ch. 11
  • Total provable cost lost — Ch. 31
  • Total Recordable Incident Rate (TRIR) — Ch. 24
  • TOTAL RECOVERED — Ch. 38
  • TOTAL REQUIRED CLEARANCE BELOW ANCHOR — Ch. 24
  • Total retainage — Ch. 32
  • Total revenue on the shaft item — Ch. 38
  • total rigging weight — Ch. 21
  • Total savings below the GMP — Ch. 6
  • Total self-perform — Ch. 20
  • Total self-perform concrete labor — Ch. 28
  • Total shortfall — Ch. 38
  • Total slip — Ch. 33
  • Total soft cost to ask the question — Ch. 7
  • Total spread cost — Ch. 38
  • Total suspended — Ch. 21
  • Total to fix now — Ch. 23
  • Total truck cycle — Ch. 38
  • Total uncompleted bonded work — Ch. 2 34
  • Total vertical construction cost — Ch. 37
  • Total weekly cost — Ch. 41
  • Total, 12 weeks — Ch. 22
  • Total, absorbed entirely by Kestrel — Ch. 15
  • Total, nine packages — Ch. 16
  • Totals — Ch. 26 31 33 34 4
  • TOTALS — Ch. 32
  • tower-crane rental invoice — Ch. 1
  • Toyota Production System (TPS) — Ch. 27
  • TPO — Ch. 9
  • traceability — Ch. 14
  • Track currency, not attendance. — Ch. 24
  • Trade — Ch. 7
  • Trade contracts and payment. — Ch. 37
  • Trade flow and work-zone planning. — Ch. 35
  • Trade partner interviews — Ch. 6
  • Trade permits — Ch. 17
  • Trade stacking — Ch. 19 24 27 29 31
  • trade stacking — Ch. 29
  • Trade stacking and congestion. — Ch. 20
  • trades — Ch. 37
  • Traffic and pedestrians — Ch. 15
  • traffic control plan — Ch. 17
  • Trailer at the southwest, inside Gate 1 — Ch. 17
  • Trailers — Ch. 17
  • Training courses, not certifications. — Ch. 42
  • Training currency — Ch. 24
  • Training records — Ch. 40
  • transcription — Ch. 25
  • transfer — Ch. 18 32 6
  • Transfer — Ch. 6
  • transformer — Ch. 17
  • Translated core documents — Ch. 41
  • transmittal — Ch. 25
  • transmittal dates and the review-cycle log — Ch. 9
  • Transmittal with acknowledgment. — Ch. 7
  • Transport — Ch. 27
  • Transport limits govern module size — Ch. 39
  • Transport. — Ch. 37
  • Transposition or spreadsheet formula — Ch. 12
  • Travel — Ch. 18 20
  • Travel. — Ch. 18
  • treatment given — Ch. 24
  • Treats the owner like a buyer. — Ch. 37
  • Trellis Engineering — Ch. 25
  • Trench and excavation collapse. — Ch. 24
  • trench backfill and compaction in the 5-foot zone — Ch. 16
  • Trench box (shield) — Ch. 8
  • Trench shield (trench box) — Ch. 22
  • Trenchless methods — Ch. 38
  • Trend beats level. — Ch. 30
  • Trentwood Mechanical — Ch. 15
  • trespass — Ch. 21
  • Trial batch during preconstruction — Ch. 36
  • Trigger — Ch. 33 40
  • trigger conditions — Ch. 18
  • tripled — Ch. 30
  • Trough. — Ch. 2
  • Truck entrance — Ch. 17
  • Truck route — Ch. 17
  • Truck routes. — Ch. 18
  • truck to crane to final position — Ch. 18
  • Trucks in rotation — Ch. 21
  • Trucks per hour — Ch. 21
  • true concurrency — Ch. 29
  • true north — Ch. 7
  • Trusses — Ch. 8
  • Try it. — Ch. 10 19 3 35
  • Tube and coupler — Ch. 22
  • tuition or credential repayment — Ch. 42
  • turnaround expectations in days — Ch. 17
  • twelve months — Ch. 37
  • Twelve months of actions with dates. — Ch. 42
  • twelve months of measured operating performance — Ch. 36
  • twice-weekly — Ch. 41
  • Twin — Ch. 35
  • two — Ch. 16 29 6
  • two critical paths — Ch. 14
  • two framing crews — Ch. 37
  • Two honest cautions. — Ch. 29
  • Two horizontal control monuments — Ch. 18
  • two inspection hold points — Ch. 10
  • two or more — Ch. 41
  • two parking spaces the adjacent clinic uses — Ch. 1
  • two people read it back digit by digit — Ch. 13
  • two percent — Ch. 21
  • two sets of gang forms. — Ch. 39
  • two taglines — Ch. 24
  • two to four years — Ch. 9
  • two trucks — Ch. 18
  • two work days — Ch. 14
  • two-day inter-trade buffer — Ch. 37
  • two-party — Ch. 5
  • two-sentence justification — Ch. 15 3
  • two-stage wellpoint system — Ch. 22
  • Two-touch rule. — Ch. 23 40
  • Two. — Ch. 17 22 32 36 39 5
  • Type — Ch. 7
  • Type I — Ch. 38 8
  • Type I, decisively — Ch. 38
  • Type II — Ch. 38 8
  • Type II is hard. — Ch. 38
  • type of construction activity — Ch. 18
  • Typical cost — Ch. 33
  • Typical duration — Ch. 33 40
  • Typical use — Ch. 3
  • U-factor — Ch. 9
  • U.S. Bureau of Labor Statistics. — Ch. 42
  • U.S. Green Building Council (USGBC) — Ch. 36
  • Umbrella / excess liability — Ch. 5
  • un-fixable at that point — Ch. 37
  • unbalanced — Ch. 38
  • Unbalanced bidding — Ch. 13
  • unbalanced bidding — Ch. 38 4
  • Unbalanced rates — Ch. 38
  • Unbilled change work — Ch. 34
  • Unbundle packages. — Ch. 19
  • Uncapped consequential damages — Ch. 15
  • Uncertainty — Ch. 6
  • uncertainty retiring — Ch. 11
  • unchanged — Ch. 38
  • Uncharacteristic conflict or anger — Ch. 41
  • Unclear or conflicting contract documents — Ch. 23
  • uncompleted bonded work — Ch. 2
  • Unconditional — Ch. 32 5
  • unconditional — Ch. 32 5
  • Under 50 days — Ch. 31
  • under investigation — Ch. 23
  • Under the membrane is where the money is. — Ch. 9
  • Under two hours, total — Ch. 25
  • Under-billing — Ch. 34
  • under-billings — Ch. 34
  • Under-documents. — Ch. 37
  • Under-reporting — Ch. 24
  • under-resourcing quality and safety — Ch. 6
  • Under-schedules the line. — Ch. 37
  • Under-slab plumbing, under test — Ch. 37
  • under-slab vapor barrier — Ch. 8
  • under-specifies — Ch. 3
  • Underbillings — Ch. 16
  • Underestimates coordination. — Ch. 37
  • Underpinning — Ch. 22
  • understated — Ch. 4
  • Understates early effort. — Ch. 28
  • Unflagged deviation — Ch. 25
  • Uniform Commercial Code (UCC) — Ch. 5
  • uniform, adequate limits — Ch. 5
  • UniFormat — Ch. 11 7
  • UniFormat. — Ch. 7
  • unimpacted — Ch. 31
  • Unimpacted (the measured mile) — Ch. 33
  • Union work is a different build-up. — Ch. 12
  • Unit costs — Ch. 12
  • unit number — Ch. 37
  • unit of measure — Ch. 38
  • unit price — Ch. 2 38 7
  • Unit price — Ch. 4
  • unit price book — Ch. 3
  • Unit prices — Ch. 11 15
  • unit prices — Ch. 15
  • Unit rate — Ch. 20
  • unit rate — Ch. 28
  • Unit rate / productivity — Ch. 28
  • unit rate against a measurable quantity — Ch. 37
  • unit repetition — Ch. 37
  • unit-price — Ch. 37 38 8
  • unit-price heavy-civil contract — Ch. 37
  • Unitized — Ch. 9
  • Units complete — Ch. 30
  • Units in place. — Ch. 32
  • Units installed — Ch. 28
  • University program placement data. — Ch. 42
  • unknown — Ch. 24
  • Unknown — Ch. 38
  • Unknown conditions and disruption — Ch. 37
  • unless your contract says otherwise — Ch. 40
  • Unloading method — Ch. 18
  • Unprotected leading edges and deck openings. — Ch. 8
  • Unread Dashboard — Ch. 39
  • unreadiness — Ch. 27
  • unscreened work plans manufacture stacking. — Ch. 27
  • Unsophisticated subs will sign — Ch. 32
  • Untrained. — Ch. 37
  • Unused talent — Ch. 27
  • unusual nature — Ch. 38
  • Unusual or adverse weather — Ch. 33
  • upper sheet lapping over the lower — Ch. 23
  • upside — Ch. 6
  • upside is capped by the contract — Ch. 15
  • usability — Ch. 28
  • Use as is — Ch. 23
  • use CO monitoring — Ch. 22
  • Use man-hours per unit as your primary measure. — Ch. 20
  • Use the actual table for your assembly. — Ch. 36
  • useless — Ch. 29
  • user cost — Ch. 38
  • Using payment leverage to force a settlement. — Ch. 31
  • Utilities — Ch. 15
  • Utility conflicts — Ch. 6
  • Utility connection and service applications — Ch. 17
  • utility location and protection — Ch. 6
  • utility responsibility matrix — Ch. 17
  • Utility service applications — Ch. 17
  • VAC — Ch. 30
  • validity date — Ch. 12
  • value — Ch. 11 27
  • value engineering — Ch. 3
  • Value engineering (VE) — Ch. 11
  • Value engineering / value analysis — Ch. 11
  • Value engineering is now scope cutting. — Ch. 11
  • Vapor — Ch. 9
  • vapor — Ch. 9
  • variable — Ch. 21
  • Variable — Ch. 38
  • Variable subtotal — Ch. 21
  • Variance — Ch. 28
  • Variance at completion — Ch. 30
  • Variance. — Ch. 28
  • Variances — Ch. 30
  • variation clause. — Ch. 4
  • variation in estimated quantity — Ch. 6
  • variation threshold — Ch. 8
  • Varies enormously — Ch. 32
  • varies enormously by state — Ch. 42
  • varies significantly by jurisdiction — Ch. 3
  • Varies substantially by jurisdiction and contract — Ch. 33
  • varies substantially by state. — Ch. 2
  • Varies. — Ch. 5
  • vary by jurisdiction — Ch. 29
  • vary by jurisdiction and by contract form. — Ch. 29
  • vary by state — Ch. 42
  • vary considerably — Ch. 3
  • vary enormously by state — Ch. 42
  • vary enormously by state and city. — Ch. 42
  • vary significantly by state — Ch. 15
  • vary substantially by jurisdiction — Ch. 40
  • vary substantially by state and change over time — Ch. 13
  • Vary the mix by element. — Ch. 36
  • varying by state — Ch. 5
  • VAV — Ch. 10
  • VDC — Ch. 1 10 35
  • VDC / BIM — Ch. 42
  • VDC / BIM manager — Ch. 1
  • VDC scope — Ch. 7
  • VE-02 — Ch. 11
  • VE-12 — Ch. 11
  • VE-14 — Ch. 11
  • VE-15 — Ch. 11
  • Vegetated (green) roofs — Ch. 36
  • Vegetation. — Ch. 39
  • Vehicle — Ch. 42
  • vehicle allowance tax treatment — Ch. 42
  • vehicle intruding into the work space — Ch. 38
  • ventilate as the manufacturer requires — Ch. 22
  • venue — Ch. 4
  • verbal go-ahead on a Thursday — Ch. 25 26
  • verbal go-ahead on a Thursday. — Ch. 5
  • Verdict on April 16, week 7 — Ch. 25
  • Verification and close-out — Ch. 23
  • Verification of installed work against the model. — Ch. 39
  • verified by trying to start it — Ch. 24
  • Verify before you bid, not after you buy — Ch. 16
  • verify by state — Ch. 5
  • Verify the one that governs your project. — Ch. 5
  • Verify your jurisdiction. — Ch. 5
  • Verify your state. — Ch. 5
  • Verify yours. — Ch. 5
  • Vertical dead load — Ch. 22
  • Vertical live load — Ch. 22
  • Very fast — Ch. 8
  • Very high — Ch. 4 8
  • Very high per element — Ch. 8
  • Very limited grounds — Ch. 5
  • Very narrow grounds only — Ch. 33
  • Very widely, and for years. — Ch. 39
  • Vibration and airblast monitoring — Ch. 38
  • Vibration and impact — Ch. 22
  • virtual design and construction — Ch. 1
  • visible — Ch. 1
  • visible before they are occupied — Ch. 22
  • Visitors — Ch. 26
  • Visual communication — Ch. 41
  • Visual management — Ch. 27
  • VOC content or emissions data — Ch. 36
  • vocabulary and frameworks. — Ch. 42
  • void — Ch. 36
  • Void or restricted in many states — Ch. 5
  • Voids more valid claims than any other clause. — Ch. 4
  • volatile for small firms. — Ch. 16
  • volume — Ch. 34
  • volume buying — Ch. 5
  • voluntary 18 percent participation target — Ch. 19
  • W-1 — Ch. 6
  • W-2 — Ch. 6
  • Wage determination — Ch. 15
  • wage determination — Ch. 20
  • Wage theft. — Ch. 20
  • Waiting — Ch. 18 19 20 27
  • waiver — Ch. 33
  • waiver matrix — Ch. 32
  • Waiver of consequential damages — Ch. 4
  • Waiver of subrogation. — Ch. 5
  • Waivers and releases — Ch. 33
  • waives the claim. — Ch. 5
  • walk it out loud — Ch. 14
  • walkaround — Ch. 24
  • Wall panels — Ch. 37
  • wall surface area — Ch. 35
  • Warranties — Ch. 16 25 40
  • Warranties and guarantees — Ch. 40
  • Warranty — Ch. 16 7
  • warranty — Ch. 7
  • Warranty item — Ch. 23 40
  • Wash-out and tire wash — Ch. 17
  • waste — Ch. 27
  • Waste — Ch. 35
  • Waste management — Ch. 13
  • waste management plan — Ch. 36
  • Water — Ch. 9
  • Water and wastewater plants — Ch. 38
  • water control layer — Ch. 9
  • Water Efficiency — Ch. 36
  • Water in the building damages her work. — Ch. 9
  • Water reuse. — Ch. 36
  • Water, air, vapor, thermal — Ch. 36
  • Water, atmosphere, and adjacent structures — Ch. 22
  • Water-cement ratio (w/c) — Ch. 8
  • water-main relocation — Ch. 17
  • water-resistive barrier (WRB) — Ch. 9
  • Water. — Ch. 39
  • waterproofing — Ch. 8
  • We used all five. — Ch. 24
  • Weakest, and frequently rejected. — Ch. 33
  • Wearables — Ch. 39
  • Weather — Ch. 27 6
  • Weather and temperature. — Ch. 20
  • Weather belongs in the calendar. — Ch. 14
  • Weather calendars — Ch. 14
  • weather triggers — Ch. 18
  • weather window — Ch. 8
  • Weather. — Ch. 11 21 26
  • weathervanes out of service — Ch. 21
  • week 14 — Ch. 3
  • Week 28 is where you make the phone call — Ch. 20
  • week 34 — Ch. 14 28
  • week 49 — Ch. 19
  • Weekly — Ch. 40
  • weekly certified payrolls — Ch. 20
  • Weekly gross — Ch. 20
  • weekly manpower reporting with a stated minimum — Ch. 16
  • weekly work plan and the six-week look-ahead — Ch. 29
  • weekly work plan for the week of April 6. — Ch. 27
  • Weekly written update — Ch. 37
  • weeks — Ch. 22
  • Weeks — Ch. 23
  • weeks 34 through 36 — Ch. 14 29
  • weeks before dried-in — Ch. 9
  • Wei Chen — Ch. 28
  • Weighed versus computed. — Ch. 38
  • Weight tickets go missing. — Ch. 36
  • weight tickets, not intentions. — Ch. 18
  • weighted average date of the spend — Ch. 11
  • Weighted milestones — Ch. 30
  • weighted scoring model — Ch. 15
  • Weighted total (max 130) — Ch. 3
  • well — Ch. 25 38
  • WELL — Ch. 36
  • Wellpoints — Ch. 22
  • wellpoints — Ch. 8
  • Westbrook Ambulatory Surgery Center — Ch. 42
  • Wet work before absorptive materials. — Ch. 36
  • wet-pipe sprinkler system — Ch. 10
  • Wetlands and waters — Ch. 5
  • what — Ch. 19
  • What a good week looks like — Ch. 24
  • What a hazard is — Ch. 24
  • What a normal PPC looks like. — Ch. 27
  • What a real one contains. — Ch. 24
  • What a stale scaffold tag means — Ch. 24
  • What a takeover actually looks like. — Ch. 19
  • What actually works — Ch. 20
  • What configuration — Ch. 7
  • What gets challenged, and how you substantiate it — Ch. 31
  • What happened next on Northgate. — Ch. 33
  • What has genuinely succeeded — Ch. 37
  • what I need from the trade before me. — Ch. 27
  • what I need from them, and by when. — Ch. 1
  • What information to provide — Ch. 40
  • What is an emergency — Ch. 40
  • What is covered and what is not — Ch. 40
  • What is the consequence of late notice — Ch. 33
  • What it actually costs. — Ch. 18
  • What it cannot see. — Ch. 39
  • what it costs if you ignore it for 24 hours — Ch. 1
  • What it costs. — Ch. 22
  • What it does not mean. — Ch. 41
  • What it is — Ch. 36
  • What it is NOT for — Ch. 35
  • What it means for the job. — Ch. 28
  • What it means for you — Ch. 36
  • What Kestrel advised. — Ch. 26
  • What Kestrel is doing. — Ch. 26
  • What Kestrel needs from Meridian. — Ch. 26
  • What Kestrel pays for it. — Ch. 19
  • what load class — Ch. 22
  • What Margo actually said to Yolanda Prieto. — Ch. 19
  • What product — Ch. 7
  • What quality — Ch. 7
  • What starts the clock — Ch. 33
  • What submittals — Ch. 7
  • What the contract says. — Ch. 1 10 11 12 13 14 15 16 17 18 19 2 20 21 22 23 24 25 26 28 29 30 31 32 33 34 35 36 37 38 39 4 40 41 42 5 6 7 8 9
  • What the failure actually cost — Ch. 23
  • What the price includes — Ch. 38
  • What the support does to the neighbors. — Ch. 22
  • What this chapter gives you. — Ch. 22 36 6
  • What those four numbers mean, in plain English. — Ch. 37
  • What to do in a boom. — Ch. 42
  • What to do in a downturn. — Ch. 42
  • What warranty — Ch. 7
  • what was physically done — Ch. 31
  • What we understood you to direct. — Ch. 26
  • What will hurt you — Ch. 3
  • what you approved for payment — Ch. 30
  • What you are doing — Ch. 31
  • What you are doing about it — Ch. 33
  • What you did about it — Ch. 26
  • What you do if it goes badly. — Ch. 41
  • What you hand the AHJ — Ch. 36
  • what you need from the trade before you — Ch. 27
  • What you need to know before you start. — Ch. 41
  • What you need to know first. — Ch. 41
  • what you put in their place to protect yourself. — Ch. 37
  • What you reward is what you get. — Ch. 41
  • What you will check — Ch. 41
  • what you would do in the first hour — Ch. 38
  • What you write down becomes the truth. — Ch. 41
  • What your contract says. — Ch. 25
  • When — Ch. 23
  • when — Ch. 41
  • when hours go down, the hourly burden goes up. — Ch. 20
  • When it surfaces, it surfaces with a name on it. — Ch. 23
  • When safety is decided — Ch. 24
  • when status is a document, it becomes a record. — Ch. 26
  • When the builder is engaged — Ch. 3
  • When the rate is not contractually fixed — Ch. 33
  • When updated — Ch. 24
  • when you act — Ch. 33
  • Where — Ch. 18 23 26 7
  • where — Ch. 41 7
  • Where intermediate form is void. — Ch. 5
  • Where it came from. — Ch. 39
  • Where it landed. — Ch. 31
  • Where lump sum goes wrong. — Ch. 4
  • Where projects get hurt — Ch. 36
  • where the absence hurts. — Ch. 37
  • Where the line falls is a matter of state law. — Ch. 5
  • Where the line is. — Ch. 15 4
  • Where the money went in this chapter — Ch. 23 37 7
  • where the record lives — Ch. 24
  • Where the rows come from, — Ch. 6
  • Where you look for the cause — Ch. 24
  • Whether the item is on the sheet. — Ch. 12
  • Whether the units are right. — Ch. 12
  • which — Ch. 19 20
  • Which crews were sent home or redeployed — Ch. 18
  • Which documents govern — Ch. 35
  • which jobs are in each pile — Ch. 34
  • which level of the hierarchy — Ch. 24
  • which one — Ch. 7
  • which permit governs it in your jurisdiction — Ch. 22
  • which question matters — Ch. 37
  • Which specific activities were affected — Ch. 18
  • which subpart owns which topic — Ch. 24
  • Which system, and who designs it. — Ch. 22
  • who — Ch. 22
  • Who — Ch. 26
  • Who absorbed it — Ch. 4
  • Who attends. — Ch. 19
  • who can stop work — Ch. 24
  • who controls the operator — Ch. 21
  • Who decides — Ch. 33
  • Who does it — Ch. 39
  • who from the installing crew must attend — Ch. 23
  • who has authority to direct the contractor — Ch. 31
  • who has the authority to release it — Ch. 23
  • Who holds the design contract — Ch. 3
  • who inspects it — Ch. 22
  • Who must be there — Ch. 23
  • Who must receive the notice — Ch. 33
  • Who owns cost overrun above the contract price — Ch. 3
  • Who owns design errors and omissions — Ch. 3
  • who owns float — Ch. 29
  • Who owns it. — Ch. 27
  • Who owns layout in each subcontract — Ch. 17
  • Who owns safety — Ch. 24
  • who owns the scaffold — Ch. 22
  • who owns this risk, and who captures this benefit — Ch. 39
  • who owns which risk — Ch. 39
  • who owns which risk and what that costs. — Ch. 4
  • Who pays — Ch. 13
  • who pays for standby time — Ch. 22
  • Who reads it — Ch. 24
  • Who runs it — Ch. 36
  • who signed it. — Ch. 9
  • Who struggles — Ch. 1
  • who talks to the public, and who does not — Ch. 24
  • Who to call — Ch. 40
  • who verifies — Ch. 24
  • whole distribution — Ch. 15
  • whole problem — Ch. 41
  • Whole-building air-leakage test (blower door) — Ch. 9
  • Whole-building air-leakage testing — Ch. 36
  • whose direction — Ch. 31
  • whose float was it — Ch. 31
  • Why — Ch. 26
  • why — Ch. 27
  • Why excessive over-billing is a warning. — Ch. 34
  • Why it is a bad idea anyway. — Ch. 4
  • Why it is normal, and often healthy. — Ch. 34
  • Why it is shaped that way. — Ch. 41
  • Why no other work was available — Ch. 18
  • Why the agency rejects it. — Ch. 38
  • Why the percentage fee is genuinely dangerous. — Ch. 4
  • Why this matters for your notebook. — Ch. 18 24
  • Why this works. — Ch. 1 10 11 12 13 14 15 17 18 19 21 22 23 24 25 26 27 28 29 3 30 31 32 34 35 36 37 38 39 4 40 41 42 5 6 7 8
  • Why you round down. — Ch. 27
  • Why zero days. — Ch. 31
  • Widely, on coordinated projects. — Ch. 39
  • Widely. — Ch. 39
  • will not enforce it. — Ch. 5
  • Willful — Ch. 24
  • Willow Street Community Center — Ch. 1 14 15 18 2 24 26 27 3 32 4 41 5 8 9
  • win work — Ch. 42
  • wind limit — Ch. 24
  • Wind limits for crane operation — Ch. 18
  • Wind on a tall form or a flying table — Ch. 22
  • Window — Ch. 39
  • Window total — Ch. 33
  • windows — Ch. 33
  • Windows / contemporaneous period analysis — Ch. 33
  • Winter conditions — Ch. 16
  • Winter conditions. — Ch. 15
  • WIP — Ch. 37 5
  • wish — Ch. 35
  • with — Ch. 24
  • with age in days — Ch. 26
  • with amendments. — Ch. 36
  • with defensible logic — Ch. 33
  • with one resubmittal allowance included — Ch. 25
  • with stated assumptions — Ch. 35
  • withdrawal, not correction. — Ch. 15
  • within — Ch. 11
  • without ever lifting the pen. — Ch. 36
  • Without looking back — Ch. 12
  • Witness point (W) — Ch. 23
  • Wk 24 (Thu) — Ch. 31
  • Wk 26 — Ch. 31
  • wood-framed second floor — Ch. 8
  • work — Ch. 16 21
  • work breakdown structure (WBS) — Ch. 14
  • work days — Ch. 14 27
  • work days (WD) — Ch. 14
  • work days 6 through 17 — Ch. 14
  • Work days at 9 hr — Ch. 21
  • Work hours and noise. — Ch. 18
  • Work hours. — Ch. 11
  • Work in waters and wetlands — Ch. 38
  • Work over and near water — Ch. 38
  • Work package / trade / subcontractor — Ch. 23
  • work proceeds — Ch. 23
  • Work rules and jurisdiction. — Ch. 20
  • Work sampling — Ch. 20
  • Work the crossovers. — Ch. 21
  • Work-hour restrictions and noise ordinances. — Ch. 17
  • work-in-progress schedule — Ch. 34
  • Work-zone intrusion — Ch. 38
  • workable backlog — Ch. 27
  • Worked, on Northgate. — Ch. 33
  • Worker classification — Ch. 20
  • Worker height below the D-ring — Ch. 24
  • Workflow / 4D clash — Ch. 35
  • workflow clash — Ch. 10
  • Working capital — Ch. 16 19 2 34
  • working capital, not competence. — Ch. 42
  • working days — Ch. 38
  • Working hours — Ch. 37
  • working radius — Ch. 21
  • Working-capital turnover — Ch. 34
  • Working-capital turnover says stop. — Ch. 34
  • working-day charges — Ch. 38
  • Working-day contract time — Ch. 38
  • workmanship and coordination — Ch. 36
  • workplace management, not clinical advice. — Ch. 41
  • worse — Ch. 38
  • worse, and permanent. — Ch. 36
  • Worst fit — Ch. 4
  • Worst. — Ch. 34
  • Wrap-ups. — Ch. 24
  • Write in a re-scoping mechanism. — Ch. 36
  • Write it in the field, not in the trailer. — Ch. 26
  • Write it so a hostile reader stays fair. — Ch. 33
  • Write the method on the report. — Ch. 28
  • Write the NCR — Ch. 23
  • write the one-sentence justification. — Ch. 30
  • Write the scope sheet before you invent the bids. — Ch. 13
  • written brace-release — Ch. 22
  • Written confirmation of the calculation basis — Ch. 36
  • written contingency — Ch. 38
  • Written notice — Ch. 18
  • written notice — Ch. 5
  • Written notice of a change — Ch. 25
  • Written notice with a cure period — Ch. 40
  • written question for the question period. — Ch. 15
  • written release from the erection engineer — Ch. 22
  • written request within a stated period — Ch. 38
  • written strength result in hand — Ch. 22
  • Written subcontract change order — Ch. 25
  • written talks — Ch. 24
  • written wall-bracing plan — Ch. 22
  • Wrong-sized program for the project — Ch. 35
  • year — Ch. 38
  • YELLOW — Ch. 22
  • YES — Ch. 14 29
  • yes — Ch. 15 5
  • Yes — Ch. 22 25 31 35 38 5
  • Yes, all four. — Ch. 24
  • Yes, immediately, visually — Ch. 35
  • Yes, it is a change — Ch. 31
  • Yes, it is a nonconformance. — Ch. 23
  • Yes. — Ch. 24 40
  • Yes. Select. — Ch. 10
  • Yolanda Prieto — Ch. 19
  • You — Ch. 16 5
  • you — Ch. 33 39 5
  • You are 1,600 lb over. The pick fails. — Ch. 21
  • You are a coordinator. — Ch. 19
  • You are a risk aggregator. — Ch. 19
  • You are accountable for — Ch. 3
  • You are an integrator. — Ch. 19
  • You are designing against an unknown structure. — Ch. 22
  • you are holding a superseded sheet — Ch. 7
  • You are not ready to file. — Ch. 33
  • you are ordinarily the controlling employer. — Ch. 19
  • you assign the cause internally. — Ch. 41
  • you build with people — Ch. 40
  • you build with people, not with materials — Ch. 23
  • you build with people, not with materials. — Ch. 1 20 41
  • You build with people. — Ch. 37
  • you can see it coming from inside the schedule — Ch. 14
  • You cannot coordinate the hoisting or the crane. — Ch. 14
  • you cannot get back to it. — Ch. 9
  • You cannot plan on the forgiving version. — Ch. 5
  • You cannot practice consequence. — Ch. 42
  • You cannot price your way out of a clause. — Ch. 15
  • You cannot prove a delay in it. — Ch. 14
  • You cannot prove the counterfactual. — Ch. 27
  • You cannot report status honestly. — Ch. 14
  • You cannot resequence a problem you find late. — Ch. 9
  • You cannot see it — Ch. 6
  • you cannot self-resolve a conflict. — Ch. 25
  • You cannot self-resolve this. — Ch. 7
  • You cannot sequence enclosure by area. — Ch. 14
  • You control the list. — Ch. 40
  • You did, and you do. — Ch. 32
  • You do not need to have swung a hammer — Ch. 1
  • You do not pay on the drone number. — Ch. 39
  • You do not stop writing tickets. — Ch. 31
  • You find the pattern while it is small. — Ch. 40
  • You get one chance below grade. — Ch. 9
  • you get the market you build. — Ch. 15
  • You give notice of the event, not of the number. — Ch. 29 33
  • You have just given away the impact claim — Ch. 33
  • you have not made a blunder — Ch. 11
  • you have to model it before you can measure it. — Ch. 41
  • You know your walkaway. — Ch. 33
  • You look at transitions. — Ch. 9
  • you might be wrong — Ch. 41
  • You must break the right cylinders. — Ch. 22
  • You owe the more demanding of the two, always. — Ch. 7
  • You spend your money where it can win. — Ch. 33
  • you still stamped it. — Ch. 39
  • you take the work back. — Ch. 41
  • You will run a project on paper. — Ch. 1
  • you. — Ch. 19
  • You. — Ch. 20 7
  • Your best people are gone. — Ch. 40
  • Your best subs stop bidding. — Ch. 13
  • Your credibility becomes an asset. — Ch. 33
  • Your deliverable has four parts. — Ch. 28
  • Your deliverable has six parts. — Ch. 29
  • your entire remaining retention — Ch. 40
  • Your four tasks. — Ch. 37
  • Your leverage is — Ch. 3
  • your organization — Ch. 21
  • your own — Ch. 27
  • your own crew — Ch. 27
  • your own job cost history — Ch. 6
  • Your own network. — Ch. 42
  • your own review and transmittal time — Ch. 17
  • your own summary — Ch. 42
  • your pipeline — Ch. 20
  • Your pre-punch. — Ch. 40
  • Your project completion date did not move. — Ch. 29
  • Your project. — Ch. 31
  • Your proposed solution — Ch. 25
  • your proposed solution with a reason — Ch. 25
  • Your published schedule — Ch. 6
  • your reputation on changes is a priced asset. — Ch. 31
  • Your RFI log is a reputation. — Ch. 25
  • Your role starts — Ch. 3
  • Your subcontractors have sent their B-crews. — Ch. 40
  • Your task. — Ch. 15 17 18 2 24
  • Your tasks. — Ch. 29 6
  • Your three options. — Ch. 24
  • yours — Ch. 22
  • Yourself — Ch. 42
  • zero — Ch. 14 39
  • zero days — Ch. 3
  • zero days of float anywhere in the chain. — Ch. 16
  • zero dollars. — Ch. 39
  • zero float — Ch. 16 29
  • zero for every activity in this network — Ch. 14
  • zero mandatory constraints. — Ch. 14
  • zero recordable injuries — Ch. 24
  • zones — Ch. 27