Chapter 41 Quiz — Leading People

Twenty questions. Answer before you open the <details> — retrieval is what makes it stick, and reading the answer first feels productive and teaches nothing. Scoring guide at the end.


Multiple Choice

1. Roughly what share of the work on a typical commercial construction project is performed by people who do not work for the general contractor?

A. 20–30% B. 40–50% C. 60–70% D. 80–90%

Answer

D — 80–90%. This is the first and most reorganizing of the six structural constraints. It is why influence, not authority, is the operating instrument, and it is the leadership restatement of the Chapter 19 threshold concept: you do not manage the work, you manage the people who contracted to do the work.

2. In the credibility stack, which component is described as the most underrated asset on a construction site?

A. Positional authority B. Competence credibility C. Reliability credibility D. Relational credibility

Answer

C — reliability credibility. Do what you said, when you said. It requires no talent, it accumulates in small units so a new manager can build it fast, and it matters more in construction than elsewhere because every commitment you make is an input to somebody's crew-loading decision.

3. Margo resolved the corridor 2-B conduit conflict in about ninety seconds. What was the operative difference between her approach and Dani's?

A. She had more authority B. She asked a question first and gave Junior a way to be the person who caught it C. She had the coordinated model on a tablet D. She threatened to call Halcyon's owner

Answer

B. Neither authority nor evidence was the variable — Dani had the evidence and Margo never used authority. The question meant the conclusion was produced by Junior's own knowledge, and being the man who caught it rather than the man who got caught is a completely different afternoon in front of his own crew.

4. Which of these is a single escalation test rather than one item in a scoring test?

A. It crosses companies above your level B. The consequence exceeds your authority C. Safety or code D. You already tried the direct path once

Answer

C — safety or code. Two or more of the other tests together warrant escalation. Anything touching anyone's physical exposure, a regulatory issue, or a life-safety system escalates immediately and on its own.

5. Which is not one of the five elements of hard feedback to someone who does not work for you?

A. Delivered privately B. Specific and factual C. Consequence named honestly D. Delivered in the coordination meeting so the record is clear

Answer

D. Public correction of a foreman degrades the instrument you need — his standing with his own crew is the only thing that lets him change anything. Private, specific and factual, about the work rather than the person, consequence named honestly, and a path forward agreed out loud. Documentation follows the conversation; it does not replace it or host it.

6. A crew of 10 at a burdened rate of $66/MH moves from 5 × 8 to 6 × 10, with premium adding $19/burdened hour. Hours rise 50%. By roughly how much does weekly cost rise?

A. 50% B. 57% C. 64% D. 75%

Answer

C — about 64%. $26,400 → $43,400. And that is before productivity erosion: at a sustained-overtime efficiency of 80%, the cost per equivalent man-hour goes from $66.00 to $90.42, a 37% premium on every unit of actual work.

7. In the weeks 34–36 leading-indicator data, near-miss reporting fell to one in week 34. What does that indicate?

A. The acceleration was working and the job had become safer B. The reporting system was broken and needed replacing C. A job under pressure stops talking — the decline is a warning, not a result D. Fewer workers were present that week

Answer

C. Overtime peaked at 21%, nine crews were over fifty hours, five trades were stacked in one zone, and pre-task planning fell eighteen points — the hazard load was at its maximum, not its minimum. Falling near-miss reporting under pressure is the single most dangerous indicator to misread, because it looks like good news.

8. What is the correct construction-site replacement for "any questions?"

A. "Does everybody understand?" B. "Raise your hand if you're unclear" C. Asking someone to explain the task or hazard back to you in their own words D. Handing out a translated copy of the talk afterward

Answer

C — teach-back. "Any questions?" asks an adult to publicly declare confusion in front of a crew, which reliably produces silence in every language. "Tell me how you're going to set that up, so I know I explained it right" puts the burden of a bad explanation on you, where it belongs, and surfaces the misunderstanding while it is still free.

9. Which best describes the correct handling of blame in front of an owner?

A. Absorb it outward and never raise it internally B. Assign it accurately in the room so the record is correct C. Absorb it outward, then assign cause inward, separately and privately D. Defer the question until you have investigated

Answer

C. Outward, you are one company; naming which of you dropped it teaches your owner to manage you individually. Inward, the cause must be found or you have protected the defect rather than the team. Both halves, separated in time — because correcting the system while the person is still standing there having just confessed teaches everyone that confession is followed by correction.

10. Which of these is the best single diagnostic for whether a project is well led?

A. Whether the schedule is on track B. What happens when somebody brings you bad news early C. Whether the safety statistics are good D. Whether subcontractors attend meetings

Answer

B. If early bad news goes badly for the person who brought it, you have attached a cost to the report and no cost at all to silence — and you have designed a project that will surprise you. Everything expensive in this book started as information somebody had early: the submittal that sat eleven days, the verbal directive on CO #14, the unsecured plank.

11. When you delegate a problem rather than a task, which of the following are you obligated to hand over?

A. The outcome only B. The outcome and the deadline C. The outcome, the constraint, the authority, and the reporting deadline D. The outcome, the constraint, the authority, the reporting deadline — and the right to do it differently than you would

Answer

D. The fifth element is the one managers most often withhold. If you delegate a problem and then correct the method, you have delegated nothing and taught the person that the real assignment was to guess your approach. Correct the outcome; leave the method alone unless it is unsafe, unethical, or contractually dangerous — and if it is one of those three, say which one.

12. Teaching a recurring task properly costs about three hours; doing it yourself saves about forty minutes each time. At roughly how many repetitions do you break even?

A. 2 B. 4–5 C. 9–10 D. 20

Answer

B — about 4.5 repetitions. 180 minutes ÷ 40 minutes. Everything after the fifth occurrence is free, and there are perhaps forty recurring tasks in a project engineer's year. Doing it yourself is locally correct and cumulatively fatal.


True / False

Give a one-line justification for each.

13. A manager who never escalates is demonstrating strong ownership of their project.

Answer

False. A manager who escalates everything and one who escalates nothing are both failing, and the second is more common and more dangerous — they are absorbing risk that belongs to the company, and they usually hand up at week six a problem that had a cheap solution at week one.

14. Correcting a foreman in the coordination meeting is acceptable when the issue affects multiple trades.

Answer

False. Multi-trade issues get raised in the meeting; the correction of a person never does. Raise the condition and the required outcome publicly; have the conversation about the person's performance privately, the same day.

15. Barriers to women working in the construction trades are primarily a matter of personal preference rather than site conditions.

Answer

False. The barriers identified most consistently are structural: facilities, ill-fitting PPE, harassment, schedule unpredictability, isolation on a crew, and the absence of sponsorship. Nearly every one is free or costs a few hundred dollars, and nearly every one is inside a superintendent's authority to fix this month.

16. A signed toolbox-talk attendance sheet establishes that the crew received the safety instruction.

Answer

False. It establishes that a talk occurred and who was standing there. Safety instruction that is not understood is not instruction — it is a record of instruction, and the gap between those two things is where people get hurt.

17. Percent plan complete (PPC) primarily measures how hard the trades are working.

Answer

False. It measures whether the plan can be relied on by the next trade — which is why it is binary with no partial credit, and why on Northgate 55% of the misses traced to Kestrel rather than to a subcontractor. It is a measurement of the commitment culture, and the commitment culture is a leadership output.

18. Paying a subcontractor correctly and on time is an accounting function with no leadership content.

Answer

False. It is the second-strongest source of leverage a general contractor has. A subcontractor's foreman does not know your pay cycle, but he knows whether his company is fighting with yours about money — and that fight arrives on your deck as manpower.


Short Answer

19. State the three diagnostic questions that find the real cause of a trade falling behind, in order, and explain why the second one matters most.

Answer

"What's in your way?""What else?""What would it take?"

The second matters most because foremen answer the first question with the answer they think you will accept. The real cause is usually second or third, because it involves another trade, or it involves you. Of the nine constraint categories, eight are things the general contractor either owns or can move; exactly one — labor availability — is the one every manager assumes it is.

20. A crew member you have known for two years has been late three times in two weeks, snapped at an apprentice, and stopped eating with the crew. Describe your response as a manager — what you do, what you say, and the boundary you must not cross.

Answer

Before: find out what your assistance program actually covers and put the number in your pocket, so the offer is concrete. The conversation: privately, off the deck, naming the observable change and not a diagnosis — "You've been in late a few times and that's not like you. Are you all right?" Then stop talking through the silence. Follow with "What do you need?" and offer the number.

The boundary: you are doing workplace management, not clinical work. Do not diagnose, do not counsel, do not speculate about causes, do not discuss it with anyone else on the job, and do not fold it into a performance conversation in that same sitting. And if you believe there is immediate danger, stop managing and connect the person to professional help right then — in the United States that includes the 988 Suicide and Crisis Lifeline by call or text, and 911 for emergencies; crisis resources differ by country, which is why a project should post its own local numbers, in the languages spoken on the site.


Applied Scenario

21. You are the assistant project manager. Your drywall subcontractor's owner calls to say he is pulling eight board hangers off your job Thursday for a hotel project unless he has a wall to close. Your electrical subcontractor is short four people and has been for five weeks. Your own manpower curve shows you released all the work on time and your accountant confirms every application has been paid inside terms. Your superintendent is out sick.

Describe your next four hours. Be specific about the order, who you talk to, what you say first to each, and what you write down.

Answer

Hour 1 — go look, do not phone. Walk the zone. Verify with your own eyes that the work is released: framed, roughed, inspected, clear of stored material, lit, accessible. If any of that is untrue, you have found your real problem and everything below changes.

Hour 1 (continued) — find the physical constraint. Ask the electrical foreman the three questions: what's in your way, what else, what would it take. In the Chapter 19 version of this scene the answer was that eight of eleven rooms were finished and were being held hostage by a habit — the inspection had always been requested one zone at a time and nobody had asked whether it had to be. Look for that shape. The constraint is very often a rule nobody set on purpose.

Hour 2 — split the gate and move the people who are standing still. Call the building department about a partial-area inspection with the area taped, placarded, and the room numbers listed. Then reassign every idle crew to real contract scope elsewhere — not invented work, and nobody sent home.

Hour 3 — the two phone calls, in this order. First the drywall owner: not a plea, a plan. "Here's what I've got booked, here's when you have wall, and here's what I'll do if that date moves." Then the electrical subcontractor. Tell the project manager you are calling his owner before you call her. Then make the call the way Margo made it: facts with numbers, your own house in order stated first, the consequence forecast honestly with a timeline, the diagnostic question, and a real reciprocal offer.

Hour 4 — write it down and tell your people. An email to both subcontractors' project managers and owners containing five things and nothing else: the facts, the commitments made on the calls, the dates, the resequence, and one neutral sentence noting impact. No adjectives. Crew counts by trade and photographs of the taped inspection area in the daily report. Then call your superintendent at home — not for approval, to inform — and text your project manager the two-line version.

What you do not do: send a cure notice, raise your voice, promise the drywall owner a date you do not control, or go around the electrical foreman to his own crew.


Scoring Guide

Score Reading
18–21 You have the framework. Now go run the §41.13 Try It drill in writing, because the gap between knowing this and doing it is entirely in the first two sentences of a real conversation.
15–17 Solid. Reread §41.4 (conflict and escalation) and §41.9 (fatigue and the hours), then retake. 70% or better means you are ready to proceed to Chapter 42.
11–14 Reread §41.2 and §41.3 — the credibility stack, the four behaviors, and the daily craft — and work Case Study 1 with a pen.
Below 11 Reread the chapter. Pay particular attention to the hook, which contains most of the argument in concrete form, and to the six structural constraints in §41.1, which are the frame everything else hangs on.